Jump to content

Line 1 (Almaty Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Monkbot (talk | contribs) at 16:47, 29 September 2019 (top: Task 16: replaced (1×) / removed (0×) deprecated |dead-url= and |deadurl= with |url-status=;). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

First Line
Overview
LocaleAlmaty
Termini
Stations7
Service
TypeRapid transit
SystemAlmaty Metro
Operator(s)Communal State Enterprise "Metropolyten"
History
Opened1.12.2011
Technical
Line length8.56 kilometres (5.32 mi)
Track gauge1,520 mm (4 ft 11+2732 in)
Route map

Apple orchard
Planned ↑
MPD-1 «Raiymbek batyr»
Raiymbek batyr
Zhibek Joly  -  Dostyk
Almaly
Abay
Baikonur
Auezov Theater
Alatau  -  Alatau 2
Sayran
Moskva
Saryarqa
Bauyrjan Momyshuly
Opening ca. 2027 ↓
Qalqaman

The First Line (Template:Lang-kk, Birinshi baǵyt; Template:Lang-ru) is the first line opened of the Almaty Metro in Almaty, Kazakhstan. The first stretch with seven stations, between Raiymbek batyr and Alatau, and with a train yard at the Raiymbek batyr, was opened on 1 December 2011.[1] The extension with two stations, between Alatau and Moskva, was opened on 18 April 2015.[1]

References

  1. ^ a b Schwandl, Robert. "UrbanRail.Net > Asia > Kazakhstan > Almaty Metro". Archived from the original on 25 April 2015. Retrieved 4 May 2015.