Jump to content

Accra Skytrain

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Masssly (talk | contribs) at 02:06, 24 August 2016 (top: clean up, added orphan tag using AWB). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Accra Monorail
Overview
LocaleAccra
Transit typeMonorail
Number of lines1
Number of stations16
Daily ridership700.000 (planned)
Operation
Operator(s)Accra Metropolitan Area
Number of vehicles27
Technical
System length8 mi (13 km)

Accra Monorail is a planned monorail system for Accra, Greater Accra, Ghana.[1]

Planning is ongoing. The proposed monorail project would take one year to be completed, and would provide over 15,000 jobs during the construction. When completed it is expected to offer over 1,000 full-time jobs to the Ghanaian public.[2]

References

  1. ^ "Monorail system being planned for Accra". Ghana News Agency. 23 July 2010. Retrieved 9 October 2011.
  2. ^ "ICC to Invest U.S.$1.5 Billion Into Accra Monorail Project, Provides Over 15,000 Jobs". The Ghanaian Chronicle. 26 July 2010. Retrieved 9 October 2011.