High-speed rail in Latvia
Current plans call for a high-speed Rail Baltica that will connect the Latvian capital Riga with Pärnu and Tallinn to the north and with Kaunas and Warsaw to the south. Reports in March 2011 indicate plans are moving towards a standard gauge railway.[1]
The project will be financed by the budget of Latvia (50%) and by the European Union TEN-T budget, Structural and Cohesion Funds provided to the EU New Member States. [2]
Railways currently have a low number of passengers along the north-south route in Latvia. If the north-south going railways are converted to standard gauge, the west-east railways are still not likely to be converted, since they are used for freight and passenger trains to Russia.
There is also a consideration to build a new west-east high-speed railway Riga–Moscow[3].
References
- ^ Baltic Course (March 2011). "Rail Baltica's fate to become clearer by the end of May" (PDF).
{{cite web}}
: Cite has empty unknown parameter:|1=
(help) - ^ European Union (November 21, 2007). "Trans-European Transport Network (TEN-T): selection of projects for the TEN-T multi-annual programme 2007-2013 and the annual TEN-T programme 2007" (Press release).
{{cite press release}}
: Cite has empty unknown parameter:|1=
(help) - ^ Augulis: high-speed railroad project between Riga and Moscow must be self-sufficient
External links
- European Commission: Feasibility study on Rail Baltica railways - Main conclusions and recommendations January 2007
- European Commission: Feasibility study on Rail Baltica railways - Annexes January 2007