Jump to content

Airbus A300

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Martin villafuerte85 (talk | contribs) at 20:09, 29 July 2012 (Specifications). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

A300
Libyan Arab Airlines A300B4-600R at Malta International Airport in 2002
Role Wide-body jet airliner
National origin Multi-national
Manufacturer Airbus
First flight 28 October 1972
Introduction 30 May 1974 with Air France
Status Out of production, in service
Primary users FedEx Express
UPS Airlines
Mahan Air
Iran Air
Thai Airways International
Produced 1974–2007
Number built 561[1]
Variants A300-600ST Beluga
Airbus A310
Developed into Airbus A330
Airbus A340

The Airbus A300 is a short- to medium-range widebody jet airliner. Launched in 1972 as the world's first twin-engined widebody, it was the first product of Airbus Industrie, a consortium of European aerospace companies, fully owned today by EADS. The A300 can typically seat 266 passengers in a two-class layout, with a maximum range of 4,070 nautical miles (7,540 km) when fully loaded, depending on model.

Launch customer Air France introduced the type into service on 30 May 1974. Production of the A300 ceased in July 2007, along with its smaller A310 derivative. Freighter sales for which the A300 competed are to be fulfilled by a new A330-200F derivative.[2]

Development

The mission requirements were given in 1966 by Frank Kolk, an American Airlines executive, for a Boeing 727 replacement on busy short- to medium-range routes such as United States transcontinental flights. His brief included a passenger capacity of 250 to 300 seated in a twin-aisle configuration and fitted with two engines, with the capability of carrying full passengers without penalty from high-altitude airports like Denver. American manufacturers responded with widebody trijets, the McDonnell Douglas DC-10 and the Lockheed L-1011 Tristar, as twinjets were banned from many routes by the FAA.

An American Airlines A300B4-605R landing at John F. Kennedy International Airport, New York in 2005. On 29 August 2009 American Airlines retired all A300 aircraft.

In September 1967, the British, French, and German governments signed a Memorandum of Understanding (MoU) to start development of the 300-seat Airbus A300. An earlier announcement had been made in July 1967, but at that time the announcement had been clouded by the British Government's support for the Airbus, which coincided with its refusal to back British Aircraft Corporation's (BAC) proposed competitor, a development of the BAC 1-11, despite a preference for the latter expressed by British European Airways (BEA).

In the months following this agreement, both the French and British governments expressed doubts about the aircraft. Another problem was the requirement for a new engine to be developed by Rolls-Royce, the triple-spool RB207 of 47,500 lbf.[3] In December 1968, the French and British partner companies (Sud Aviation and Hawker Siddeley) proposed a revised configuration, the 250-seat Airbus A250. Renamed the A300B, the aircraft would not require new engines, reducing development costs. To attract potential US customers, American General Electric CF6-50 engines powered the A300 instead of the British RB207. The British government was upset and withdrew from the venture; however, the British firm Hawker-Siddeley stayed on as a contractor, developing the wings for the A300, which were pivotal in later versions' impressive performance from short domestic to long intercontinental flights.[citation needed] (Years later, through British Aerospace, the UK re-entered the consortium.)

A Lufthansa A300B4-603 departs London Heathrow Airport, England in 2007. On 1 July 2009 Lufthansa retired their A300 fleet.

Airbus Industrie was formally set up in 1970 following an agreement between Aérospatiale (France) and the antecedents to Deutsche Aerospace (Germany). They were joined by the Spanish CASA in 1971. Each company would deliver its sections as fully equipped, ready-to-fly items.

In 1972 the A300 made its maiden flight. The first production model, the A300B2, entered service in 1974 followed by the A300B4 one year later. Initially the success of the consortium was poor, but by 1979 there were 81 aircraft in service. It was the launch of the A320 in 1987 that established Airbus as a major player in the aircraft market — the aircraft had over 400 orders before it first flew, compared to 15 for the A300 in 1972.

The A300 was the first airliner to use just-in-time manufacturing techniques. Complete aircraft sections were manufactured by consortium partners all over Europe. These were airlifted to the final assembly line at Toulouse-Blagnac by a fleet of Boeing 377-derived Aero Spacelines Super Guppy aircraft. Originally devised as a way to share the work among Airbus' partners without the expense of two assembly lines, it turned out to be a more efficient way of building aircraft (more flexible and reduced costs) as opposed to building the whole aircraft at one site.

The A300 cemented European cooperation in aviation. Its first flight was commemorated on a French three franc stamp.

Design

Airbus A300 fuselage cross-section, showing the passenger compartment above and the baggage area below. On display in the Deutsches Museum in Munich, Germany.
Mahan Air Airbus A300B4-600 lands at Birmingham International Airport, England (2010)

Airbus partners employed the latest technology, some derived from the Concorde. On entry into service in 1974, the A300 was very advanced and influenced later subsonic airliner designs. The technological highlights include:

  • Advanced wings by de Havilland (later BAE Systems) with:
  • 5.64 m (222 in) diameter circular fuselage section for 8-abreast passenger seating and wide enough for 2 LD3 cargo containers side-by-side
  • Structures made from metal billets, reducing weight
  • First airliner to be fitted with wind shear protection
  • Advanced autopilots capable of flying the aircraft from climb-out to landing
  • Electrically controlled braking system

Later A300s incorporate other advanced features such as:

All these made the A300 a substitute for the widebody trijets such as McDonnell Douglas DC-10 and Lockheed L-1011 for short to medium routes. On the early versions, Airbus used the same engines and similar major systems as the DC-10.[citation needed]

Operational history

Air France A300B2 at Farnborough Airshow in 1974.

After the launch, sales of the A300 were weak for some years, with most orders going to airlines that had an obligation to favor the domestically made product – notably Air France and Lufthansa. At one stage, Airbus had 16 "whitetail" A300s – completed but unsold aircraft – sitting on the tarmac. Germanair was the world's first charter airline and Indian Airlines was the world's first domestic airline to purchase the A300. These have now been retired.

In 1974, Korean Air ordered 4 A300s, becoming the first non-European international airline to order Airbus aircraft. Airbus saw South-East Asia as a vital market ready to be opened up and believed Korean Air to be the 'key'.[4]

In 1977, U.S. carrier Eastern Air Lines leased four A300s as an in-service trial. Frank Borman, ex-astronaut and the then CEO, was impressed that the A300 consumed 30% less fuel than his fleet of Tristars and then ordered 23 of the type (This order is often cited as the point at which Airbus came to be seen as a serious competitor to the large American aircraft-manufacturers Boeing and McDonnell Douglas). This was followed by an order from Pan Am. From then on, the A300 family sold well, eventually reaching a total of 878 [1] delivered aircraft.

In December 1977, AeroCóndor Colombia became the first Airbus operator in Latin America, leasing one Airbus A300, named "Ciudad de Barranquilla".

The aircraft found particular favour with Asian airlines, being bought by Japan Air System, Korean Air, China Eastern Airlines, Thai Airways International, Singapore Airlines, Malaysia Airlines, Philippine Airlines, Garuda Indonesia, China Airlines, Pakistan International Airlines, Indian Airlines, Trans Australia Airlines and many others. As Asia did not have restrictions similar to the FAA 60-minutes rule for twin-engine airliners which existed at the time, Asian airlines used A300s for routes across the Bay of Bengal and South China Sea.

China Eastern Airlines A300B4-600R cabin in-flight.

In 1977, the A300B4 became the first ETOPS compliant aircraft – its high performance and safety standards qualified it for Extended Twin Engine Operations over water, providing operators with more versatility in routing. In 1982 Garuda Indonesia became the first airline to fly the A300B4-200FF. By 1981, Airbus was growing rapidly, with over 300 aircraft sold and options for 200 more planes for over forty airlines. Alarmed by the success of the A300, Boeing responded with the new Boeing 767.

The A300 provided Airbus the experience of manufacturing and selling airliners competitively. The basic fuselage of the A300 was later stretched (A330 and A340), shortened (A310), or modified into derivatives (A300-600ST Beluga Super Transporter).The largest freight operator of the A300 is FedEx Express, which, as of January 2012, had 71 A300 aircraft in service. UPS Airlines also operates freighter versions of the A300. The final version was the A300-600R and is rated for 180-minute ETOPS. The A300 has enjoyed renewed interest in the secondhand market for conversion to freighters. The freighter versions – either new-build A300-600s or converted ex-passenger A300-600s, A300B2s and B4s – account for most of the world freighter fleet after the Boeing 747 freighter.

In March 2006 Airbus announced the closure of the A300/A310 line[5] making them the first Airbus aircraft to be discontinued. The final production A300 made its initial flight on 18 April 2007[6] and was delivered on 12 July 2007. It was an A300F freighter for FedEx. Airbus has announced a support package to keep A300s flying commercially until at least 2025.

Variants

This A300B1 was the second A300 ever built and one of the first to enter service with an airline in late 1974. It had been used as a fire brigade training structure at Brussels Airport since 1990 and was destroyed on 9 July 2003.
An Islandsflug Cargo A300C4-605R at Madrid Barajas Airport, Spain. (2006)
The ZERO-G A300 at Cologne Bonn Airport, Germany. (2004)
Airbus A300B4-200 of Singapore Airlines at Farnborough Airshow in 1980.

A300B1

Only two were built: the first prototype, and a second aircraft which was leased in November 1974 to Trans European Airways (TEA). TEA instantly subleased the aircraft for six weeks to Air Algérie. It has accommodation for 300 passengers (TEA) or 323 passengers (Air Algérie) with a maximum weight of 132,000 kg and two General Electric CF6-50A engines of 220 kN thrust.

A300B2

The first production version. Powered by General Electric CF6 or Pratt & Whitney JT9D engines (the same engines that powered the Boeing 747–100, "the original jumbo jet") of between 227 and 236 kN thrust, it entered service with Air France in May 1974. The prototype A300B2 made its first flight on 28 June 1973 and was certificated by the French and German authorities on 15 March 1974 and FAA approval followed on 30 May 1974. The first production A300B2 (A300 number 5) made its maiden flight on 15 April 1974 and was handed over to Air France a few weeks later on 10 May 1974. The A300B2 entered revenue service on 23 May 1974 between Paris and London.

A300B4

The major production version. Features a centre fuel tank for increased fuel capacity (47,500 kg). Production of the B2 and B4 totaled 248. The first A300B4 (the 9th A300) flew on 25 December 1974 and was certificated on 26 March 1975. The first delivery was made to Germanair (which later merged into Hapag Lloyd) on 23 May 1975.

  • A300B4-100: 157.5 Metric Ton MTOW, first delivery to Germanair in 1975.
  • A300B4-200: 165 Metric Ton MTOW, first delivery to Hapag-Lloyd Flug in 1980
  • A300B4-200FF: An A300 with a "forward-facing" crew compartment. The world's first 2-crew widebody airliner. Includes some of the A310's and A300-600's digital avionics. First saw service with Garuda Indonesia in 1982, further customers were VASP, Tunisair, Kar-Air/Finnair and MNG Airlines.
  • A300B4-600: Referred to as the A300-600. See Below.
  • A300C4: Convertible freighter version, with a large cargo door on the port side. First delivered to South African Airways in October 1982.
  • A300F4-203: Freighter version of the A300B4-200. First delivery occurred in 1986, but only very few were built as the A300F4-200 was soon replaced by the more capable A300-600F (official designation: A300F4-600).

A300-600

Officially designated A300B4-600, this version is the same length as the B2 and B4 but has increased space because it uses the A310 rear fuselage and tail. It has higher power CF6-80 or Pratt & Whitney PW4000 engines and uses the Honeywell 331-250 auxiliary power unit (APU).[7] The A300-600 entered service in 1983 with Saudi Arabian Airlines and a total of 313 A300-600s (all versions) have been sold. The A300-600 also has a similar cockpit to the A310, eliminating the need for a flight engineer. The FAA issues a single type rating which allows operation of both the A310 and A300-600.

  • A300-600: (Official designation: A300B4-600) The baseline model of the −600 series.
  • A300-620C: (Official designation: A300C4-620) A convertible freighter version. First delivery December 1985.
  • A300-600F: (Official designation: A300F4-600) The freighter version of the baseline −600.
  • A300-600R: (Official designation: A300B4-600R) The increased range −600, achieved by an additional trim fuel tank in the tail. First delivery in 1988 to American Airlines; all A300s built since 1989 (freighters included) are −600Rs. Japan Air System (later merged in Japan Airlines) took delivery of the last new-built passenger A300, an A300-622R, in November 2002.
  • A300-600RF: (Official designation: A300F4-600R) The freighter version of the −600R. All A300s delivered between November 2002 and 12 July 2007 (last ever A300 delivery) were A300-600RFs.
  • A300-600ST: Commonly referred to as the Airbus Beluga or "Airbus Super Transporter," these five airframes are used by Airbus to ferry parts between the company's disparate manufacturing facilities, thus enabling workshare distribution. They replaced the four Aero Spacelines Super Guppys previously used by Airbus.

A300B10 (A310)

Introduced a shorter fuselage, a new, higher aspect ratio wing, smaller tail and two crew operation. It is available in standard −200 and the Extended range −300 with 9,600 km (5,965 mi) range in both passenger and full cargo versions.

It is also available as a military tanker/transport serving the Canadian Forces and Luftwaffe. Sales total 260, although five of these (ordered by Iraqi Airways) were never built.

Accidents and incidents

File:KhatmanduCrash2.jpg
Wreckage Of PIA Flight 268

As of 2010, the A300 has been involved in 54 accidents and incidents, including 26 hull-losses and 1,434 fatalities.[8]

Specifications

Measurement A300B4 A300-600R A300-600F
Typical capacity 220 passengers (three-class)
266 passengers (two-class)
375 passengers (one-class)
15 (21) pallets
Overall length 54.08 metres (177.4 ft)*
Wingspan 44.85 metres (147.1 ft)
Wing area 260 square metres (2,800 sq ft)
Overall height 16.62 metres (54.5 ft)
Max cabin width 5.28 metres (17.3 ft)
Fuselage diameter 5.64 metres (18.5 ft)
Operating empty weight typical 90,060 kilograms (198,550 lb) 90,900 kilograms (200,400 lb) 81,900 kilograms (180,600 lb)
MTOW 165,000 kilograms (364,000 lb) 171,700 kilograms (378,500 lb) 170,500 kilograms (375,900 lb)
Takeoff field length (MTOW, SL, ISA) N/A 2,324 metres (7,625 ft)
Cruising speed mach 0.78 (833 km/h, 518 mph, 450 knots at 35,000 ft)
Maximum speed mach 0.86 [16] mach 0.82 (876 km/h, 544 mph, 473 knots at 35,000 ft)
Range fully loaded   6,670 kilometres (3,600 nmi) 7,540 kilometres (4,070 nmi) 4,850 kilometres (2,620 nmi)
Maximum fuel capacity   62,900 litres (16,600 US gal) 68,150 litres (18,000 US gal)
Engines CF6-50C2 or JT9D-59A CF6-80C2 or PW4158
Cockpit crew Three Two

Engines

Model Date Engines
A300B2-1A 1974 General Electric CF6-50A
A300B2-1C 1975 General Electric CF6-50C
A300B2K-3C 1976 General Electric CF6-50CR
A300B4-2C 1976 General Electric CF6-50C
A300B4-103 1979 General Electric CF6-50C2
A300B4-120 1979 Pratt & Whitney JT9D-59A
A300B2-203 1980 General Electric CF6-50C2
A300B4-203 1981 General Electric CF6-50C2
A300B4-220 1981 Pratt & Whitney JT9D-59A
A300B4-601 1988 General Electric CF6-80C2A1
A300B4-603 1988 General Electric CF6-80C2A3
A300B4-620 1983 Pratt & Whitney JT9D-7R4H1
A300B4-622 2003 Pratt & Whitney PW4158
A300B4-605R 1988 General Electric CF6-80C2A5
A300B4-622R 1991 Pratt & Whitney PW4158
A300F4-605R 1994 General Electric CF6-80C2A5 or 2A5F
A300F4-622R 2000 Pratt & Whitney PW4158
A300C4-605R 2002 General Electric CF6-80C2A5

Deliveries

Total 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 1991
Deliveries 561 6 9 9 12 8 9 11 8 8 13 6 14 17 23 22 22 25
1990 1989 1988 1987 1986 1985 1984 1983 1982 1981 1980 1979 1978 1977 1976 1975 1974
Deliveries 19 24 17 11 10 16 19 19 46 38 39 26 15 15 13 8 4

See also

Related development

Aircraft of comparable role, configuration, and era

References

References
  1. ^ Airbus A300 Production List – Planespotters.net Just Aviation
  2. ^ "Airbus aims to fill freighter void with A330 derivative". Flight International. 14 March 2006.
  3. ^ http://www.flightglobal.com/pdfarchive/view/1968/1968%20-%200017.html
  4. ^ Champagne... and drought, The story of Airbus from its inception to today.
  5. ^ "A300/A310 Final Assembly to be completed by July 2007". Airbus. 7 March 2006.
  6. ^ "The last A300 makes its maiden flight". Airbus. 18 April 2007.
  7. ^ "Honeywell 331-250 APU". Retrieved 18 March 2011.
  8. ^ "Airbus A300". Aviation Safety Network. 3 July 2010. Archived from the original on 17 July 2010. Retrieved 3 July 2010. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  9. ^ "Navy Missile Downs Iranian Jetliner". Washington Post. 4 July 1988. Retrieved 3 August 2006.
  10. ^ "The Airbus A300". CBC News. 12 November 2001.
  11. ^ incident summary and photos
  12. ^ "PIA Flight 2002 accident". Aviation-safety.net. Retrieved 16 March 2010.
  13. ^ Aviation-Safety.net accident report
  14. ^ "5A-IAY Hull-loss description". Aviation Safety Network. Retrieved 27 August 2011.
  15. ^ "5A-DLZ Criminal occurrence description". Aviation Safety Network. Retrieved 27 August 2011.
  16. ^ "A300 TYPE CERTIFICATE DATA SHEET No. A35EU" (PDF). FAA. 28 May 2010.
Bibliography
  • Gunston, Bill (2009). Airbus: The Complete Story. Sparkford, Yeovil, Somerset, UK: Haynes Publishing. ISBN 978-1-84425-585-6.{{cite book}}: CS1 maint: ref duplicates default (link)
  • Norris, Guy and Mark Wagner (1999). Airbus. Osceola, Wisconsin: MBI Publishing. ISBN 0-7603-0677-X.

Template:Link FA