Jump to content

Chatham Dockyard

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ByronCollins (talk | contribs) at 14:03, 19 January 2020 (Last years). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

HM Dockyard, Chatham
Chatham, Kent
Chatham Dockyard in 1790 (by Nicholas Pocock)
Chatham Dockyard is located in Kent
Chatham Dockyard
Chatham Dockyard (Kent)
Coordinates51°23′50″N 00°31′40″E / 51.39722°N 0.52778°E / 51.39722; 0.52778
Site information
OperatorRoyal Navy
Controlled byThe Navy Board (until 1832); the Admiralty (1832-1964).
Open to
the public
as Chatham Historic Dockyard
Other site
facilities
Military barracks and fortifications
WebsiteChatham Historic Dockyard
Site history
In use1567-1984
FatePreserved as a maritime heritage visitor attraction
EventsRaid on the Medway, 1667

Chatham Dockyard was a Royal Navy Dockyard located on the River Medway in Kent. Established in Chatham in the mid-16th century, the dockyard subsequently expanded into neighbouring Gillingham (at its most extensive, in the early 20th century, two-thirds of the dockyard lay in Gillingham, one-third in Chatham).

It came into existence at the time when, following the Reformation, relations with the Catholic countries of Europe had worsened, leading to a requirement for additional defences. For 414 years Chatham Royal Dockyard provided over 500 ships for the Royal Navy, and was at the forefront of shipbuilding, industrial and architectural technology. At its height, it employed over 10,000 skilled artisans and covered 400 acres (1.6 km²). Chatham dockyard closed in 1984, and 84 acres (340,000 m2) of the Georgian dockyard is now managed as the Chatham Historic Dockyard visitor attraction by the Chatham Historic Dockyard Trust.

Outline history

Engraving of "Chatham Dockyard from Fort Pitt" from Ireland's History of Kent, Vol. 4, 1831. Facing p. 349. Drawn by G. Sheppard, engraved by R. Roffe.

The Treasurer of the Navy's accounts of the King's Exchequer for the year 1544 identifies Deptford Dockyard as the dockyard that carried out all the major repairs to the King's Ships that year. That was soon to change (although Deptford remained a dockyard for over three centuries).[1]

Jillyngham water

Chatham's establishment as a naval dockyard was precipitated by the use of the Medway as a safe anchorage by the ships of what was to become (under King Henry VIII) England's permanent Royal Navy. In 1550, a decree was issued to the Lord High Admiral that:

all the Kinges shippes should be harborowed [harboured] in Jillyngham Water – saving [except] only those that be at Portsmouth[2]

Even prior to this, there is evidence of certain shore facilities being established in the vicinity for the benefit of the King's ships at anchor: there are isolated references from as early as 1509 to the hiring of a storehouse nearby[3] and from 1547 this becomes a fixed item in the Treasurer's annual accounts. (At around the same time a victualling store was also established, in nearby Rochester, to provide the ships and their crews with food.) The storehouse would have furnished ships with such necessary consumables as rope, pulleys, sailcloth and timber. Careening took place on the river, according to a Privy Council instruction of 1550;[4] for more specialised repairs and maintenance, however, ships would have had to travel to one of the purpose-built royal dockyards (the nearest being those on the Thames: Deptford and Woolwich).[5]

The early dockyard

1567 is generally seen as the date of Chatham's establishment as a Royal Naval Dockyard.[6] In the years that followed the ground was prepared, accommodation was secured and in 1570 a mast pond was installed. The following year a forge was built for anchor-making.[7] At around the same time a large house was leased (the Hill House) for administrative purposes (including meetings of the Council of Marine Causes); among other things it contained the Pay Office, and remained in Naval use for the next 150 years.[8]

The renowned Tudor shipwright Mathew Baker was appointed to Chatham in 1572 (though he was primarily based at Deptford). Under his supervision the site was developed to include sawpits, workshops, storehouses and a wharf with a treadmill crane (completed in 1580). Most significantly, Chatham's first dry dock was opened in 1581 (for repairing naval galleys).[9] The first ship to be built at the dockyard, a pinnace named HMS Sunne, was launched in 1586.[10]

The dockyard received its first royal visit, from Elizabeth I, in 1573; later, in 1606, James I used Chatham dockyard for a meeting with Christian IV of Denmark.[11]

Relocation

17th-century painting of naval vessels moored on the River Medway, viewed from Chatham with Rochester Bridge in the background.

In the early 17th century the government resolved to invest in a new specialised facility for refitting and repairing warships. By 1611 Chatham had been chosen as its location (in preference to Deptford, which at the time was the nation's principal naval shipbuilding yard; this led to speculation that Deptford was going to be sold off). The decision established Chatham as the country's premier naval industrial complex; nevertheless, concerns were already being raised over its river being prone to silting.[12]

The decision required the dockyard to move from its original location, which was too constricted, to a new (adjacent) site to the north.[10] (The old site was in due course transferred to the Ordnance Board, who established the gun wharf there.) By 1619, the new dockyard consisted of a new dry dock and wharf with storehouses, all enclosed within a brick perimeter wall.[13] The growing importance of the dockyard was illustrated with the addition soon afterwards of a mast pond, and the granting of additional land on which a second (double) dry dock was constructed, along with a sail loft, a ropery and residences for the dockyard officers: all of which were completed by 1624. Plans for a wet dock, however, were shelved when it became clear that Deptford (which already had such a facility) would remain open.[14]

Peter Pett, of the family of shipwrights whose history is closely connected to the Chatham dockyard, became commissioner in 1649.[15] In 1686 two new dry docks were built, in addition to the old single and double dry docks; all four were rebuilt and expanded at various points in subsequent centuries (the double dock having been converted into a single dock in 1703).[16] Although the yard focused mainly on refitting and repairs, some shipbuilding continued to take place. It made do with a single shipbuilding slip for much of the 17th century (a second slip, dating from the same period, had fallen out of use; it was replaced in the 1730s). Also in 1686 a 'Great Long Store-house' was built, alongside the ropery on what is now Anchor Wharf;[8] and two new mast ponds were constructed, in what was then the northernmost part of the yard, in 1697 and 1702.[17]

Sheerness

Dutch Attack on the Medway, June 1667 by Pieter Cornelisz van Soest, painted c. 1667. The captured ship Royal Charles is right of centre.

One of the disadvantages of Chatham (and also of the Thames-side yards) was their relative inaccessibility for ships at sea (including those anchored in The Nore). Therefore, rather than risk being constrained by wind, tide and draught on a journey upriver, ships would seek as often as possible to do running repairs and maintenance while at anchor, and would only travel to the dockyard when necessary. Thus deliveries of victuals, ordnance and other supplies were made by small boats, sailing regularly between Chatham and The Nore.[18]

Seeking to alleviate this less-than-satisfactory situation, the Navy Board explored options for developing a shore facility with direct access from the open water of the Thames Estuary. The escalating Anglo-Dutch wars forced their hand, however: several temporary buildings were hastily erected in Sheerness, at the mouth of the Medway, to enable ships to re-arm, re-victual and (if necessary) be repaired as quickly as possible. In 1665, the Navy Board approved Sheerness as a site for a new dockyard, and building work began; but in 1667 the still-incomplete Sheerness Dockyard was captured by the Dutch Navy and used as the base for a humiliating attack on the English fleet at anchor in the Medway itself. Sheerness remained operational as a royal dockyard until 1959, but it was never considered a major shore establishment and in several respects it operated as a subsidiary yard to Chatham.[19]

Consolidation

By the late 17th century Chatham was the largest refitting dockyard, of key importance during the Dutch wars. Its four dry docks outnumbered Deptford's two (each of the other yards made do with only one),[20] and in the decades that followed a number of prestigious new buildings were erected (including the officers' residences, the clocktower storehouse and the main gatehouse), several of which are still in place. At the same time, the nearby village of Brompton began to be developed to provide housing for the dockyard's growing workforce.[8]

Dockyard Plan of 1774, reproduced on an information panel adjacent to the former South Mast Pond (shown highlighted in red).

From the very start of the 18th century, however, Chatham began to be superseded in both size and importance, first by Portsmouth, then Plymouth, when the main naval enemy became France, and the Western approaches the chief theatre of operations. In addition, the Medway had begun to silt up, making navigation more difficult (especially as the Navy's ships were getting larger). As a result, it was acknowledged by 1771 that Chatham had no future as a front-line fleet base;[19] nevertheless, following a visit by the Admiralty Board in 1773, the decision was taken to invest further in Chatham, and to develop it as a building yard rather than a refitting base.[15]

By this time the establishment, including the gun wharf, stretched one mile (1.6 km) in length, and included an area of in excess of 95 acres (380,000 m2). Alongside the four dry docks it now had a total of six shipbuilding slips (equalling Deptford and outnumbering the other yards in this regard), albeit three of the six were under 150 ft (46 m) in length and suitable only for building smaller warships.[19] The docks varied from 160 ft (49 m) to 186 ft (57 m) in length. The officers and men employed in the yard had also increased, and by 1798 they numbered 1,664, including 49 officers and clerks and 624 shipwrights. Additionally required were the blockmakers, caulkers, pitch-heaters, blacksmiths, joiners and carpenters, sail makers, riggers, and ropemakers (274), as well as bricklayers, labourers and others.[21] Building works at Chatham did not compare with the substantial expansions underway at Portsmouth and Plymouth at this time; but the southern part of the yard was significantly redeveloped, with construction of two new storehouses on Anchor Wharf and a major reconfiguration of the ropery.[19]

Among the vessels built in this Dockyard which still exist are HMS Victory (launched in 1765 and now preserved at Portsmouth Historic Dockyard)[22] and HMS Unicorn (a Template:Sclass-), launched in 1824 and now preserved afloat at Dundee).[23]

Mechanisation

1884 map, showing the 'Royal Dock Yard' (centre) with the river to the west, new extension to the north, barracks and fortifications to the east.

Following the appointment of Robert Seppings as Master Shipwright in 1804, iron began to be introduced into the structure of ships being built at Chatham; the following year work began on a new, much larger smithery, commissioned by Samuel Bentham, designed by Edward Holl and fitted out by John Rennie.[24] Among other things, the use of iron in ship construction enabled larger vessels to be built, and between 1836 and 1851 Chatham gained five new covered slipways, much larger in scale than the ones they replaced. (The covering of Chatham's slipways and dry docks, to protect the woodwork of ships as they were built or repaired, had begun with No 2 Slip and No 1 Dock in 1817).[25]

In 1811, Marc Brunel recommended the installation of steam-powered saw mills in the royal dockyards, to replace the manual labour of the saw pits. Money was only made available for one such installation, however, and Chatham (as the principal building yard at this time) was chosen as its location. Land was purchased to the north-east for its construction, and the new saw mill began operation in 1814.[19] The following year, John Rennie was engaged to build an entirely new dry dock (following his own recommendations) which was the first in the dockyard to be built entirely of stone; it was built on the site of the old smithery. Unlike the earlier timber docks, which were drained using gravity, this new dock (No 3 Dock) was pumped dry using a Boulton & Watt steam engine. After completion of the new dock in 1821, reconstruction of the other docks in stone followed (with the exception of the northernmost, which was converted into a slipway);[26] they were likewise emptied using steam power, provided by the same engine and pumps (which were also linked to a network of pipes installed across the whole dockyard site for firefighting purposes).[19] Another novel application of steam power was embarked on in 1817, with the building of a 'Lead and Paint Mill', in which a single beam engine powered a rolling mill and a series of devices for grinding pigment and mixing paint; the plant was operational from 1819. It was not until 1837, however, that steam power was first introduced into the ropery, and the smithery received its first engine (for blowing the forges and powering tilt hammers) in 1841.[19]

Armour plating being fitted to HMS Royal Oak at Chatham, c. 1862.

At the same time, moves were being made towards the application of steam power to ship propulsion. The first steam-powered ship to be laid down at Chatham was HMS Phoenix, one of four paddle steamers built concurrently across the royal dockyards in the early 1830s, each designed by a different leading shipwright. HMS Bee, launched at Chatham in 1842, was an experimental vessel fitted with both paddles and a propeller, each of which could be driven independently from the same engine for comparison. Following the success of such early trials with screw propulsion, several older sailing ships were taken into dry dock and retro-fitted with propellers, beginning with HMS Horatio.[27] Another hint of changes to come was seen in the launch of HMS Aetna, the first armour-plated vessel to be built at Chatham, in 1856. All these developments were to come together with the construction of HMS Achilles, in a newly-expanded No 2 Dock, between 1860 and 1864: the first true iron-hulled battleship to be launched in a royal dockyard.[28]

To meet the new demands of building in iron, metal mills were built alongside the smithery in 1845, containing rolling machinery and furnaces for reprocessing iron.[19] Holl's smithery was itself enlarged with the addition of a foundry in the 1850s, and its courtyard was roofed over for a steam hammer shop in 1865.[24] By 1861, No 1 Dock had been filled in and a machine shop constructed in its place for heating, bending and planing armour plate for HMS Achilles which was being built alongside.[29] For the time being, however, marine steam engines were not manufactured on site but were ordered from Thames-based private contractors (along with other associated equipment).[30]

Expansion

HMS Empress of India in No 8 Dock, with No 1 Boiler Shop in the background, c. 1897.

A significant disadvantage for Chatham was that fitting out had always taken place on the river. When Achilles, for example, had been completed and floated out of dry dock, she spent almost a year moored in Gillingham Reach, where not only her engines, boilers, funnels and a 2.5-ton propeller, but also masts, sails, rigging, guns, coal, food, ammunition and furnishings were either loaded or installed.[31] It was partly to address this problem that the Admiralty undertook a huge building programme at Chatham, between 1862 and 1865, which quadrupled the size of the yard and provided specialist facilities for steam-powered ships with metal hulls. Three basins were constructed along St Mary's creek, from west to east: No 1 Basin (of 28 acres (110,000 m2)), No 2 Basin (20 acres (81,000 m2)) and No 3 Basin (21 acres (85,000 m2)). Along the southern edge of No 1 Basin four new dry docks were built (Nos 5-8), each 420 ft (130 m) long. Initially a purpose-built 'steam factory' was planned, but following the closure of Woolwich Dockyard in 1869 a number of slip covers were removed from that site and re-erected at the head of the new dry docks to serve as factories for building and fitting engines and for boilermaking.[19]

Plate-bending roller, installed in No 5 Machine Shop in 1913 and now preserved at the Historic Dockyard.

No 1 Basin was officially opened in 1871, with HMS Invincible being brought into No 5 Dock for repairs, with great ceremony.[32] Work on the other docks and basins followed, with No 3 Basin finally being completed in 1883. Two years later the project was largely complete, with facilities provided alongside for gun mounting and mast rigging, as well as a victualling depot and a coaling area.[19] Much of the excavation and building work had been done by convict labour (a convict prison having been built to the north of the dockyard, with the expansion project in mind, in 1853).[33] In 1897 a naval barracks was built on the site of the prison to provide crew accommodation for ships anchored in The Nore; for the next sixty years it served as the headquarters of Nore Command, whose Commander-in-Chief was accommodated in the adjacent Admiralty House.[19]

The Dockyard extension viewed from Upnor, c.1910.

In 1897 a new, even longer dry dock was opened on the north side of No 1 Basin: at its opening, this (No 9 Dock) was the largest in the world at 650 ft (200 m) long by 84 ft (26 m) wide. At around the same time, in the older part of the dockyard, No 7 Slip was extended to accommodate the building of HMS Prince of Wales (launched in 1902), and a new (uncovered) slipway was built a little to the north (No 8 Slip, completed in 1900); at 616 ft (188 m) this was one of the longest slips in the world and was designed for building battleships.[34] (The older slipways, by contrast, were proving much too small and they were mostly filled in around this time, their covered areas being put to alternative uses.) The first battleship to be built on the new No 8 Slip was HMS Africa, launched in 1905; however it also proved to be the last, as it was announced (controversially) that Chatham Dockyard would be unable to accommodate Dreadnoughts[35] Proposals were made for a fourth Basin of 57 acres (230,000 m2), together with additional large docks of up to 800 ft (240 m), to cover the remaining land on St Mary's Island; but these were soon superseded by plans to build an entirely new dockyard at Rosyth.[36]

Nevertheless, Light cruisers and other smaller vessels continued to be built at Chatham during the first half of the 20th century.[37] Also with the 20th century came the submarine. The first submarine to be built at a royal dockyard was HMS C17, launched from No 7 Slip in 1908 and then fitted out in No 2 Dock; three more of the same class followed. During World War I, twelve submarines were built here, but when hostilities ceased, uncompleted boats were scrapped and five years passed before a further ship was launched. In the interwar years, eight S-class submarines were built at Chatham but this was a period of decline.[38]

Last years

Navy Day at HMNB Chatham, c.1977

In February 1958 it was announced in Parliament that Sheerness Dockyard would close in 1960, with Nore Command (and its Chatham-based Commander-in-Chief) to be abolished the following year. At the same time, it was made clear that at Chatham "the dockyard will be retained; but the barracks and other naval establishments will be closed".[39] (In the event, the barracks were reprieved and repurposed rather than being closed at this stage.)

Rennie's No 3 Dock of 1816-21; today it contains HMS Ocelot, the last Royal Navy vessel built at Chatham.

The final boats constructed in Chatham were Template:Sclass-sOcelot was the last vessel built for the Royal Navy, and the final vessel was Okanagan built for the Royal Canadian Navy and launched on 17 September 1966. In 1968, a nuclear submarine refitting complex was built between Nos 6 and 7 dry docks, complete with refuelling cranes and health physics building. In spite of this in June 1981, it was announced to Parliament that the dockyard would be run down and closed in 1984.[40]

Closure

The closure of Chatham Dockyard (along with the adjacent Naval Barracks) was announced in Parliament in June 1981 and scheduled to take place in 1984.[41] Redundancy notices were served, but then abruptly withdrawn following the 1982 invasion of the Falkland Islands; the dockyard was heavily involved in preparing ships for the South Atlantic, and in repairing damaged vessels on their return. Nonetheless, the dockyard closed, as planned, on 31 March 1984.[42] Shortly following the closure the Ministry of Defence, through the Property Services Agency, decided to auction the Rating's Married Quarter housing at nearby Walderslade which were then purchased by Roger Byron-Collins' Welbeck Estate Group.[43]

Regeneration

At the time of its closure the dockyard covered 400 acres (1.6 km2). Thereafter this was divided into three sections:

HMS Gannet at Chatham Historic Dockyard

80 acres (0.32 km2), comprising the 18th century core of the site, was transferred to a charity called the Chatham Historic Dockyard Trust.[44] The Georgian site is now a visitor attraction under the care of the Trust: Chatham Historic Dockyard. The Trust is preparing an application for the Dockyard and its Defences to become a World Heritage Site.[45]

The topsail schooner Julia visiting the middle basin in 2006; behind her is the St Mary's Island housing estate

The easternmost basin (Basin No 3) was handed over to the Medway Ports authority and is now a commercial port (Chatham Docks). It includes Papersafe UK[46] and Nordic Recycling Ltd.[47] In 2013 Peel Ports, which owns and runs Chatham Docks, announced that it was set to convert a 26-acre (0.11 km2) portion of the commercial port into a mixed-use development (incorporating offices, an education facility, apartments, town houses and a food store (Asda), as well as landscaped public areas). The development is called "Chatham Waters".[48] In 2019 Peel announced that Chatham Docks would close in 2025 with the loss of 800 jobs.[49]

The remaining 350 acres (1.4 km2) were transferred to the government's urban regeneration agency (later English Partnerships). Under its remit, the westernmost (No 1) Basin was turned into a marina, part of the former factory area to the south was transformed into an entertainment and retail complex ('Chatham Maritime') and the former Barracks (HMS Pembroke) became Universities at Medway.[50] St Mary's Island, a 150-acre (0.61 km2), largely undeveloped area to the north of the three basins, was transformed into a residential community for some 1,500 homes. It has several themed areas with traditional maritime buildings, a fishing (though in looks only) village with its multi-coloured houses and a modern energy-efficient concept. Many homes have views of the River Medway. A primary school (St. Mary's CofE) and a medical centre provide facilities for the residents and there are attractive walks around the Island.[51]

Filming

Chatham Dockyard has become a popular location for filming, due to its varied and interesting areas such as the cobbled streets, church and over 100 buildings dating from the Georgian and Victorian periods. Productions that have chosen to film at Chatham Dockyard include: Les Misérables,[52] Call the Midwife,[53] Mr Selfridge,[54] Sherlock Holmes: A Game of Shadows,[55] Oliver Twist,[56] The World Is Not Enough [57] and Grantchester.[58]

Descriptions

  • William Camden (1551–1623) described Chatham dockyard as
    • stored for the finest fleet the sun ever beheld, and ready at a minute’s warning, built lately by our most gracious sovereign Elizabeth at great expense for the security of her subjects and the terror of her enemies, with a fort on the shore for its defence.[59]
  • Daniel Defoe visiting the yard in 1705, also spoke of its achievements with an almost incredulous enthusiasm:
    • So great is the order and application there, that a first-rate vessel of war of 106 guns, ordered to be commissioned by Sir Cloudesley Shovell, was ready in three days. At the time the order was given the vessel was entirely unrigged; yet the masts were raised, sails bent, anchors and cables on board, in that time.[60]

Significant buildings within the Georgian Dockyard

Police Section House, one of the Dockyard's many listed buildings

Wood and canvas

  • The Mast Ponds. 1697, 1702. Fir logs were seasoned by immersing them in salt water while the sap died back.
    • South Mast Pond, 1697. Now a car park.[61]
    • North Mast Pond, 1702. The ponds were connected by canal.[61]
  • Clocktower building 1723. The oldest surviving naval storehouse in any Royal Dockyard. The ground floor was a "present use store" and the upper floor was a mould loft. It was rebuilt in 1802 – the timber cladding was replaced by brick. In the 20th century it was used for offices, and was adapted in 1996–1997 to become the University of Kent's Bridge Warden's College.[62][63]
  • Sail and Colour Loft 1723. Constructed from timber recycled from warships probably from the Dutch Wars. Lower floors were for storage, and the upper floor is a large open space for sail construction. In 1758 there were 45 sailmakers. They sewed 2 ft (0.61 m) strips of canvas into the sails using 170 – 190 (5 stitches per inch) stitches per yard, remembering that there would be two rows of stitching to each seam. Flags denoting nationality and for signals were made here. The flags used by Nelson in his "England expects..." message would have been made here.[64]
  • Timber Seasoning Sheds 1774. These were built to a standard design with bays 45 by 20 feet (13.7 by 6.1 m). These are the first standardised industrial buildings. There were 75 bays erected at Chatham Dockyard, to hold three years worth of timber.[65]
  • Wheelwrights' shop circa 1780. This three bay building was built as a mast house using "reclaimed" timber. The top bay was used by the wheelwrights, who constructed and repaired the wheels on the dockyard carts, and may have made ships' wheels. The middle bay was used by the pumpmakers and the coak and treenail makers. Pumps were simple affairs, made of wood with iron and leather fittings. Coaks were the bearings in pulley blocks, and treenails were the long oak pins, made on a lathe, or moot that were used to pin the planking to the frames. The west bay was used by the capstan makers, capstans were used to raise the anchor.[66]
  • Masthouses and Mouldloft 1753–1755. Grade I listed since August 1999.[67] These were used to make and store masts. Here there are seven interlinking masthouses. Above them is the mould loft where the lines of HMS Victory were laid down. The lines of each frame of a ship would be taken from the plan and scribed, full size, into the floor by shipwrights. From this, patterns or moulds would be built using softwoods, and from these the actual frames would be built and shaped. This building houses the "Wooden Walls Exhibition".[68]
  • Joiners Shop c. 1790 originally to make treenails, but later used by the yards joiners. The Resolute Desk (the Oval Office desk) was constructed here by Dockyard Joiners from the timbers of HMS Resolute.[69]
  • Lower Boat House circa 1820 built as a storehouse for squared timber, and later to store ship's boats.[61]

Dry docks and covered slips

  • The covered slips 1838–1855. It was on slipways that ships were built. The slipways were covered, to prevent ships rotting before they had been launched. The earliest covered slips no longer exist (Nos 1 and 2 Slips, which stood either side of the Assistant Queen's Harbourmaster's Office, were given wooden covers in 1817). By 1838 the use of cast and wrought iron in buildings had become feasible. Of those that survive, the oldest slip has a wooden roof, three have cast iron roofing and the latest uses wrought iron; together, they are of unique importance in showing the development of wide span structures such as were later used by the railways.
    • No 3 Slip 1838. This had a linked timber roof truss structure and was originally covered in tarred paper, which was quickly replaced with a zinc roof. The slip was backfilled around 1900 and a steel mezzanine floor was added. It became a store house for ship's boats.[70]
    • No 4, 5 and 6 Slips 1848. These were designed by Captain Thomas Mould, Royal Engineers, and erected by Bakers and Sons of Lambeth. Similar structures were erected at Portsmouth but these are no longer extant. They predate the London train sheds of Paddington and King's Cross which were often cited as the country's first wide span metal structures.[70]
    • No 7 Slip is one of the earliest examples of a modern metal trussed roof. It was designed in 1852 by Colonel Godfrey T. Green, Royal Engineers. It was used for shipbuilding until 1966; HMS Ocelot was launched from there on 5 May 1962.[71]
  • Dry Dock. The docks are filled by sluice gates set into the caissons, and emptied by a series of underground culverts connected to the pumping station. No 1 Dry Dock 1824 (built on the site of "The Old Double Dock") no longer exists; it was filled in and converted into a covered workshop (No 1 Machine Shop) prior to the pioneering construction of HMS Achilles in the adjacent No 2 Dock.
    • No 2 Dry Dock 1856 was built on the site of "The Old Single Dock" where HMS Victory was constructed. In 1863, this dock constructed HMS Achilles, the first iron battleship to be built in a Royal Dockyard. It now houses HMS Cavalier.[62]
    • No 3 Dry Dock 1820, the first to be constructed of stone, was designed by John Rennie. It now houses HMS Ocelot.[62]
    • No 4 Dry Dock 1840 was built on the site of one of a parallel pair of docks built in 1686 (the second of which was converted into the adjacent slipway, No. 3 Slip). It now houses HMS Gannet.[62]
  • South Dock Pumping Station 1822, designed by John Rennie. It originally housed a beam engine, which was replaced by an electric pump in 1920. The building is still in use.[62]

Offices and residential

  • Commissioner's House 1704. This is the oldest surviving naval building in England. It is Grade I listed.[72] It was built for the Resident Commissioner, his family and servants. The previous building was built in 1640 for Phineas Pett. In 1703, Captain George St Lo took up the post and petitioned the Admiralty for a more suitable residence. Internally the principal feature is the main staircase with its painted wooden ceiling attributed to Thomas Highmore (Serjeant Painter), to sketches by Sir James Thornhill.[73]
  • Commissioner's Garden dating from 1640. The lower terraces are one of the first Italianate Water Gardens in England. There is a 400-year-old mulberry tree, from where Oliver Cromwell reputedly watched the Roundhead Army take Rochester from the Royalists. There is an 18th-century icehouse and an Edwardian conservatory with its great vine.[74]
  • Officers' Terrace 1722-3. Twelve houses built for senior officers in the Dockyard. The ground floor were built as offices, the first floor contained reception rooms with bedrooms above. Each has a 18C walled garden, which again are now very rare. They are now privately owned.[69]
  • House Carpenters' Shop c 1740. Built to harmonise with the officers' terrace. House Carpenters worked solely on maintaining the dockyard buildings.[69]
  • Stables. For officers' horses.[64]
  • Main gatehouse 1722, designed by the master shipwright in the style of Vanbrugh. It bears the arms of George III. Inside the gateway stands the muster bell on a wrought iron mast dating from the late 18th or early 19th century; it is Grade II* listed.[75][76]
  • Guard House 1764. Built when Marines were introduced into the Dockyard to improve security. It continued in use till 1984.[64]
  • Cashiers' Office 18C. John Dickens, father of Charles Dickens, worked here from 1817 to 1822. It is still used as offices.[69]
  • Assistant Queen's Harbourmaster's Office c. 1770, Grade II* listed.[77] This office was supplied to the person who has been appointed to superintend the Dockyard Port. In 1865, the whole of the tidal Medway from Allington Lock to Sheerness was designated as a dockyard port and the Assistant Queen's Harbourmaster was responsible for all moorings and movements. Alongside this office is a set of stone steps leading into the river Medway, with a wrought iron arch and lantern holder. Also Grade II listed.[78] This was called the "Queen Stairs"[79] and was the formal entry into the dockyard, during the "Age of Sail".[74]
  • Admiral's Offices 1808. Designed by Edward Holl as offices for the master shipwright. The roofline was low so it would not obstruct the view from the officers' terrace. Later it became Port Admiral's office and was extended. The northern extension became the dockyard's communication centre.[73]
  • Thunderbolt Pier, a pier named after HMS Thunderbolt, built 1856, which was used as a floating pier from 1873 until 1948, when she was rammed and sunk.[80]
  • Captain of the Dockyard's House 19C. Now used as offices. Also Grade II* listed.[81][82]

Anchor Wharf and the Ropery

  • Anchor Wharf Store Houses 1778–1805 (at nearly 700 feet long) are the largest storehouses ever built for the navy.[83]
    • The southern building, Store House No 3, completed in 1785, is subdivided with timber lattice partitions as a "lay apart store", a store for equipment from vessels under repair. It has been Grade I listed since August 1999.[83]
    • The northern building was used as a fitted rigging house, and a general store for equipment to fit out newly built ships. It also has been Grade I listed since August 1999.[84] The Fitted Rigging House is now used as the Library and houses the Steam Steel and Submarines 1832–1984 gallery.[85]
  • The Ropery consists of Hemp Houses (1728 extended 1812), Yarn Houses and a double Rope House with attached Hatchelling House. Hatchelling is combing the hemp fibres to straighten them out before spinning. This was the first stage of the ropemaking process. The Ropery is still in use, being operated by Master Ropemakers Ltd.[86]
    • The Double Rope House has spinning on the upper floors and ropemaking (a ropewalk) on the ground floor.[87] It is 346 m (1,135 ft) long, and when constructed was the longest brickbuilt building in Europe capable of laying a 1,000 ft (300 m) rope. Over 200 men were required before 1836, to make and lay a 20in (circumference) cable. All was done by hand. Steam power in the form of a beam engine was introduced in 1836, and then electricity in the early 1900s.
    • The White Yarn House to store the yarn before it was tarred to prevent rot.
    • The Tarring House with its "Tar Kettle" and horse drawn winch.
    • The Black Yarn House to store the tarred yarn. The tarring process declined as manila replaced hemp, and sisal replaced manila. These fibres were chemically protected at the hatchelling stage and tarring stopped in the 1940s.

Later buildings

  • No 1 Smithery 1808. It was designed by Edward Holl, for production of Anchors and Chain. Anchors could weigh 72 cwt (3657 kg), and were forged by hand. "Anchorsmiths" were given an allowance of 8 pints of strong beer a day, because of the difficult working conditions.[65]
  • Dockyard Church 1806. Designed by Edward Holl, it has a gallery supported on cast iron columns, one of the first uses of cast iron in the dockyard. Last used in 1981.[64]
  • Brunel Saw Mill 1814. Until 1814 timber was cut by pairs of men, one above and one below the log. In 1758, there were 43 pairs of sawyers working in the yard. In 1812, the sawmill was designed by Marc Brunel, father of Isambard Kingdom Brunel. The mill was driven by steam. The mill was linked to the mast ponds by a mechanical timber transport system, and underground canals. Later the basement was converted into a steam laundry.[65]
  • Lead and Paint Mill 1818. Designed by Edward Holl to be fireproof. There were a lead furnace, casting area and steam powered double rolling mill, paint mills for grinding pigment, canvas stretching frames, and vats for storing and boiling linseed oil. A warship was painted every 4 months.[76]
  • No 1 Machine Shop. This building retains it original structure and roof glazing. It was used to house the machine tools needed to produce HMS Achilles, the first iron battleship built in a Royal Dockyard. This building has now become home to the railway workshop.[62]
  • The Galvanising Shop c1890. Galvanising is a process of dipping steel in molten zinc to prevent it from rusting. There were baths of acid and molten zinc, the fumes vented through louvres in the roof.[65]
  • Chain Cable Shed c1900, built to protect newly manufactured anchor chain. It is supported by a row of 28 captured French and Spanish guns.[76]

Surviving structures within the Victorian Dockyard

Victorian Steam Yard

  • The Victorian Steam Yard was built around three large Basins (wet docks), constructed between 1865 and 1885 along the line of St Mary's Creek (separating St Mary's Island from the mainland). It was envisaged that Basin No 1 would serve as a "repair basin", No 2 as the "factory basin" and No 3 as the "fitting-out" basin; a newly launched ship could therefore enter via the west lock, have any defects remedied in the first basin, have her steam engines and heavy machinery installed in the second, and then be finished, and loaded with coal and provisions, in the third before leaving via the east locks.[19]
  • Four drydocks (Nos 5–8) were constructed at the same time on the south side of No 1 Basin; all four were in use by 1873. The yard's Steam Factory complex was built at around the same time; most of its buildings were sited around these docks (rather than by Basin No 2 as had originally been planned).[88]
  • No 1 Boiler Shop and No 8 Machine Shop were originally built as slip covers at Woolwich Dockyard in the 1840s. When that Dockyard closed in 1869 they were dismantled and rebuilt at Chatham alongside the new dry docks. Only the framework survives of the Machine Shop, but the Boiler Shop was renovated in 2003 to house the Dockyard Outlet shopping centre. A third such structure from Woolwich, similar in design to the boiler shop, stood nearby and served as a fitting shop; it was demolished in 1990.[89]
  • Dock Pumping Station 1874: as well as serving to empty dry docks 5–8 when required, its accumulator tower provided hydraulic power for the adjacent cranes, capstans and caissons.[90] Two other pumping stations served a similar purpose (one for dock 9 and one for the two east locks) but they have not survived.[19]
  • Combined Ship Trade Office 1880: now the "Ship & Trades" public house.[91]
  • A fifth dry dock (No 9) was added in 1895 on the north side of No 1 Basin, opposite the other four, to accommodate the new, larger battleships which were then under construction. It was completed in 1903.[92]
  • The 100 ft bell mast was erected in 1903 alongside the Dockyard's Pembroke Gate, where it was used to signal the start of each working day. (A similar but older mast fulfilled the same function alongside the main gate in the Georgian part of the Yard.) The 1903 mast had originally served as foremast to HMS Undaunted. In 1992 it had been dismantled, but was re-erected, a short distance from its original location, in 2001. Apart from the two Chatham examples, only one other is believed to have survived: in Devonport's Morice Ordnance Yard.[93]

Administration of the dockyard

The Commissioner's House (1704), was built for Captain George St Lo, who found the previous house unsuitable. It remains the oldest surviving naval building in England.

Resident Commissioners of the Navy Board

The Commissioner of Chatham Dockyard held a seat and a vote on the Navy Board in London. The Commissioners were:[94]

In 1832 the post of commissioner was replaced by the post of superintendent, who was invested with the same power and authority as the former commissioners, "except in matters requiring an Act of Parliament to be submitted by the Commissioner of the Navy".

Admiral/Captain superintendents

Note incomplete list included.[105]

After the abolition of the post of Commander-in-Chief, The Nore, Chatham's Admiral Superintendent took on the additional role of local Flag Officer (with local command responsibilities) and the title Flag Officer, Medway.[115]

Flag Officer, Medway and Admiral Superintendent

Included:[116]

On 5 September 1971 all Flag Officers of the Royal Navy holding positions of Admiral Superintendents at Royal Dockyards were redesignated as Port Admirals. While they retained command over the naval personnel on site, and responsibility for the base as a whole,[119] their oversight of the work of the dockyard was transferred to new civilian Dockyard General Managers, who had management responsibility across all Departments.[120]

Flag Officer, Medway and Port Admiral

The Gun Wharf

The Ordnance Storekeeper's house at the heart of the former Gun Wharf

An Ordnance Yard was established in the 17th century immediately upriver of the Dockyard (on the site of the original Tudor yard, vacated in 1622). The yard would have received, stored and issued cannons and gun-carriages (along with projectiles, accoutrements and also all manner of small arms) for ships based in the Medway, as well as for local artillery emplacements and for army use. (Gunpowder, on the other hand, was received, stored and issued across the river at Upnor Castle.)[124]

The Gun Wharf, c.1890: the 1717 Grand Store can be seen left of centre (with the Dockyard's Anchor Wharf storehouse in the distance beyond). The surviving carpenters' shop and machine shop are on the right.

A plan of 1704 shows (from north to south) a long Storehouse parallel to the river, the Storekeeper's house (the Storekeeper was the senior officer of the Yard) and a pair of Carriage Stores. In 1717 the original Storehouse was replaced with the Grand Store (a much larger three-storey building, contemporary with and of a similar style to, the Main Gatehouse in the Dockyard). Not long afterwards a large new single-storey Carriage Store, with a long frontage parallel to the river, was constructed, adjoining the Storekeeper's House to the south.[125]

The Library (former machine shop)

After the demise of the Board of Ordnance (1855), Ordnance Yards passed under the control of the War Office, and were eventually (in 1891) apportioned to either the Army or the Navy. Chatham's yard was split in two, the area south of the Storekeeper's House becoming an Army Ordnance Store, and the rest a Navy Ordnance Store. It remained thus until 1958 when the yards were closed (the Army depot having served latterly as an atomic weapons research laboratory).[126] Most of the 18th-century buildings were demolished, with the exception of the Storekeeper's House of 1719, which survives as the Command House public house.[127] A few later buildings have survived: a long brick shed of 1805, south-west of the Command House, which once housed carpenters, wheelwrights and other workers as well as stores of various kinds,[128] the adjacent building (machine shop, late-19th century) which now serves as a public library, and the building known as the White House (built as the Clerk of the Cheque's residence in 1816).[19]

Defence of the dockyard

Upnor Castle

Dockyards have always required shore defences. Among the earliest for Chatham was Upnor Castle, built in 1567, on the opposite side of the River Medway. It was somewhat unfortunate that, on the one occasion when it was required for action—the Raid on the Medway, 1667—the Dutch fleet were able to sail right past it to attack the English fleet and carry off the pride of the fleet, HMS Royal Charles, back to the Netherlands.[129]

Chain defence

During the wars with Spain it was usual for ships to anchor at Chatham in reserve; consequently John Hawkins threw a massive chain across the River Medway for extra defence in 1585. Hawkins' chain was later replaced with a boom of masts, iron, cordage, and the hulls of two old ships, besides a couple of ruined pinnacles.[130]

The Lines

With the failure of Upnor Castle, it was seen necessary to increase the defences. In the event, those defences were built in distinct phases, as the government saw the increasing threat of invasion:[131]

  • 1669 Fort Gillingham and Cockham Wood Fort built.
  • 1756 Chatham Lines built, to designs by Captain John Desmaretz (who also designed the Portsmouth fortifications).[131] This fortification, and its subsequent upgrading, were to concentrate on an overland attack and so were built to face south. They included redoubts at Amherst and Townsend. The Lines enclosed the entire dockyard on its eastern side.
  • 1778–1783 Further improvements were carried out, to the designs of Captain Hugh Debbeig at the bequest of General Amherst. In 1782, an Act of Parliament increased the land needed for the Field of Fire.[131]
  • 1805–1812 Amherst redoubt, now Fort Amherst; new forts, named Pitt and Clarence. The Lines were also extended to the east of Saint Mary's Creek (on St Mary's Island).[131]
  • 1860s Grain Fort, and other smaller batteries in that area.
  • 1870–1892 A number of forts built at a greater distance from the dockyard: Forts Bridgewood, Luton, Borstal, Horsted and Darland. These became known as the "Great Lines". Forts Darnet and Hoo built on islands in the River Medway.

Associated barracks

Surviving 1757 block from the original Infantry Barracks

The Dockyard led to large numbers of military personnel being garrisoned in Chatham and the surrounding area. A good many were engaged in manning the defences, but some had other duties; others were accommodated there for convenience prior to embarking on ships for duties overseas, or following their disembarkation. Initially, soldiers were housed under canvas or else billetted in houses and inns, but from the 18th century barracks began to be constructed. The oldest surviving barracks in the Chatham area is in Upnor; dating from 1718, it housed the detachment of 64 men responsible for guarding the gunpowder store in Upnor Castle.[124]

Infantry Barracks (Kitchener Barracks)

Kitchener Barracks (1950s extension, demolished in 2017).

Chatham Infantry Barracks was opened in 1757 to house troops manning the fortifications which had recently been built to defend the Dockyard. Within the space of 20 years it had taken on the additional role of national recruitment centre for the British Army, providing basic training for all new recruits. This role ceased in 1803, but the barracks went on to serve as a home depot for numerous regiments stationed around the globe. Accommodating some 1,800 men, Chatham was one of the first large-scale Army barracks in England, and remained in military use until 2014.[132] One barrack block remains from 1757; the rest was largely demolished and rebuilt to a more modern design in the 1930s–50s. In 1928 the barracks was taken over by the Royal Engineers and renamed Kitchener Barracks. In 2014 the site was sold to a property developer, with permission given the following year for the building of 295 homes. The main 1930s barracks building is being retained, along with the remaining earlier structures.[133] The new development has retained the name Kitchener Barracks.[134]

Marine Barracks

The Royal Marine Barracks in the Second World War.

The Royal Marine Barracks, Chatham were established in 1779, on a site nestled between the Gun Wharf to the west, the Dockyard to the north, and Infantry Barracks to the east. The site was expanded and rebuilt in the 1860s; in 1905 the Royal Marines took over Melville Barracks, which stood between Dock Road and Brompton Hill (it had formerly served as Chatham's Royal Naval Hospital). The Marines were withdrawn from Chatham in 1950, and the buildings were later demolished. Medway Council offices and car park now stand on the site.[135]

Artillery/Engineer Barracks (Brompton Barracks)

Royal School of Military Engineering (1872) and Boer War Memorial Arch (1902) at Brompton Barracks.

A barracks was built in Brompton in 1804–06 for the Royal Artillery gunners serving on the defensive Lines (previously they had been accommodated in the Infantry Barracks). There was space for some 500 horses and 1,000 men. In 1812 the Royal Engineers Establishment was founded within the barracks to provide instruction in military engineering. The Establishment grew, and by 1856 the Artillery had moved out; Brompton Barracks remains in service as headquarters of the Royal Engineers.[136]

The Garrison Church of St Barbara in Maxwell Road continues to serve Brompton Barracks.

St Mary's Barracks

St Mary's Casemated Barracks were built during the Peninsular War and initially held French prisoners of war. After the war's end, they went on to serve as a gunpowder store for a time, and were used by the Royal Engineers (based nearby in Brompton Barracks). From 1844 St Mary's was used as an 'Invalid Barracks', accommodating soldiers having to return from service in different parts of the British Empire because of illness, injury or age.[137] Built within the defensive earthworks to the north of Chatham, St Mary's Barracks was demolished in the 1960s and the land used for housing.[138]

HMS Pembroke: former officers' quarters

The Naval Barracks (later HMS Pembroke) opened in 1902; prior to this, most Naval (as opposed to Dockyard) personnel were accommodated on board their ships or on hulks moored nearby. Built on the site of what had been the convict prison, the barracks complex could accommodate 4,742 officers and seamen in a series of large blocks built along the length of a terrace. Below the terrace lay the parade ground and its adjacent drill hall and other amenities. A further 3,000 troops could be accommodated in times of "total emergency" (900 were sleeping in the Drill Hall when it suffered a direct hit from two bombs in September 1917, which killed over 130 men). The barracks were set to close in 1961 when the majority of naval personnel were withdrawn from Chatham;[139] however, it went on to serve instead as the RN Supply and Secretariat School in succession to HMS Ceres, before finally being closed along with the Dockyard in 1984. The majority of its buildings are still standing, several of them occupied by the Universities at Medway.[140]

See also

References

  1. ^ National Archives, AO 3/1/1
  2. ^ Longmate, Norman (1989). Defending The Island: From Caesar to the Armada. Hutchinson. ISBN 978-0091709105.
  3. ^ "20th-Century Naval Dockyards...Characterisation Report, Part 1". Historic England. Naval Dockyards Society. Retrieved 7 February 2017.
  4. ^ MacDougall, p. 9
  5. ^ Saint & Guillery, The Survey of London vol. 48: Woolwich, Yale, 2012.
  6. ^ "Research guide: Royal Dockyard names and locations". National Archives. Retrieved 7 February 2017.
  7. ^ MacDougall, p. 12
  8. ^ a b c Cull, Frederick (1962). "Chatham - The Hill House (1567-1805)" (PDF). Archaeologia Cantiana. 77: 95–109. Retrieved 29 November 2019.
  9. ^ MacDougall, p. 13
  10. ^ a b Guidebook, p. 28
  11. ^ "Visits to Rochester and Chatham" (PDF). Kent Archaeology. p. 55.
  12. ^ MacDougall, p. 15
  13. ^ MacDougall, p. 16
  14. ^ MacDougall, p. 17
  15. ^ a b Guidebook, p. 29
  16. ^ MacDougall, p. 25
  17. ^ MacDougall, p. 29
  18. ^ Hughes, David T. (2002). Sheerness Naval Dockyard and Garrison. Stroud, Gloucs.: The History Press.
  19. ^ a b c d e f g h i j k l m n Coad, Jonathan (2013). Support the Fleet: Architecture and engineering of the Royal Navy's bases, 1700–1914. Swindon: English Heritage.
  20. ^ MacDougall, p. 22
  21. ^ "Chatham Dockyard". Battleships cruisers. Retrieved 2 September 2016.
  22. ^ Eastland & Ballantyne, p. 13
  23. ^ "HMS Unicorn: Summary from the Official HMS Unicorn website". Archived from the original on 15 June 2010. Retrieved 15 June 2010.
  24. ^ a b No.1 Smithery (Grade II* listing)
  25. ^ MacDougall, p. 124
  26. ^ MacDougall, pp. 89-90
  27. ^ MacDougall, pp. 110-112
  28. ^ MacDougall, p. 118
  29. ^ No.1 Workbase (Grade II* listing)
  30. ^ "Marine Steam Engine". History.net. Retrieved 26 November 2019.
  31. ^ MacDougall, p. 124
  32. ^ MacDougall, p. 124
  33. ^ "Mutiny in Chatham's prison hulks". Medway Memories. Retrieved 23 November 2019.
  34. ^ MacDougall, p. 144
  35. ^ MacDougall, p. 143
  36. ^ "Accommodation for 'monster ships'". Royal Museums Greenwich. Retrieved 30 November 2019.
  37. ^ "HMS Arethusa". Uboat.net. Retrieved 25 November 2019.
  38. ^ "Submarines World War 2". Harwich and Dovercourt. Retrieved 20 June 2019.
  39. ^ [https://hansard.parliament.uk/html/Lords/1958-02-18/LordsChamber#775 HL Deb, 18 February 1958 vol 207 cc775-81 ]
  40. ^ "Chatham Dockyard: Lasting impact three decades on". BBC. 31 March 2014. Retrieved 1 January 2018.
  41. ^ [https://hansard.parliament.uk/html/Commons/1981-06-25/CommonsChamber#385 HC Deb, 25 June 1981 vol 7 cc385-400 ]
  42. ^ MacDougall, p. 171
  43. ^ www.twsg.co.uk
  44. ^ "Economic impact of the Historic Dockyard Chatham". Chatham Historic Dockyard. Archived from the original on 25 March 2016. Retrieved 25 March 2016.
  45. ^ "World heritage bid for dockyard". BBC. 6 June 2007. Retrieved 25 March 2016.
  46. ^ Papersafe UK, Berth 6, Basin 3, Chatham | STORAGE. Yell. Retrieved on 17 July 2013.
  47. ^ "Nordic Recycling" (PDF). Archived from the original (PDF) on 15 October 2014. Retrieved 19 April 2012.
  48. ^ "Chatham Waters". www.peel.co.uk. Archived from the original on 15 May 2013. Retrieved 12 April 2013.
  49. ^ "Peel L&P to close Chatham Docks in Medway in 2025". Kent Online. Retrieved 27 November 2019.
  50. ^ MacDougall, p. 177
  51. ^ "St Mary's Island". Retrieved 25 March 2016.
  52. ^ Kent Film Office. "Kent Film Office Les Miserables Film Focus".
  53. ^ Kent Film Office. "Kent Film Office Call The Midwife Film Focus".
  54. ^ Kent Film Office. "Kent Film Office Mr Selfridge Film Focus".
  55. ^ Kent Film Office. "Kent Film Office Sherlock Holmes: A Game of Shadows Film Focus".
  56. ^ Kent Film Office. "Kent Film Office Oliver Twist Film Focus".
  57. ^ Kent Film Office. "Kent Film Office The World is Not EnoughFilm Focus".
  58. ^ Kent Film Office. "Kent Film Office Grantchester Article". Archived from the original on 22 December 2015.
  59. ^ Brayley and Britton, p. 667
  60. ^ "Kanye video to become a museum exhibit". The Guardian. 20 July 2015. Retrieved 25 March 2016.
  61. ^ a b c Guidebook, p. 27
  62. ^ a b c d e f Guidebook, p. 14
  63. ^ "Bridge Wardens' College Teaching and Meeting Rooms". www.kent.ac.uk. Retrieved 27 October 2013.
  64. ^ a b c d Guidebook, p. 23
  65. ^ a b c d Guidebook, p. 26
  66. ^ Guidebook, p. 9
  67. ^ "Former Mast House and Mould Loft, Medway". www.britishlistedbuildings.co.uk. Retrieved 27 October 2013.
  68. ^ Guidebook, p. 8
  69. ^ a b c d Guidebook, p. 25
  70. ^ a b Guidebook, p. 10
  71. ^ Guidebook, p. 12
  72. ^ "Former Commissioners House and Attached Staff Accommodation, Medway". www.britishlistedbuildings.co.uk. Retrieved 27 October 2013.
  73. ^ a b Guidebook, p. 15
  74. ^ a b Guidebook, p. 16
  75. ^ Historic England. "Bell Mast (1378626)". National Heritage List for England. Retrieved 28 July 2015.
  76. ^ a b c Guidebook, p. 22
  77. ^ "Former Assistant Queens Harbourmasters Office, Medway". www.britishlistedbuildings.co.uk. Retrieved 8 January 2014.
  78. ^ "Queens Stairs with Overthrow Arch, Medway". www.britishlistedbuildings.co.uk. Retrieved 8 January 2014.
  79. ^ "Steps from Quay, Chatham Historic Dockyard, Kent". www.geograph.org.uk. 21 August 2011. Retrieved 8 January 2014.
  80. ^ "Thunderbolt Pier and Kingswear Castle, Chatham". UK BeachesGuide. Retrieved 25 March 2016.
  81. ^ "Former Captain of the Dockyards House and Attached Front Area Railings, Medway". www.britishlistedbuildings.co.uk. Retrieved 8 January 2014.
  82. ^ Guidebook, p. 24
  83. ^ a b "Former Storehouse Number 3 and Former Chain Cable Store, Medway". www.britishlistedbuildings.co.uk. Retrieved 8 January 2014.
  84. ^ "Former Storehouse Number 2 and Former Rigging Store, Medway". www.britishlistedbuildings.co.uk. Retrieved 8 January 2014.
  85. ^ Guidebook, p. 17
  86. ^ "Master Ropemakers Chatham". www.master-ropemakers.co.uk. Retrieved 8 January 2014.
  87. ^ Guidebook, p. 18
  88. ^ Guidebook, p. 30
  89. ^ "Engineering timelines".
  90. ^ Historic England. "Dock Pumping Station (1246993)". National Heritage List for England. Retrieved 23 June 2015.
  91. ^ Historic England. "Combined Ship Trade Office (1267779)". National Heritage List for England. Retrieved 23 June 2015.
  92. ^ "Accommodation for 'monster ships'". Royal Museums Greenwich. Retrieved 20 June 2019.
  93. ^ "Bell Mast".
  94. ^ Beaston , p. 351
  95. ^ Perrin, p. 146
  96. ^ "Peter Pett (1610–1672)". History of Parliament. Retrieved 27 March 2016.
  97. ^ Sephton, p. 151
  98. ^ Beaston 1788, p. 85
  99. ^ a b c d e f g h i j k Beaston 1788, p. 351
  100. ^ MacDonald, p.230
  101. ^ "Charles Hope". More than Nelson. Retrieved 25 March 2016.
  102. ^ Marshall, p. 48
  103. ^ Clowes, Sir William Laird (1897–1903). The royal navy, a history from the earliest times to present (6 ed.). London, England: S. Low, Marston, Co. p. 187.{{cite book}}: CS1 maint: date format (link)
  104. ^ Clowes. p.187.
  105. ^ Harley, Simon; Lovell, Tony. "Chatham Royal Dockyard – The Dreadnought Project". dreadnoughtproject.org. Lovell and Harley, 17 July 2017. Retrieved 12 September 2017.
  106. ^ Government, H.M. (20 March 1834). "Dockyards: Officers". The Navy List. London: H.M. Stationery Office. p. 136.
  107. ^ Government, H.M. (20 June 1848). "Dockyards: Officers". The Navy List. London: H.M. Stationery Office. p. 163.
  108. ^ Government, H.M. (20 December 1853). "Dockyards: Officers". The Navy List. London: H.M. Stationery Office. p. 189.
  109. ^ Government, H.M. (20 September 1854). "Dockyards: Officers of". The Navy List. John Murray. p. 191.
  110. ^ Laughton, John Knox. "Wyvill Christopher (1792–1863)". Dictionary of National Biography, 1885–1900. Wikisource, 24 April 2014. Retrieved 12 September 2017.
  111. ^ Government, H.M. (20 June 1863). "Dockyards: Officers of". The Navy List. John Murray. p. 232.
  112. ^ Government, H.M. (20 December 1867). "Dockyards: Officers of". The Navy List. John Murray. p. 259.
  113. ^ "Naval & Military intelligence". The Times. No. 36862. London. 2 September 1902. p. 4. template uses deprecated parameter(s) (help)
  114. ^ Government, H.M. (May 1951). "Principle Officers in the Dockyards". The Navy List. H.M. Stationery Office. p. 362.
  115. ^ [https://hansard.parliament.uk/html/Commons/1960-03-07/CommonsChamber#198 HC Deb, 7 March 1960 vol 619 cc198 ]
  116. ^ Mackie, Colin. "Royal Navy Senior Appointments from 1865". gulabin.com. Colin Mackie, pp.108–109. February 2018. Retrieved 15 February 2018.
  117. ^ Vat, Dan van der (12 June 2005). "Obituary: Vice Adm Sir John Parker". the Guardian. Retrieved 15 February 2018.
  118. ^ Obituary (30 March 2010). "Rear-Admiral Derick Lawson". Retrieved 15 February 2018.
  119. ^ [https://hansard.parliament.uk/html/Commons/1969-03-20/CommonsChamber#782 HC Deb, 20 March 1969 vol 780 cc782 ]
  120. ^ "1971 – Admiral Superintendents become Port Admirals – Portsmouth Royal Dockyard Historical Trust". portsmouthdockyard.org.uk. Portsmouth Historical Dockyard Trust. Retrieved 19 December 2017.
  121. ^ Obituary (29 March 2009). "Rear-Admiral Colin Dunlop". Retrieved 15 February 2018.
  122. ^ "Person Page". www.thepeerage.com. The Peerage, 8 February 2018. Retrieved 15 February 2018.
  123. ^ Obituary (6 February 2007). "Rear-Admiral Bill Higgins". The Daily Telegraph. Retrieved 15 February 2018.
  124. ^ a b Heritage, English; Saunders, A. D. (1 January 1985). Upnor Castle: Kent. English Heritage. p. 5. ISBN 978-1-85074-039-1.
  125. ^ Historic England. "Command House and attached entrance railings, stable and carriage house and rear wall (1268227)". National Heritage List for England.
  126. ^ "English Heritage report:AWRE Foulness" (PDF). Archived from the original (PDF) on 24 February 2015.
  127. ^ "Listed building description (Command House)".
  128. ^ "Listed building description (Ordnance Store)".
  129. ^ Saunders, p. 14
  130. ^ "Records of the hospital of Sir John Hawkins Kt in Chatham (1500) 1594–1987". National Archives. Retrieved 25 March 2016.
  131. ^ a b c d "Brompton Lines Conservation Area Appraisal (Adopted Version)" (PDF). www.medway.gov.uk. May 2006. Archived from the original (PDF) on 21 February 2014. Retrieved 3 February 2014.
  132. ^ Historic England. "Details from listed building database (1410725)". National Heritage List for England. Retrieved 28 July 2015.
  133. ^ "Kitchener Barracks to be converted for housing". Kent on line. 30 April 2015. Retrieved 25 March 2016.
  134. ^ "Heritage". Kitchener Barracks. Retrieved 30 November 2019.
  135. ^ "Chatham Royal Naval Division Barracks". Roll of Honour. Retrieved 25 March 2016.
  136. ^ "Brompton Barracks". Brompton History. Archived from the original on 29 November 2014. Retrieved 25 March 2016.
  137. ^ "Illustrated London News, March 8 1856". Kent History Forum. Retrieved 9 September 2015.
  138. ^ "Fort Amherst Guidebook". Retrieved 25 March 2016.
  139. ^ Copy of government briefing paper
  140. ^ Coad, Jonathan (2013). Support for the Fleet. Swindon: English Heritage.

Sources