Red Line (Baltimore)
Red Line | |||
---|---|---|---|
Overview | |||
Status | On hold (under investigation by the USDOT) | ||
Locale | Baltimore, Maryland | ||
Termini |
| ||
Stations | 19 (planned) | ||
Service | |||
Type | Light rail | ||
System | Maryland Transit Administration | ||
Operator(s) | Maryland Transit Administration | ||
Daily ridership | 54,000 (2030 projection) | ||
History | |||
Planned opening | after 2022 | ||
Technical | |||
Line length | 14.1 mi (22.7 km) | ||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge | ||
Electrification | 750 V DC overhead | ||
Operating speed | Average 18 mph | ||
|
The Red Line was a planned east-west mass transit light rail line for Baltimore, Maryland. Although it had been granted federal approval to enter the preliminary engineering phase, Maryland Governor Larry Hogan declared on June 25, 2015 that he would not provide state funds for the project.[1] The line's construction had been estimated to begin in late 2015–early 2016, subject to funding, with a completion date set for late 2021–early 2022.
As of January 2017, the Red Line is currently under investigation by the U.S. Department of Transportation for its cancellation being in possible violation of Title VI of the Civil Rights Act of 1964.[2]
Background
In 2001, then-Secretary of Transportation John Porcari appointed a 23-member independent commission, the Baltimore Region Rail System Plan Advisory Committee, to make suggestions for new rail lines and expansions of existing lines. The proposals used a unified branding scheme for the existing lines and the proposed new lines, identifying each line by a color, as the Washington Metro and many other transit agencies do.[3]
The suggested system was composed of six color-coded lines with an overall length of 109 miles (175 km) and 122 stations, including Baltimore's existing Metro Subway and Light Rail lines. In the commission's report, the Red Line was an east-west line that would begin at the Social Security Administration offices in Woodlawn in Baltimore County, travel through West Baltimore with an intermodal stop at the West Baltimore MARC station, pass through downtown where it would intersect the existing Metro Subway and Light Rail lines, and pass through East Baltimore with stops in the gentrified neighborhoods of Fells Point, Canton, and the area around Patterson Park. The Red Line was designated by the commission as the starting component for new work on the 6-line system.[4]
Out of the commission's various proposals, the Red Line was taken up with the most enthusiasm by area officials. Progress was slowed by a debate between state Secretary of Transportation Robert Flanagan on one side, and the Baltimore City government and Congressional delegation on the other over the mode: Flanagan favored a bus rapid transit (BRT) solution with separate right-of-way components like Boston's Silver Line, while the other officials favored a light rail rapid transit line or heavy rail and insisted that both modes of rail transit be included in studies.[5]
Heavy rail was dismissed by Flanagan as an alternative, due to an estimated cost of $2.2 billion to $2.6 billion. With ridership of only 45,000 on Baltimore's existing Metro system at the time of his appointment, he did not expect the Red Line to reach the 140,000 to 150,000 ridership level necessary to attract federal funding for a new heavy rail line.[5]
Red Line alternatives
No. | Alternative | Length (miles) |
Cost (millions) (2007 prices) |
Travel time end to end (minutes) |
Average Weekday Ridership |
---|---|---|---|---|---|
1 | No Build | 13.9 | n/a | 80 | n/a |
2 | TSM | 14.3 | $281 | 76 | 17,600 |
3A | BRT, surface only | 13.8 | $545 | 62 | 31,400 |
3B | BRT, downtown tunnel | 14.9 | $1,019 | 56 | 37,400 |
3C | BRT, downtown tunnel, Cooks Lane tunnel |
14.7 | $1,151 | 53 | 37,400 |
3D | BRT, maximum tunnel | 13.7 | $2,404 | 43 | 41,500 |
3E | BRT, surface only, Johnnycake Rd. alignment |
14.8 | $571 | 69 | 29,300 |
3F | BRT, TSM surface, downtown tunnel |
14.8 | $755 | 65 | 34,300 |
4A | LRT, surface only | 13.9 | $930 | 55 | 34,600 |
4B | LRT, downtown tunnel | 14.6 | $1,498 | 43 | 41,100 |
4C | LRT, downtown tunnel, Cooks Lane tunnel |
14.6 | $1,631 | 41 | 42,100 |
4D | LRT, maximum tunnel | 13.7 | $2,463 | 36 | 42,300 |
- TSM: Transportation System Management[6]
- BRT: Bus Rapid Transit
- LRT: Light Rail Transit
Modified alternative 4C selected by governor
In August 2009, Governor O'Malley selected a modified version of the Light Rail Alternative 4C, which became known as the "Locally Preferred Alternative (LPA)." The modification eliminated two stations and a small parking lot from the original Alternative 4C plans, but included an expansion of parking at the West Baltimore MARC station.
Two features of the original Alternative 4C plan, considered important by the Citizens Advisory Council, remained part of the Locally Preferred Alternative:
- Much of the proposed route through West Baltimore ran generally along U.S. Route 40, including the depressed freeway section left over from the cancellation of Interstates 70 and 170 within the city limits. This freeway section was built to accommodate a transit line in the median, and the Red Line would most likely have used this route to achieve grade separation though the area. The western end of former I-170 was demolished in 2010 to allow for additional parking and median access for the Red Line. A similar modification was also planned for the eastern end of I-70 where the MD 122 interchange would be converted to an at-grade intersection, and a new Park & Ride lot would have been built to replace the one that sits east of said interchange.
- The LPA provided for the line to go underground along Martin Luther King, Jr. Boulevard and to surface on Boston Street near the Can Company in Canton, bypassing downtown Baltimore's narrow streets and crowded traffic conditions. Another tunnel bypasses Cooks Lane, but the original LPA version reduced the tunnel to a single track alignment. Adjustments to the LPA were later made to allow a second track in the Cooks Lane tunnel.
With the Federal Transit Administration's approval in June 2011 to start preliminary engineering, the project made its first step beyond the concept stage; however, the FTA estimated daily ridership for the completed system at 57,000 and expected it to cost a total of $2.2 billion with inflation included. Henry Kay, MTA's deputy administrator, estimated the cost of preliminary engineering at $65 million. The state would have had to pay preliminary engineering costs, but Kay said that these and other upfront costs would be eligible for federal reimbursement.[7]
Cancelled funding
Governor Larry Hogan, who was elected in 2014, announced on June 25, 2015 that he had cancelled funding for the Red Line. During his 2014 campaign, Hogan had complained about the cost of the proposed Red Line for Baltimore and a proposed Purple Line for the Maryland suburbs of Washington, DC; however, he said that the Purple Line would continue at a reduced level of funding.[1]
Federal investigation
On December 21, 2015, the National Association for the Advancement of Colored People (NAACP), together with the American Civil Liberties Union of Maryland and Baltimore Regional Initiative Developing Genuine Equality (BRIDGE) filed a complaint pursuant to Title VI of the Civil Rights Act of 1964 with the U.S. Department of Transportation Departmental Office of Civil Rights.[8] The complaint challenged Governor Hogan's decision to cancel the Red Line on the basis of discrimination against Baltimore's predominately African American population that would have benefited from the infrastructure project.[9] Furthermore, the complaint highlighted that Governor Hogan's decision shifted funding away from car-dependent citizens, and instead was dedicated towards highway projects in rural areas of the state that are primarily Caucasian.[10]
On January 19, 2017, the last day of the Obama Administration, the Department of Transportation announced it expand its investigation into Governor Hogan's decision to cancel the Red Line, as well as the rest of MDOT's programs to determine whether federal law was violated.[11][12] In addition, the DOT stated that the state transportation agency did not take the federal law into account or the adverse impact it would have on African-Americans, nor did the Governor seek any input from MDOT in making the decision.[13][14]
Proposed route and stations
The alignment for the Red Line would have followed an east-west path. Starting from the west, the proposed stations were as follows:
Station Name | Parking | Connection | Station Location | Points of Interest |
---|---|---|---|---|
Centers for Medicare and Medicaid Services | no | 79, 20, CityLink Blue, 31 | Security Blvd / CMS Entrance | Centers for Medicare and Medicaid Services, Department of Health and Human Services, General Services Administration |
Security Square Mall | 79, CityLink Blue, 31, 77?, 99? | Security Blvd / Belmont Av | Security Square Mall, Security Station Shopping Center | |
Social Security Administration | (A) | 79, 31, 77? | Woodlawn Dr / Parallel Dr | Social Security Administration, Southwest Academy, Woodlawn |
I-70 Park and Ride | 79, CityLink Blue | Parallel Dr / Ingleside Av | East Social Security Administration, Gwynns Falls Trail | |
Tunnel portal at city/county line under Cooks Lane and resurface along Edmondson Avenue | ||||
Edmondson Village | 78, 23?, 38, CityLink Blue, 150 | Edmondson Av / Swann Av | Edmondson Village Shopping Center, Enoch Pratt Free Library Edmondson Branch, Uplands, Westside Skills Center | |
Allendale | no | 23?, 38, CityLink Blue | Edmondson Av / Allendale St | Gwynns Falls Leakin Park, Lyndhurst Park |
Rosemont | no | 78, 29, 23?, 38, CityLink Blue, qb47? | W. Franklin St/Poplar Grove St | Franklintown Road Business Area, Rosemont Park, Western Cemetery |
West Baltimore MARC | 77, CityLink Blue/Orange/Green/Pink, qb47?, 150 MARC Penn Line, |
W. Mulberry St / N. Smallwood St | Bentalou Recreation Center, Bon Secours Hospital | |
Harlem Park | no | 1? | U.S. Route 40 / Carey St | Edgar Allan Poe House & Museum, Franklin Square, Harlem Square Park, Lafayette Square |
Poppleton | (R) | 15? | N. Fremont Av / W. Baltimore St. | Baltimore Center Medical Examiner Office, Perkins Square, Lexington Terrace, Little Lithuania Park, Lithuanian Hall, University of Maryland BioPark |
Tunnel portal along Martin Luther King Jr. Boulevard | ||||
Howard Street/University Center | (P) | CityLink Navy, 5?, 7?, CityLink Red, 10?, CityLink Blue/Orange/Pink, 27?, 31?, 35?, 91?, 120, 160, 310?, 320?, 410?, 411?, 420? |
W. Lombard St / S. Howard St | Bromo Arts District, Camden Yards, Royal Farms Arena, University of Maryland, Westside |
Inner Harbor | (P) | 5?, 65, CityLink Red, 10, 11, 19, 20, 23, 26, 27, 35, 36, qb40, qb46, qb48, 91 Metro Subway CCC: Orange, Purple |
W. Lombard St / S. Charles St | Downtown Baltimore, Financial District, Harborplace, Market Place, McKeldin Square, National Aquarium, Power Plant Live!, Pratt Street Power Plant, World Trade Center |
Harbor East | (P) | 31 CCC: Orange, Green |
Fleet St / S. Central Av | Harbor East Shopping District, Harbor Point, Institute of Marine and Environmental Technology, Little Italy Pier Six Pavilion, Reginald F. Lewis Museum of Maryland African American History & Culture |
Fells Point | no | 10, 13 | Fleet St / S. Broadway | Broadway Market, Fells Point, Maritime Park, Thames Street Park, Upper Fell's Point |
Tunnel portal along Boston Street | ||||
Canton | 13, 31 | Boston St / O'Donnell St | The Can Company, O'Donnell Square, Patterson Park, Saint Casmir's Park | |
Canton Crossing | 7, 13, 31 | Boston St / Conkling St | Brewers Hill, Canton Crossing Shopping Center, Clarence H. "Du" Burns Arena, Canton Waterfront Park, Charm City Skate Park | |
Highlandtown/Greektown | no | 10, 22 | Eastern Av / Janney St | Enoch Pratt Free Library Southeast Anchor Branch, Greektown, Highlandtown, Kresson, Markets at Highlandtown |
Viaduct between Highlandtown station and Bayview MARC station | ||||
Bayview | (F) | 22, 23, qb40 | Alpha Commons Dr / Bayview Blvd | Johns Hopkins Bayview Medical Center, Johns Hopkins Asthma & Allergy Center, National Institute on Aging |
East Baltimore/Bayview MARC | 22, 23, qb40 |
E. Lombard St (east of Bioscience Dr) | East Baltimore/Bayview station, Pulaski Industrial Area, Joseph E. Lee Park, Patterson High School | |
Future extension to Dundalk[4] | ||||
Eastern Avenue | no | 10, 23, qb40 | Eastern Av / Dundalk Av | Johns Hopkins Bayview Medical Center |
O'Donnell Street | no | 10, 26, 31 | Dundalk Av / O'Donnell St | Amazon Warehouse, Mt. Carmel Cemetery |
Dundalk Center Place | (R) | 4, 10, 31 | Dundalk Av / Center Pl | CCBC Dundalk, Downtown Dundalk, St. Helena Park |
- NOTES
- A authorized employee parking only
- F facility parking ony
- P paid parking
- R residential parking only
- qb40 (Quick Bus) would have either been replaced or eliminated when the Red Line began service.
Red Line system features
Feature | Proposed alignment |
---|---|
Overall length | 14.5 mi (23.3 km) |
Surface length | 9.8 mi (15.8 km) |
Tunnel length | 3.9 mi (6.3 km) |
Aerial length | 0.8 mi (1.3 km) |
Stations | 20 total (15 surface, 5 underground) |
Parking | 6 stations with parking areas |
Travel time | 44 minutes (Woodlawn to Bayview) |
Vehicles | 34 light rail vehicles |
Service frequency | 8 minutes peak, 10 minutes off peak |
Citizens' Advisory Council
Establishment of Council
The "Citizens' Advisory Council for the Baltimore Corridor Transit Study - Red Line" was established by the Maryland General Assembly in 2006.[15][16]
Governor Robert Erlich vetoed the bills which originally created the Citizens' Advisory Council on May 26, 2006, and replaced it with the "Red Line Community Advisory Council." This 15-member Council was appointed entirely by the Governor.[17][18]
At a special session in June 2006, the Legislature overrode the Governor's veto.[15][16] The Council established by the Legislature also had 15 members, but only two could be appointed by the Governor. Five of the other Council members were appointed by the Senate President, five by the Speaker of the House, two by the Baltimore City Mayor and one by the Baltimore County Executive. Two co-chairs for the Council could be chosen by the Governor or the Maryland Transit Administrator from up to four nominees selected by the Senate President and Speaker of the House.
On July 30, 2007, an executive order by Governor Martin O'Malley restored the name originally selected by the Legislature.
First annual report to General Assembly
On September 9, 2008, the Red Line Citizens' Advisory Council voted unanimously to adopt its first report to the General Assembly, which included the statement that "Preparation of a SDEIS [Supplemental Draft Environmental Impact Statement] should begin now, as a collaborative effort between the MTA and the public in finding the best ways to invest over a billion dollars in Baltimore's transportation infrastructure in keeping with the vision of the 2002 Plan."
Council dispute over Alternative 4C
A recommendation for Alternative 4C (light rail with a downtown tunnel and a Cooks Lane tunnel) was approved by a vote of five to two at the Citizens' Advisory Council meeting on December 11, 2008. Two of the nine members present abstained.
Red Line Community Compact
This document, signed by city and state officials, and 72 leaders of community organizations on September 12, 2008, described how they intended to build and operate the Red Line for the benefit of Baltimore and its communities. The Community Compact emphasized four main points:
- Put Baltimore to work on the Red Line: encourage and promote local and minority contract participation.
- Make the Red Line green: include green space and environmental improvements into the project.
- Community-centered station design, development and stewardship
- Reduce impact of construction on communities
Mayor Sheila Dixon appointed leaders from city government, non-profit and citizen groups, and the business community to a 40-member steering committee to implement each part of the Community Compact. The Red Line Community Compact Steering Committee held their first meeting on February 19, 2009; the group was scheduled to meet quarterly throughout the life of the project.
The decision at the meeting on December 11, 2008 was disputed at another Advisory Council meeting on July 9, 2009, where 11 members were present. A six to five vote favored rescinding the previous decision for Alternative 4C. Council Chair Angela Bethea-Spearman ruled that the motion to rescind failed, because the vote was less than a 2/3 majority. She cited "Robert's Rules" as the criteria for requiring a 2/3 majority and denying the rescision.
Community opposition to Alternative 4C
Beginning in late 2008, Baltimore City favored the "4C Alternative" selected by Governor O'Malley in 2009, which was endorsed by Mayor Sheila Dixon; however, the 2008 Citizens Advisory Council annual report commented on the opposition of community groups to surface rail alignments through residential neighborhoods.
A letter from the Allendale Community Association, read at a meeting of the Citizens Advisory Council on December 11, 2008, expressed the Association's opposition to Alternative 4C and any surface rail construction along Edmondson Avenue.
The West-East Coalition (WEC) Against Red Line Alternative 4C, established in June 2009, represented community associations, homeowners groups, businesses, and religious groups opposed to the Alternative 4C. Its now-defunct website explained that the organization considered the proposed light rail alignment to be a detriment to communities on both the East and West sides of Baltimore.
In a letter to Governor Martin O'Malley, Senator Barbara Mikulski, Senator Benjamin Cardin, Congressman Elijah Cummings, Congressman John P. Sarbanes, and Mayor Sheila Dixon on July 13, 2009, the WEC described concerns about the effects of double-tracked surface rail, traffic congestion, and safety concerns.
In 2009, the WEC circulated a petition against the surface Red Line in the Canton neighborhood. It delivered 1,350 signed cards to Governor O'Malley on July 31, 2009.
Support for Red Line and Political Action Committee
In the summer of 2011 the Red Line Now Political Action Committee (PAC) was established to voice the support of residents of Baltimore City for the funding and construction of Alternative 4C. Its website stated that the organization was staffed on a volunteer basis and planned to support local politicians that supported the construction of the Red Line.[19] Red Line Now PAC was governed by a nine-member board of directors who were citizen volunteers who lived and/or worked along what would have been the Red Line corridor. The board members represented the Midtown, Edmondson, Canton, Fells Point, Patterson Park, and Greektown communities.
See also
- Green Line - a proposed rail line in Baltimore from Johns Hopkins Hospital to Morgan State University.
- Yellow Line - a proposed rail line from Hunt Valley to Columbia Town Center.
- Charles Street Trolley - a proposed trolley line in northern Baltimore, backed by a non-MTA group.
References
- ^ a b Michael Dresser (2015-06-25). "Hogan says no to Red Line, yes to Purple". The Baltimore Sun. Retrieved 2015-06-25.
- ^ http://s3.documentcloud.org/documents/3404919/Red-Line-Compliance-Review-Letter.pdf
- ^ Maryland Transit Administration. "Baltimore Region Rail System Plan Final Report" (PDF). Retrieved 2014-09-22.
- ^ a b Baltimore Red Line Mayor's Red Line information site. Retrieved 2010-1-8
- ^ a b Dori Berman (January 13, 2006). "New subway back in play?" (PDF). Daily Record. Retrieved 2010-02-02.
- ^ "Transportation Systems Management (TSM)" uses the existing bus system, with modifications to signalling, lane assignments, and controls.
- ^ Michael Dresser (June 28, 2011). "Red Line gets a qualified go-ahead". The Baltimore Sun. p. 1.
- ^ http://www.naacpldf.org/files/case_issue/Baltimore%20-Red-Line-Complaint.pdf
- ^ http://usa.streetsblog.org/2015/12/21/civil-rights-groups-challenge-maryland-gov-hogans-red-line-cancellation/
- ^ http://www.naacpldf.org/files/case_issue/Baltimore%20-Red-Line-Complaint.pdf
- ^ http://s3.documentcloud.org/documents/3404919/Red-Line-Compliance-Review-Letter.pdf
- ^ https://www.washingtonpost.com/local/dot-expands-investigation-into-canceled-rail-line-in-md/2017/01/23/111ff4cc-e1bc-11e6-a419-eefe8eff0835_story.html
- ^ https://www.washingtonpost.com/local/dot-expands-investigation-into-canceled-rail-line-in-md/2017/01/23/111ff4cc-e1bc-11e6-a419-eefe8eff0835_story.html
- ^ http://www.baltimoresun.com/news/maryland/bs-md-federal-transportation-civil-rights-review-20170123-story.html
- ^ a b Senate Bill 873 (2006) Maryland Department of Legislative Services, Library & Information Service. Retrieved 2010-01-29.
- ^ a b House Bill 1309 (2006) Maryland Department of Legislative Services, Library & Information Service. Retrieved 2010-01-29.
- ^ Governor's veto letter, May 26, 2006 retrieved 2010-1-29
- ^ Executive Orders 2006 Department of Legislative Services archives. See p. 13 for Executive Order 01.01.2006.04. Retrieved 2010-01-29.
- ^ Red Line Now PAC Political Action Committee that supports Red Line development. Retrieved 2011-09-26.