Belgrade–Bar railway
Belgrade–Bar railway | |
---|---|
Overview | |
Owner | Serbian Railways, ŽICG |
Termini | |
Service | |
Operator(s) | Serbian Railways, ŽPCG |
History | |
Opened | 1976 |
Technical | |
Line length | 476 km (296 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Operating speed | ~ 70 km/h (43 mph) design speed 75(80)–120 km/h |
Overview
The Belgrade–Bar railway is a standard gauge railway, 476 km (296 mi) long. Of this length, 301 km (187 mi) of the railway goes through Serbia, and 175 km (109 mi) through Montenegro. It is electrified along the entire corridor (25 kV, 50 Hz AC). It passes through 254 tunnels of total length of 114,435 m (375,443 ft) and over 435 bridges (total length 14,593 m (47,877 ft)). The longest tunnels are "Sozina" 6.17 km (4 mi) and "Zlatibor" 6.139 km (4 mi). The biggest and the best known bridge is Mala Rijeka viaduct, 498 m (1,634 ft) long and 198 m (650 ft) above ground level.
The highest point of the railway is at 1,032 m (3,386 ft) AMSL, at town of Kolašin. The railway descends to 40 m AMSL at Podgorica in a relatively short distance, thus the gradient of 25‰ on this section.
A small 9 km (6 mi) section of the railway actually passes through Bosnia and Herzegovina, near the town of Štrpci, but the trains do not stop there.
When built, it took a train approximately 7 hours to go from Belgrade and Bar, while now takes 11 hours, due to speed restrictions, as the railway cannot safely sustain the projected speeds prior to thorough reconstruction.
History
The decision to build the railway connection between Belgrade and Bar was made in 1952, as a national project of SFRY. However, the construction was passed to SR Serbia and SR Montenegro to build on their own.
The sections of the railway were completed as follows:
- Resnik – Vreoci in 1958
- Podgorica – Bar in 1959
- Vreoci – Valjevo in 1968
- Valjevo – Užice in 1972
- Užice – Podgorica in 1976
The construction works were concluded on 27 November 1975, by joining the railway tracks south of Kolašin.The railway was opened on 28. May 1976. Electrification was completed at the end of 1977.
Maintenance of the Belgrade–Bar railway suffered from chronic underfunding during the 1990s, which has resulted in the railway deteriorating and becoming unsafe. This culminated in the Bioče derailment, when a passenger train derailed, causing the deaths of 47 passengers. As a result, efforts are being made to thoroughly reconstruct the railway.
The Serbian part of the railway was targeted several times by NATO during its bombing campaign in 1999, seriously damaging portions of the railway. Also the small section that passes through Bosnia and Herzegovina was blown up by SFOR ground forces. All of this damage was repaired after the war.