This is an old revision of this page, as edited by BuildingScientist (talk | contribs) at 11:57, 13 September 2011 (Added measured data on energy use from the University website). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

View of the Bahen Centre from St. George Street
View of the Bahen Centre lobby.
Looking up in the Bahen Centre.
Building stairwell, third storey.

The Bahen Centre for Information Technology is a building at the St. George campus of the University of Toronto. The university website bills it as a "state of the art facility for education of information technology professionals in electrical and computer engineering, computer science and IT research."[1] Thus, it is primarily used by the Faculty of Applied Science and Engineering, the Department of Computer Science and the Department of Mathematics. Notably, it also houses the office of the Division of Engineering Science, along with the engsci common room and student spaces.

The large building contains 50 laboratories, 10 lecture theatres (including the large Adel Sedra Auditorium), 13 tutorial, 9 seminar rooms, and about 300 offices. It is home to the Emerging Communications Technology Institute (formerly the Nortel Institute), the Bell University Laboratories and an Advanced Surface Coatings Laboratory.

History

The Bahen Centre was constructed to meet the growing needs of the university's computer science and electrical and computer engineering programs, as the university doubled the size and funding of the programs. The building was named after engineer John Bahen, president of the Peter Kiewit and Sons building company, who was the leading donor to the C$108 million project. Jeffrey Skoll of eBay also donated $7 million.

The building was constructed at 40 St. George Street, immediately south of Russell Street, and wrapping around the Koffler Centre. This site had been home to several smaller structures. One of these historic buildings was slated to be moved, but was instead incorporated into the design by the architects. The facilities were officially opened October 8, 2002, after opening in the summer of 2002. The sixth floor however was finished only in August 2005 and the Department of Mathematics moved in.

Designed by Diamond + Schmitt Architects Incorporated, the 20,000 gross square metre facility cost $111 million to build. The January 2003 issue of Canadian Architect magazine dubbed the Bahen Centre as "a complex interweaving of urbanity, public space and sustainability." It won the Ontario Association of Architects Award and City of Toronto Architecture and Urban Design Award, both in 2003. It also won a Bronze in the Environmental Category of the National Post Design Exchange Award.

Sustainability

There are many elements of the Bahen Centre the contribute to the overall sustainability of the project. One of the biggest factors is the use of excess steam from the U of T steam plant to provide 92% of the total heating needs for the building.[1] The Building also incorporates sun-shading devices along both the east and south side of the building reducing the amount of cooling needs during the summer months. Diamond + Schmitt also used the program of the building to create the most efficient use of space and add to the sustainability of the building. Due to the large amounts of computers used in the departments, labs were designed to face the coolest wall (north) to provide relief from the heat created by the computers. Incorporated into the building, a two story storm management tank feeds all the water features within the courtyards. This includes the small waterfall which leads from the south of the building to College St. [2] Despite the claims of sustainability, the center used almost 470 kWh/m2 of energy in 2009-2010 U of T Campus Environmental Footprint, compared to the average of new commercial buildings in the 300-350 range.

Trivia

  • The Bahen Centre lost the bid to host both the Wikimania 2006 and Wikimania 2009[3] conferences.
  • An action scene of an episode of the 4th season of the series Flashpoint has been shot in the central stairs from the 5th to the 7th floor of the building during the night of the 2/18/2011.

References and footnotes

  1. ^ Canadian Architect, January 2003. “Green Giant.” Marco Polo
  2. ^ www.dsai.ca
  3. ^ Toronto's Wikimania 2009 bid page

References


  • University of Toronto Capital Projects: The Bahen Centre for Information Technology
  • Marco Polo (2003). "Green Giant". Canadian Architect. Retrieved 2007-03-03. {{cite web}}: Unknown parameter |month= ignored (help)

43°39′34.5″N 79°23′50″W / 43.659583°N 79.39722°W / 43.659583; -79.39722