Jump to content

Risk management plan

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Alaibot (talk | contribs) at 06:59, 25 November 2006 (Robot: Automated text replacement (-{{[Uu]ncat(|egori[sz]ed)\|November 2006}} +{{uncategorizedstub|November 2006}})). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The Risk Management Plan (RMP) is the document prepared by a Project manager to foresee risks, to estimate the effectiveness, and to create response plans to mitigate them. It also consists of the risk assessment matrix.