Run-of-the-river hydroelectricity
Run-of-the-river (ROR) hydroelectricity is a type of hydroelectric generation whereby a considerably smaller water storage called pondage or none is used to supply a power station. Run-of-the-river power plants are classified as with or without pondage. A plant without pondage has no storage and is therefore subjected to seasonal river flows and serves as a peaking power plant while a plant with pondage can regulate water flow and serve either as a peaking or base load power plant.
Concept
Run-of-the-river hydroelectricity is ideal for streams or rivers with a minimum dry weather flow or those regulated by a much larger dam and reservoir upstream.[1][2] A dam – smaller than used for traditional hydro – is required to ensure there is enough water to enter the “penstock” pipes that lead to the lower-elevation turbines.[3] Projects with pondage as opposed to those without pondage can store water for peak load demand or continuously for base load, especially during wet seasons.[1] In general, projects divert some or most of a river’s flow (up to 95% of mean annual discharge)[4] through a pipe and/or tunnel leading to electricity-generating turbines, then return the water back to the river downstream.[3]
ROR projects are dramatically different in design and appearance from conventional hydroelectric projects. Traditional hydro dams store enormous quantities of water in reservoirs, necessitating the flooding of large tracts of land. In contrast, most run-of-river projects do not require a large impoundment of water, which is a key reason why such projects are often referred to as environmentally-friendly, or “green power.”[5]
In recent years, many of the larger ROR projects have been designed to a scale and generating capacity rivaling some traditional hydro dams.[6] For example, one ROR project currently proposed in British Columbia (BC) Canada – one of the world’s new epicentres of run-of-river development – has been designed to generate 1027 megawatts capacity.[7]
Advantages
When developed with care to footprint size and location, ROR hydro projects can create sustainable green energy that minimizes impacts to the surrounding environment and nearby communities.[3] Advantages include:
Cleaner power, less greenhouse gases
Like all hydro-electric power, run-of-the-river hydro harnesses the natural energy of water and gravity—eliminating the need to burn coal or natural gas to generate the electricity needed by consumers and industry.
Less flooding/reservoirs
Substantial flooding of the upper part of the river is not required for smaller-scale run-of-river projects as a large reservoir is not required. As a result, people living at or near the river don't need to be relocated and natural habitats and productive farmlands are not wiped out.
Disadvantages
"Unfirm" power
Run-of-River power is considered an “unfirm” source of power: a run-of-the-river project has little or no capacity for energy storage[8] and hence can't co-ordinate the output of electricity generation to match consumer demand. It thus generates much more power during times when seasonal river flows are high (i.e, spring freshet),[7] and much less during drier summer months.
Availability of sites
The potential power at a site is a result of the head and flow of water. By damming a river, the head is available to generate power at the face of the dam. Where a dam may create a reservoir hundreds of kilometers long to form the head at the face of the dam, in run of the river the head is usually delivered by a canal, pipe or tunnel constructed upstream of the power house. Due to the cost of upstream construction, a steep drop in the river is desirable. At the Three Gorges Dam in China a reservoir has been raised 110 meters over a distance of 660 kilometers. A location with a gradual drop is not suitable for run of the river.
Environmental impacts
While small, well-sited run-of-the-river projects can be developed with minimal environmental impacts,[3] many modern run-of-river projects are larger, with much more significant environmental concerns. For example, Plutonic Power Corp.’s Bute Inlet Hydroelectric Project in BC will see three clusters of run-of-river projects with 17 river diversions;[6] as proposed, this run-of-river project will divert over 90 kilometres of streams and rivers into tunnels and pipelines, requiring 443 km of new transmission line, 267 km of permanent roads, and 142 bridges, to be built in wilderness areas.[9]
British Columbia’s mountainous terrain and wealth of big rivers have made it a global testing ground for run-of-river technology. As of March 2010, there were 628 applications pending for new water licences solely for the purposes of power generation – representing more than 750 potential points of river diversion.[10]
Many of the impacts of this technology are still not understood or well-considered, including the following:
- Diverting large amounts of river water reduces river flows, affecting water velocity and depth, minimizing habitat quality for fish and aquatic organisms; reduced flows can lead to excessively warm water for salmon and other fish in summer.[3] As planned, the Bute Inlet project in BC could divert 95 percent of the mean annual flow in at least three of the rivers.[4]
- New access roads and transmission lines can cause extensive habitat fragmentation for many species, making inevitable the introduction of invasive species and increases in undesirable human activities, like illegal hunting.[3]
- Cumulative impacts – the sum of impacts caused not only by the project, but by roads, transmission lines and all other nearby developments – are difficult to measure.[3] Cumulative impacts are an especially important consideration in areas where projects are clustered in high densities close to sources of electricity demand: for example, of the 628 pending water license applications for hydropower development in British Columbia, roughly one third are located in the southwestern quarter of the province,[10] where human population density and associated environmental impacts are highest.
- Water licenses issued by the BC Ministry of Environment, enabling developers to legally divert rivers[11], have not included clauses that specify changing water entitlements in response to altered conditions; this means that conflicts will arise over the water needed to sustain aquatic life and generate power when river flow becomes more variable or decreases in the future.[10]
Major examples
- Beauharnois Hydroelectric Power Station, 1,673 MW
- Bute Inlet Hydroelectric Project, British Columbia, Canada, 1,026 MW
- Chief Joseph Dam, 2,620 MW
- East Toba/Montrose Hydro Project, British Columbia, Canada, 196 MW
- Forrest Kerr Hydro Project, British Columbia, Canada, 195 MW
- Ghazi-Barotha Hydropower Project on River Indus in Pakistan, 1,450 MW
- La Grande-1 generating station, 1,436 MW
- Satluj Jal Vldyut Nigam Ltd, Satluj River, Shimla, India, 1,500 MW
- Upper Toba Valley, British Columbia, Canada, 123 MW
See also
- Environmental concerns with electricity generation
- Environmental impacts of dams
- Hydropower
- Microhydro systems
- Pumped-storage hydroelectricity
- Small hydro
References
Constructs such as ibid., loc. cit. and idem are discouraged by Wikipedia's style guide for footnotes, as they are easily broken. Please improve this article by replacing them with named references (quick guide), or an abbreviated title. (October 2010) |
- ^ a b Dwivedi, A.K. Raja, Amit Prakash Srivastava, Manish (2006). Power Plant Engineering. New Delhi: New Age International. p. 354. ISBN 8122418317.
{{cite book}}
: CS1 maint: multiple names: authors list (link) - ^ Raghunath, H.M. (2009). Hydrology : principles, analysis, and design (Rev. 2nd ed. ed.). New Delhi: New Age International. p. 288. ISBN 8122418252.
{{cite book}}
:|edition=
has extra text (help) - ^ a b c d e f g Douglas T, Broomhall P, Orr C. (2007). Run-of-the-River Hydropower in BC: A Citizen’s Guide to Understanding Approvals, Impacts and Sustainability of Independent Power Projects. Watershed Watch.
- ^ a b Knight Piesold Consulting. Plutonic Hydro Inc. Bute Inlet Project. Summary of Project Intake and Turbine Parameters. Knight Piesold Consulting.
- ^ Hydromax Energy Limited. Hydromax Energy Limited website.
- ^ a b Plutonic Power (2008). Revised Project Description for Bute Inlet Hydroelectric Project Requirements. P1. Plutonic Power.
- ^ a b Wilderness Committee. Wilderness Committee Comments on the Draft Terms of Reference, Bute Inlet Hydroelectric Private Power Project. Letter to Kathy Eichenberger, Project Assistant Director. P1. Wilderness Committee.
- ^ Douglas, T. (2007). “Green” Hydro Power: Understanding Impacts, Approvals, and Sustainability of Run-of River Independent Power Projects in British Columbia. Watershed Watch.
- ^ Watershed Watch Salmon Society (2009). The Bute Inlet Hydroelectric Project, Backgrounder. Watershed Watch.
- ^ a b c IPPwatch.com website. IPPwatch.com.
- ^ Ibid. P4.
- Freedman, B., 2007, Environmental Science: a Canadian Perspective; 4th edition, Pearson Education Canada, Toronto, pp 226,394.