Jump to content

Rawang-Sungai Gadut Route

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Shahrein (talk | contribs) at 05:03, 9 September 2012. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Template:Infobox Rawang-Seremban Line

Tanjung Malim-Sungai Gadut Route is one of the two KTM Komuter services provided by Keretapi Tanah Melayu. KTM Komuter is an electrified commuter train service first introduced in 1995, catering especially to commuters in Kuala Lumpur and the surrounding suburban areas. It is a popular mode of transportation for commuters working in Kuala Lumpur, as they can travel to the city without the hassle of traffic congestion. Coaches are modern and air-conditioned. For those who drive to the stations/halts, 'Park & Ride' facility is provided at a nominal charge.

Route

Name Type Notes
Tanjung Malim Island & Side Terminus of the Rawang-Tanjung Malim shuttle.
Kuala Kubu Bharu Side
Rasa Side
Batang Kali Side
Serendah Side
Rawang Island & Side Terminus of the commuter and shuttle route.
Kuang Side
Sungai Buloh Side
Kepong Sentral Side
Kepong Side
Segambut Side
Putra Side Walking distance to RapidKL LRT
Bank Negara Side Walking distance to RapidKL LRT
Kuala Lumpur Island & Side Connection to KTM Batu Caves-Port Klang Route, walking distance to RapidKL LRT.
KL Sentral Island connection to KTM Batu Caves-Port Klang Route, RapidKL LRT, KLIA Ekspres and KLIA Transit, walking distance to KL Monorail and RapidKL and Metrobus hubs.
Mid Valley Side
Seputeh Side
Salak Selatan Side Walking distance to RapidKL LRT
Bandar Tasik Selatan Side Connection to RapidKL LRT and KLIA Transit.
Serdang Side
Kajang Island & Side
UKM Side
Bangi Island & Side
Batang Benar Side
Nilai Side
Labu Side
Tiroi Side
Seremban Island & Side
Senawang Side
Sungai Gadut Island The only elevated station in KTM Komuter Line.

Shuttle route

The KTM Komuter service was expanded to include three new stations beyond Rawang on April 21, 2007 under what was formerly known as the Rawang-Rasa shuttle service. The stations are Serendah, Batang Kali, and Rasa. This 22 km stretch is the first portion of the Rawang-Ipoh double tracking and electrification project to become operational. The service was extended to Kuala Kubu Bharu on January 5, 2008. It was further extended to Tanjung Malim on June 1, 2009, and the service is thus renamed as the Rawang-Tanjung Malim shuttle service.

Passengers have to disembark at Rawang and take the Rawang-Tanjung Malim shuttle service for these stations. Service runs at 30 minutes interval. The first and last trains to leave Rawang are at 05:42 and 21:24 while the first and last trains leaving Tanjung Malim are at 05:42 and 21:54. Journey time between Rawang and Tanjung Malim is 25 minutes.

Route Maps

See also