Jump to content

Accra Skytrain

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Bearcat (talk | contribs) at 08:14, 5 October 2011 (categorization/tagging using AWB). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Accra monorail
Overview
LocaleAccra
Transit typeMonorail
Number of lines1
Number of stations16
Daily ridership700.000 (planned)
Operation
Began operation2012
Operator(s)Accra Metripolitan Area
Number of vehicles27
Technical
System length8 mi (13 km)

work is going on, the proposed Monorail project will take 1 year to be completed, and will provide over 15,000 jobs during the construction. when completed is expected to offer over 1,000 full time jobs to the Ghanaiaan Public.