Chinese replenishment ship Qinghaihu
Class overview | |
---|---|
Builders | Kherson Shipyard, refitted at Dalian Shipyard |
Operators | People's Liberation Army Navy Royal Thai Navy |
Preceded by | Type 905 replenishment tanker |
Succeeded by | Type 903 replenishment ship |
In commission | 1996 |
Completed | 2 |
Active | 1 active in China, 1 active in Thailand |
General characteristics | |
Displacement | 37,000 tonnes |
Length | 188.9m |
Beam | 25.33m |
Draught | 10.41m |
Propulsion | 1 Burmeister & Wain diesel 10,600 hp, 1 shaft |
Speed | 16 knots |
Complement | 125 |
Armament | 4 x H/PJ17 30mm close-in weapons systems[1] |
Aircraft carried | 1 Z-8 helicopter |
Aviation facilities | hangar and flight deck |
The Type 908 (NATO reporting name Fusu-class, also known as Nancang-class) replenishment ship is a class of multi-product replenishment oilers commissioned into the People's Liberation Army Navy and the Royal Thai Navy.[2] The first Type 908 replenishment ship, Qinghaihu, was originally laid down for the Soviet Navy as a Komandarn Fedko class merchant tanker, but construction was halted due to insufficient funds. The ship was then purchased by China as an incomplete vessel in 1993 from post-Soviet Ukraine. The ship has a near sister ship (INS Jyoti (A58)) operating with the Indian Navy. After significant refit, the ship was consecutively renamed the Qinghaihu (885), formerly ex Nancang (Nanyun 953) and ex-Vladimir Peregudov .[3][4][5] Another similar ship was built and sold to Thailand and currently in service with the Royal Thai Navy as HTMS Similan (871).
The Type 908 AOR is the 2nd generation Chinese replenishment ship that is outfitted with a total of six cranes, four oil refuelling stations, and two stores stations. This allows the ship to replenish three warships simultaneously. The ship, through her helicopter facilities, is able to replenish warships operating nearby via vertical replenishment (VERTREP).
Background
The Type 908 class was the second stage in Chinese replenishment ship development and construction. Although considered somewhat successful, the first Fuqing class of replenishment oilers could not completely satisfy the requirements of the People's Liberation Army Navy (PLAN). One of the primary drawbacks of this class was that they are mainly for replenish liquid supplies, i.e. fuel and water. These ships of the 1st stage of the development of Chinese replenishment ships could only replenish extremely limited dry supplies, and are virtually incapable of resupply ammos, because the Chinese industry at the time lacked the capability to provide sounding safety measures for resupplying and storing ammos with fuels. This is one of the two primary constrains that despite the fact that on August 28, 1977, the Central Military Commission (People's Republic of China) ordered the resumption of the development of fleet replenishment ship that is capable of one-stop replenishment, (i.e. being capable of resupply ammos, fuels, water, and solid supplies together by a single ship, a concept first pioneered by United States Navy), the project was eventually put on hold.
The other primary constrain was budget constraints as Chinese economy was near the verge of total collapse resulting from the Cultural Revolution. Eventually, as the Economic reform in the People's Republic of China in 1979 rapidly improved the Chinese economy, the 2nd stage of the development of the Chinese fleet replenishment ship was resumed in 1988, after around a decade of dormancy. PLAN had a lot of expectations for the new class of ship: in addition to being capable of one-stop replenishment, the new ship was also required to be capable of serving as a hospital ship. However, to meet such high expectation of PLAN, costs was driven up multiple times. As the design was completed, the price of the proposed new ship exceeded what PLAN could afford and the project was in danger of being cancelled again.
Origin
Just as the 2nd stage of the development of the Chinese fleet replenishment ship was about to be yet again put on hold, there was an unexpected turn of fortune that saved the project from being scrapped. After the breakup of Soviet Union at the end of 1991, Ukraine was eager to sell a half completed replenishment ship built for the Soviet navy. Originally laid down as Soviet Ship Vladimir Peregudov, a Komandam Fedko class merchant tanker, the ship was modified as a replenishment ship for the Soviet navy, but building work was halted due to insufficient funding. Chinese were interested in the ship and the original chief designer of the proposed 2nd generation Chinese replenishment ship, Chinese Academy of Sciences academician Mr. Zhang Wende (张文德) was named as the head of the Chinese delegation and chief negotiator, and his team was sent to Ukraine to evaluate the ship intended for the former Soviet navy.
The Chinese delegation discovered that the main engine and the generator had been already installed, but not the pipes, cables and wires, overall they considered the ship was in excellent condition. Upon returning China, Zhang Wende and his colleagues strongly suggested to the Chinese authorities to buy the ship, and they were sent to Ukraine for the second time to finalize the deal. Because many of the subsystems of the ship were built in Saint Petersburg, some of Zhang Wende’s team members were also sent to Russia to secure the purchase of these subsystems, which they completed successfully. On November 6, 1992, the deal was formally signed by China and Ukraine, and the original funding for developing the 2nd generation domestic Chinese replenishment ship was diverted to purchase the uncompleted ship for the former-Soviet navy.
Development
On May 1, 1993, the uncompleted former Soviet naval ship was towed to Dalian shipyard from Ukrainian Kherson shipyard. In addition to the hull and subsystems, China also purchased the design, which was immediately modified to meet the Chinese needs. Chinese Academy of Sciences academician Mr. Zhang Wende (张文德), the original chief designer of the 2nd generation domestic Chinese replenishment ship was named as the chief designer and the program manager of this conversion project. The deputy general designer is Mr. Huang Wei (黄蔚), another general engineer of the 701st Institute of China Shipbuilding Industry Corporation (CSIC).[6][7] On May 8, 1996, it entered Chinese service in South Sea Fleet, where it has remained until today. The pennant number was originally Nanyun (南运)-953, but later changed to 885, with name Qinghaihu (青海湖), and this upgraded ship became the 2nd generation Chinese replenishment ship, replacing the originally planned indigenous one.
The conversion project was deemed successful and worthy but Chinese, who had gained important insights on Soviet design principle, core technologies, important subsystems, layout, and other expertise that were difficult for Chinese to obtain, and these valuable knowledge would later help China in designing its next generation replenishment ships. The most important gain, however, was financial. The original funding that was insufficient to develop a proposed indigenous 2nd generation Chinese replenishment ship was not only enough to buy the uncompleted former Soviet ship, but also had enough left to cover the following conversion work. One of the primary areas of improvement of the original former-Soviet design was in damage control, which was woefully inadequate (Rumored due to its original civilian merchant tanker design). Some of the interior wiring was exposed, and the ship's battle damage control system was very limited, with a near absence of internal damage limitation, insufficient fire-suppression system and water-tight locks. Incorporate the experienced gained from the rework of Type 053 frigates exported to Royal Thai Navy, the damage control of the ship was upgraded to western (mostly German and American) standards. There are a total of four transfer stations, with dry cargo transfer station followed by liquid cargo transfer station, which is exactly the opposite of arrangement of other replenishment ships in Chinese service, which is the major reason for China to indigenously develop the third generation replenishment ship.[8] A total of 9630 tons of fuel can be carried, and with other dry cargos such as food and ammunition, the total provision Type 908 can supply is 23000 tons.[8]
HTMS Similan
In January, 1993, China received the notification from Thai government, informing the former’s intention to purchase a replenishment ship for its light aircraft carrier fleet. China decided to join the bid, among other western shipbuilders including DCNS, Fincantieri, BAZAN, Hyundai and Dutch Schelde shipyards, and the Chinese design would be very similar to the converted former-Soviet ship, with work on both ships would be performed simultaneously. The original chief designer of the cancelled 2nd generation domestic Chinese replenishment ship, academician Zhang Wende (张文德), who was named as the chief designer and the program manager of the conversion project for the Chinese navy, was also assigned an additional task, as the chief designer of second ship China would be building for export to Thai navy. China managed to beat its western competitors and won the Thai contract.
Work on the ship built for Thai navy went well and the ship was completed on August 12, 1996. Zhang Wende, the chief designer personally stayed on board the ship for twelve days during the voyage to Thailand, gathering information at the very last moment, so that it would help in the future design of the next generation Chinese replenishment ship. Whenever possible, Zhang personally operated the ship, including radars, handling boats the ship carried, and other tasks. The ship was formally accepted to the Thai naval service on September 12, 1996, and was named HTMS Similan (pennant number 187).
HTMS Similan is very similar to its sister ship in Chinese service, except it uses a Chinese hull. The most important difference, however, is in upgrading its replenishment capability. Despite being able to replenish solid supplies, the capability to resupply ammo is still rather limited for the Chinese ship. The Thai ship has further overcome this problem by increasing the ammo resupply capability. Despite the difference between two ships, most of the technologies and components, especially those core technologies for both ships remain the same, and for this reason, China has placed HTMS Similan and the Chinese ship Qinghaihu (青海湖) in the same class. This class would eventually evolve into Fuchi (Qiandaohu) class.
General characteristics
- Length: 188.9m
- Beam: 25.33 m
- Displacement: 37,000 tonnes full load
- Aircraft: 1 Z-8 helicopter
- Complement: 125
- Cargo Capacity:
- 23,000 tons fuel and general cargo
References
- ^ http://china-defense.blogspot.com/2011/07/9th-plan-task-force-to-gulf-of-aden.html
- ^ Type 908 AOR
- ^ "Nancang Underway Replenishment Ship (AOR)". Globalsecurity.org. Retrieved March 4, 2007.
- ^ "NANCANG CLASS FLEET REPLENISHMENT SHIP". SinoDefence.com. Retrieved March 4, 2007.
- ^ "World Navies Today: Chinese Fleet Support & General Logistics Auxiliaries". World Navies Today. Retrieved March 4, 2007.
- ^ deputy general designer
- ^ deputy general designer of the ship
- ^ a b Type 908 replenishment ship