Jump to content

MGWR Class 1

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Djm-leighpark (talk | contribs) at 14:57, 30 October 2017 (Extended to Class 4.). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.


MGWR 1,2,3,4,5,13 classes
Type and origin
Power typeSteam
BuilderGrendon
Fairbairn
Hawthorn
Build date1846-1862
Specifications
Configuration:
 • Whyte2-2-2
Gauge5 ft 3 in (1,600 mm)
Career
OperatorsMidland Great Western Railway (MGWR)
LocaleIreland

Midland Great Western Railway (MGWR) Classes 1,2,3,4,5 and 13 were 2-2-2 locomotives acquired over the period 1847-1862.[1]

Class 1

The MGWR Class 1 were supplied by Thomas Grendon and Company from April 1847 with Dunsandle performing the trials and opening run. These engines were a replacement for a cancelled order from J & R Mallet of Seville Ironworks Dublin and arrived before the earlier order for Class 2 from Fairbairn. Juno was converted into a 2-2-2T tank locomotive.[1]

MGWR No. Name Introduced Withdrawn
7 Dunsandle 1847 1871
8 Vesta 1847 1870
9 Venus 1847 1869
10 Luna 1847 1869
11 Juno 1847 1867
30 Pallas 1847 1875
3 Falcon 1847 1875

Class 2

Fairbairn supplied 6 engines in response to a quote in 1846, the engines being delivered from June 1847. They seem to have accumulated less average mileages than Class 1 and were withrawn within 10 years apart from Orion which was converted to a tank engine in 1852.[1]

MGWR No. Name Introduced Withdrawn
1 Orion 1847 1860
2 Mars 1847 1856
3 Saturn 1847 1856
4 Mercury 1847 1856
5 Jupiter 1847 1856
6 Sirius 1847 1856

Class 3

The Class 3 Fairbairn engines supplied 6 more engines to a different design in 1848, they had a longer service life than the Fairbairn Class 2.[1]

MGWR No. Name Introduced Withdrawn
12 Heron 1848 1873
13 Condor 1848 1873
14 Petrel 1848 1875
15 Pelican 1848 1873
16 Cygnet 1848 1873
17 Ouzel→Snipe 1848 1875

Class 4

The Class 4 Fairbairn were 2-2-2 Well Tank locomotives ordered for the MGWR's Galway extension in 1851. One of the original order of 4 was believed to have been sent to Brazil. They had a long service life of nearly 50 years.[1]

MGWR No. Name Introduced Withdrawn
27 Fairy→Bee 1851 1897
28 Titania→Elf 1851 1897
29 Ariel→Fairy 1851 1897


References

  1. ^ a b c d e Shepherd, Ernie (1994). The Midland Great Western Railway of Ireland – An illustrated History. Midland Publishing Limited. pp. 82–84, 123. ISBN 1-85780-008-7.

[[Category:2-2-2 locomotives]] [[Category:5 ft 3 in gauge locomotives]] [[Category:Steam locomotives of Ireland]] [[Category:Railway locomotives introduced in 1846]] [[Category:Midland Great Western Railway]]