Jump to content

Risk management plan

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 129.10.245.66 (talk) at 03:15, 19 November 2006. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The Risk Management Plan (RMP) is the document prepared by a Project manager to foresee risks, to estimate the effectiveness, and to create response plans to mitigate them. It also consists of the risk assessment matrix.