Jump to content

Konkan Railway zone

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Dr.Kinshuk (talk | contribs) at 11:45, 22 March 2020 (Mistake in writing reverted). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Konkan Railway zone
File:KRLogo.jpeg
Overview
StatusOperational
OwnerMinistry of Railways
LocaleKonkan, India
Termini
Stations67
Websitewww.konkanrailway.com
Service
TypeRegional rail
Operator(s)Konkan Railway Corporation
Depot(s)Verna
History
Opened26 January 1998; 26 years ago (1998-01-26)
Technical
Line length736 km (457.33 mi)
Number of tracks1
Track gauge1,676 mm (5 ft 6 in)
ElectrificationIn progress
Operating speed120 km/h (75 mph)
Route map

km
to Panvel (CSTM)
0.000
Roha
(RN)
12.916
Kolad
24
Indapur
30.300
Mangaon
41
Goregaon Road
46.885
Veer
tunnel 1
Dasgaon Bridge
across Savitri River
55
Sape Wamane
tunnel 2
62.785
Karanjadi
tunnel 3
tunnel 4
tunnel 5
71
Vinhere
Natuwadi Tunnel
(tunnel 6)
4.389 km
2.727 mi
80.585
Diwankhavati
tunnel 7
Kalambani
Jagbudi River
98.285
Khed
tunnel 8
tunnel 9
tunnel 10
tunnel 11
tunnel 12
111.690
Anjani
tunnel 13
tunnel 14
tunnel 15
127.877
Chiplun
Vashishti River
Chiplun Tunnel
(tunnel 16)
2.100 km
1.305 mi
137.646
Kamathe
Savarde Tunnel
(tunnel 17)
3.429 km
2.131 mi
146.302
Sawarda
tunnel 18
tunnel 19
Jaigad River
156.414
Aravali Road
tunnel 20
Aravali Tunnel
(tunnel 21)
2.161 km
1.343 mi
tunnel 22
tunnel 23
170.285
Sangameshwar Road
tunnel 24
tunnel 25
tunnel 26
178.200
Digni
Shastri Bridge across Bav River
Parchuri Tunnel
(tunnel 27)
2.552 km
1.586 mi
tunnel 28
Ukshi Tunnel
(tunnel 29)
0.104 km
0.065 mi
183.962
Ukshi
tunnel 30
tunnel 31
tunnel 32
Ukshi Falls
tunnel 33
tunnel 34
Karbude Tunnel
(tunnel 35)
6.506 km
4.043 mi
196.482
Bhoke
viaduct
tunnel 36
tunnel 37
203.600
Ratnagiri
tunnel 38
Pomendi viaduct
tunnel 39
Panval Nadi/Panval Setu
Viaduct over Panval River
Tike Tunnel
(tunnel 40)
4.077 km
2.533 mi
tunnel 41
218.993
Nivasar
tunnel 42
tunnel 43
tunnel 44
tunnel 45
tunnel 46
Kajali River
tunnel 47
235.280
Adavali
tunnel 48
tunnel 49
Berdewadi Tunnel
(tunnel 50)
4.00 km
2.49 mi
Veravali
tunnel 51
Muchkundi River
tunnel 52
249.713
250.282
tunnel 53
0.569 km
0.354 mi
250.718
Vilavade
tunnel 54
tunnel 55
tunnel 56
tunnel 57
tunnel 58
tunnel 59
tunnel 60
Saundal
Arjuna River
tunnel 61
tunnel 62
267.349
Rajapur Road
tunnel 63
tunnel 64
tunnel 65
Vaghotan River
Chinchawali
tunnel 66
tunnel 67
283.943
Vaibhavwadi Road
Devgad (tributary)
Devgad River
299.552
Nandgaon Road
Janavali River
314
Kankavali
Gad River
Kasal River
332.560
Sindhudurg
Karli River
343.037
Kudal
353
Zarap
363.880
Sawantwadi Road
371
Madure
Maharashtra
Goa
state
border
RN
KAWR
limits
Terekhol River
Pernem Tunnel
(tunnel 69)
1 km
1 mi
385.520
Pernem
Revora Bridge across
Chapora River
396.430
Thivim
Assonora River
 
(side branch)
Mandovi River
(main branch)
411.866
412.410
Old Goa Tunnel
(tunnel 70)
0.544 km
0.338 mi
411
Karmali
tunnel 71
429.8
Verna
434.8
Majorda Junction
Suravali
442.460
Madgaon Junction
tunnel 72
tunnel 73
458.635
Balli
tunnel 74
Barcem Tunnel
(tunnel 75)
3.343 km
2.077 mi
tunnel 76
tunnel 77
475.240
Canacona
Talpona River
Galgibag River
Loliem Tunnel
(tunnel 78)
0.835 km
0.519 mi
482
Loliem
tunnel 79
Goa
Karnataka
state border
493.221
Asnoti
Karwar Bridge across
Kalinadi River
501.021
Karwar
Karwar Tunnel
(tunnel 80)
2.950 km
1.833 mi
tunnel 81
tunnel 82
514.636
Harwada
Hattikeri
River
tunnel 83
529.001
Ankola
Gangavali River
536.941
Gokarna Road
tunnel 84
548.480
Mirjan
tunnel 85
Aghnashini River
556.032
Kumta
569.812
Honnavar
Honnavar Tunnel
(tunnel 87)
Honnavar Tunnel
(tunnel 88)
1.254 km
0.779 mi
Badagani River
Sharavati River
tunnel 89
587.608
Manki
596.005
Murdeshwar
603
Chitrapur
Venkatapur River
tunnel 90
610.740
Bhatkal
618.6
Shiroor
tunnel 91
625
Mookambika Road Byndoor
Byndoor River
632.352
Bijoor
Yadamavu River
Kolluru River
646.192
Senapura
Chakra River
 
(side branch)
Panchagagavali River
(main branch)
660.0
Kundapura
675.572
Barkur
Sita River
River am Uppoor/Heroor Damm
Suvarna River
691.9
Udupi
Udyavara River
700
Innanje
708.320
Padubidri
Udupi Power Corp. Ltd.
coal power station
715
Nandikoor
Shambavi River
724.8
Mulki
Nandini River
733.825
Surathkal
738.440
Thokur
(KAWR)
to New Mangalore Port
740
Jokatte
to Hassan Junction (MYS)
to Mangalore Junction (PGTTooltip Palakkad railway division)
km
See caption
Bilingual Konkan Railway Zone initials
Map of west-central India
Route map
Indian Railways zone map; 17 is Konkan Railway
View from a train
Express train in Konkan

The Konkan Railway (abbreviated KR and केरे.) is a railway operated by the Konkan Railway Corporation, with its headquarters at CBD Belapur in Navi Mumbai, Maharashtra, India. The first passenger train ran on Konkan railway tracks on 20 March 1993, between Udupi and Mangalore.[1] During its initial years of operation in the mountainous Konkan region, a number of accidents prompted Konkan Railway to implement new technology. Anti-collision devices, the Sky Bus and roll-on/roll-off (RORO) are several of the railway's innovations.[2] The 741-km (461-mi) line connects the states of Maharashtra, Goa and Karnataka. The first train on the completed track was sent off on January 26, 1998.[3][failed verification]

History

Background

Another view from a train
Crossing a long bridge between two hills
Another view from a moving train
Entering the Chiplun railway tunnel

Before the Konkan Railway began operations, the ports of Mangalore and Mumbai were not directly connected by rail; passengers travelled on the Bengaluru-Belagavi-Pune route. During the mid-twentieth century, travellers to Mumbai from Mangaluru and adjacent areas went to Kadur or Birur by bus and caught a train to Mumbai (then named Bombay).

The railway was conveived by Nath Pai, a parliamentarian from Ratnagiri, assisted by national leaders such as Madhu Dandavate and George Fernandes (who hailed from Konkan). In 1966, a line was constructed between Diva in Mumbai and Panvel in Raigad district. During Dandavate's tenure in the Lok Sabha, it was extended to Roha in 1986 to serve area industries. During this time, Work on the Mangalore-Thokur line began at this time, without a link from Roha to Mangalore. In October 1984, the Ministry of Railways conducted an engineering and traffic survey for the 525-kilometre (326 mi) west-coastal portion from Surathkal to Madgaon. In March 1985, the ministry commissioned the Southern Railway to extend the survey's scope to include the western coastline from Madgaon to Roha.

The first phase of the Konkan Railway was the 62-kilometre (39 mi) section from Apta to Roha. It was cleared by the Planning Commission, and the project was included in the 1978-79 budget at an estimated cost of 11.19 billion. The length of the railway from Apta to Mangalore was estimated at 890 kilometres (550 mi), and its cost was estimated at 2.39 billion in 1976.[4] The engineering and traffic survey for the West Coast Railway Line from Apta to Mangalore was conducted from 1970 to 1972. The final survey for the Apta-Roha-Dasgaon section was made in 1974-75.[5]

Challenges

E. Sreedharan's team had to analyze what kind of terrain the line would cross. Although some surveys had been made, there was no data for the Maharashtra stretch (half the length of the line). With over 2,000 bridges and 91 tunnels to be built through mountainous terrain many rivers, it was the largest railway-engineering project on the Indian subcontinent at the time.[6] A major challenge was land acquisition from about 43,000 landowners. When Konkan Railway Corporation (KRCL) began asking people to surrender property which had belonged to them for generations, many (convinced of the project's importance) did so voluntarily. This enabled the process to be completed in one year.[7]

Terrain and the elements were challenging; flash floods, landslides and tunnel collapses affected work at many places on the project. Thickly-forested construction sites were often visited by wild animals. Work on the project continued, however, and decentralisation produced greater efficiency. The 740-kilometre (460 mi) stretch was divided into seven sectors of about 100 kilometres (62 mi)—Chiplun, Ratnagiri, Kudal, Madgaon, Karwar, Bhatkal and Udupi—each headed by a chief engineer.[8]

The route crosses three states (Maharashtra, Goa and Karnataka), each of which agreed to provide financing. The authorised share capital was increased in 1996-1997 from 6 billion to 8 billion, with the government of India taking a 51-percent share; the rest went to Maharashtra (22 percent), Karnataka (15 percent), Kerala (6 percent) and Goa (6 percent).

Contracts for the project were given to construction firms which included Larsen & Toubro had been given major part of project, Gammon India and Afcons. To speed up construction, piers for major bridges were cast on riverbanks itself and launched with pontoon-mounted cranes.[9] This was India's first use of incremental launch bridge-building.[10] Nine hydraulic tunnelling machines were imported from Sweden[6] to bore through the rock of the Sahayadris. The greatest challenge was presented by the nine tunnels bored through soft soil, which required a slow, manual process. Excavation was difficult due to saturated clay and high water table. Tunnels collapsed immediately several times, requiring the work to be redone.[11] Nineteen lives and four years were lost in the construction of the soft-soil tunnels alone,[6][11] and a total of seventy-four people died during the railway's construction.

Controversy

In Goa, which makes up 105 kilometres (65 mi) of the route, concerns were raised about the environmental and economic impact of the railway. According to opponents of the project, the coastal railway would destroy habitat, damage historical sites, and disrupt lives in the densely-populated state. In 1991, the Konkan Railway Re-Alignment Committee (KRRAC) organised protests against the proposed railway line.[12] The KRRAC's main points were that the proposal would flood coastal regions, destroy fertile land, harm the monuments of Old Goa, irreparably damage the marshes and mangrove swamps along the coast and the estuaries of the Mandovi and Zuari Rivers, and displace neighbourhoods along the coast. The committee proposed an alternative hinterland alignment passing through relatively-unpopulated regions, which would extend the line by about 25 kilometres (16 mi) but reduce environmental damage.[13]

The hinterland alignment was rejected by the Konkan Railway Corporation because it would substantially divert the line, deny rail access to Goa's population centers, and delay and increase the costs of construction. The KRRAC, which had become a political movement, filed public interest litigation in the Bombay High Court in March 1992 seeking an injunction on construction work and diversion of the line through the hinterland alignment. The high court dismissed the petition the following month, ruling that

... the claim of the petitioners that the alignment would have devastating and irreversible impact upon the khazan lands is without any foundation, and even otherwise, the extent of damage is extremely negligible and a public project of such a magnitude which is undertaken for meeting the aspirations of the people on the west coast cannot be defeated on such considerations. It is not open to frustrate the project of public importance to safeguard the interest of few persons. It cannot be overlooked that while examining the grievance about the adverse impact upon a small area of 30 hectares of Khazan lands, the benefit which will be derived by a large number of people by the construction of rail line cannot be brushed aside. The Courts are bound to take into consideration the comparative hardship which the people in the region will suffer by stalling the project of great public utility. The cost of the project escalates from day to day and, as pointed out by the Corporation, the extent of the interest and east which will be suffered by the Corporation every day is to the tune of Rs. 45 lakhs. No development is possible without some adverse effect on the ecology and environment ...[14]

Completion

Work progressed on the line. In March 1993, the southern 47-kilometre (29 mi) between Thokur and Udupi in Karnataka was placed into service, followed by the northern 47-kilometre (29 mi) section between Roha and Veer in Maharashtra in June of that year. The first passenger train on the route ran between Mangalore and Udupi on 20 March 1993. The service was extended by 51 kilometres (32 mi) from Veer to Khed in March 1995, and by a further 265 kilometres (165 mi) from Khed to Sawantwadi Road in December 1996. Southern service was extended by 32 kilometres (20 mi) from Udupi to Kundapur in January 1995, and by a further 275 kilometres (171 mi) to Pernem in Goa in August 1997.[15] Through service between Mumbai and Mangalore remained on hold due to a problematic tunnel at Pernem, which experienced repeated cave-ins and flooding.[16] The tunnel was finally completed in January 1998, six years after its construction began.[17][18] Through services on the line began after the inauguration of the full 740-kilometre (460 mi) stretch from Roha to Mangalore on 26 January 1998.[19] Passenger service on the full route, between Mumbai and Mangalore, began in May 1998.[20]

Station platform, with people waiting for a train
Karwar railway station

Route

Train at an open-air station, viewed from above
Mookambika Road Byndoor railway station

The route from Roha to Veer is double track. The rest of the route to Thokur is a single track, which is being electrified. The total route length is about 738 kilometres (459 mi). Although it has been designed for high-speed traffic of 160 kilometres per hour (99 mph), the fastest train on the route—the Trivandrum Rajdhani Express, which used to run at a maximum speed of 140 kilometres per hour (87 mph)—runs at a maximum speed of 110 kilometres per hour (68 mph). The route is open to freight and passenger traffic and runs parallel to the Arabian Sea, offering views along the coast. There are fifty-six stations on the line.

Upgrades

According to a study by the railway, track doubling is possible on about 300 km (186 mi) which runs on the plains. Several stretches on the 738-kilometre (459 mi) line can be converted to double track, such as the 47-kilometre (29 mi) line from Roha to Veer. The 60-kilometre (37 mi) stretch between Udupi and Mangalore is another candidate.[21]

On 3 November 2015, Konkan Railway senior official Bhanu P. Tayal announced to the press that track-doubling and electrification would begin on 8 November 8 in Kolad. Life Insurance Corporation offered a favourable 2.5 billion loan, and other funding would be available. The project, expected to cost 100 billion, was scheduled for completion by 2020. [22]

In October 2018, the railway announced that the 46-kilometre (29 mi) stretch between Roha and Veer would have two tracks by December 2019.[23] Electrification is in progress at an estimated cost of ₹8 billion,[24][25] and is scheduled for completion by February 2020. The railway was scheduled to have new stations at Indapur, Goregoan Road, Sape Wamane, Kalbani, Kadwai, Verawali, Kharepatan, Achirne, Mirjan and Innanje by December 2019.[23]

Operations

The 738.941-kilometre (459.157 mi) railway has a total track length of 918.515 kilometres (570.739 mi). Its length through Maharashtra is 381.181 kilometres (236.855 mi), through Karnataka 251.76 kilometres (156.44 mi), and 106 kilometres (66 mi) through Goa.

Passenger

The route was popular with passengers due to its connectivity with regions hitherto inaccessible by rail and the substantial time savings for travellers between western and southern India. Several trains which had taken circuitous routes ran on the Konkan Railway, reducing running time. The first of these was the Mumbai-Mangalore Netravati Express (later extended to Trivandrum), which was diverted to the Konkan Railway on 1 March 1998; this was followed by the Thiruvananthapuram Rajdhani Express on 1 April of that year.[26] The Matsyagandha Express, running from Lokmanya Tilak Terminus to Mangalore, began service on 1 May 1998.[20] The Hazrat Nizamuddin-Mangalore Mangala Lakshadweep Express was diverted to the route and extended to Ernakulam Junction on 1 August 1998.[27] The Pune-Ernakulam Junction Express was introduced on 25 February 1999.[28] The Marusagar Express, which runs between Jaipur and Ernakulam Junction and was extended to Ajmer via the Konkan Railway, began service on 12 October 2001.[29] The Jan Shatabdi Express was flagged off between Mumbai and Madgaon (the longest-running Jan Shatabdi) on 16 April 2002 to commemorate Indian Railways' 150th anniversary.[30][31] On 1 February 2008, a Garib Rath Express between the Kochuveli railway station in Thiruvananthapuram and Lokmanya Tilak Terminus began service.[32]

The Tejas Express is the first semi-high-speed, fully air-conditioned train fleet introduced by Indian Railways, with modern on-board facilities. Its inaugural run was on 24 May 2017 from Mumbai's Chhatrapati Shivaji Terminus to Karmali railway station in Goa. It covered 552 km (342 mi) in eight hours and 30 minutes.[33]

Freight

See caption
A RORO train at the Sawantwadi Road railway station
A train entering a tunnel
Ends of tunnels are chain-locked to prevent landslides and falling rocks.

Freight response to the railway was lukewarm, prompting its corporation to consider reducing its rates.[34] With an outstanding debt of 33.75 billion, the KRCL was counting on freight traffic for revenue.[35] To attract freight traffic, the corporation began advertising to industries on the route.[36]

The corporation introduced roll-on/roll-off (RORO) service, a road-rail system, on the section between Kolad (Maharashtra) and Verna, Goa in 1999;[37] it was extended to the Surathkal railway station in Karnataka in 2004.[38][39] The RORO service, the first of its kind in India, allowed trucks to be transported on flatcars. It has been popular,[2] carrying about 1.6 million trucks and earning over 1.2 billion by 2009.[40]

Safety

The terrain and weather of the Konkan region have caused problems for the railway. During the 1998 monsoon, torrential rains triggered landslides which washed away tracks and disrupted service.[41] Despite the corporation's efforts to address the problems through engineering (such as protective netting along cuttings to prevent boulders from rolling onto the tracks), the problems recurred each year.[42][43]

The line's first major accident occurred on the night of 22 June 2003, when a landslide derailed a Karwar–Mumbai express train at the entrance to a tunnel. Fifty-one people died as a result of the accident, and others were injured. As a result, the corporation was severely criticised for failing to take adequate safety measures in the landslide-prone region.[44] An inquiry reported that the cause of the accident was the failure of a cutting due to the lack of monsoon patrolling.[45] The findings were disputed by the corporation, which said that the lack of monsoon patrolling did not lead to the accident (which was due to forces of nature).[45] Shortly after the accident, however, the corporation announced that it would enhance safety measures on the route.[46][47]

Barely a year later, the measures were found inadequate when a second major accident occurred on 16 June 2004. A Mangalore–Mumbai Matsyaganda Express derailed and fell off a bridge after striking boulders on the tracks, killing 20 people.[48][49] Again, the corporation insisted that the accident was due to forces of nature.[50][51] Questions were then raised about the safety and reliability of the Konkan Railway.[52][53] An inquiry by the Commissioner of Railway Safety ruled that the accident was caused by the "falling of boulders and earth" on the tracks.[54] After the report was issued, the corporation implemented its recommendations. These included reducing train speeds during the monsoon to 75 km/h (47 mph) from 120 km/h (75 mph) and engineering measures such as boulder netting, shotcreting, rock bolting, micropiling and vetiver plantations along the line to improve safety.[55][56]

See also

References

  1. ^ "Archived copy". Archived from the original on 1 November 2012. Retrieved 2 December 2012.{{cite web}}: CS1 maint: archived copy as title (link)
  2. ^ a b S. Vydhianathan. "Convergence on the Konkan Railway". Online edition of The Hindu, dated 2003-14-11. Archived from the original on 27 June 2006. Retrieved 22 December 2008.
  3. ^ Dinesh Jangid (18 August 2018). "KRCL Recruitment 2018 – Apply Online 100 Trackman Pointsman Posts". Retrieved 18 December 2019.
  4. ^ https://eparlib.nic.in/bitstream/123456789/3086/1/lsd_07_01_01-02-1980.pdf Page no. 39
  5. ^ https://eparlib.nic.in/bitstream/123456789/3269/1/lsd_07_02_19-03-1980.pdf#search=null%20[1980%20TO%201989] Page 31
  6. ^ a b c Karlis Goppers. "Swedish Contribution to the Konkan Railway Construction Project in India". Official webpage of SIDA. Archived from the original on 17 December 2008. Retrieved 4 December 2008.
  7. ^ "LAND ACQUISITION" (PDF). Official webpage of the Konkan Railway Corporation. Archived from the original (PDF) on 4 March 2009. Retrieved 4 December 2008.
  8. ^ "Construction" (PDF). Official webpage of the Konkan Railway Corporation. Archived from the original (PDF) on 10 October 2008. Retrieved 4 December 2008.
  9. ^ "Railway Bridges Across Zuari and Mandovi Rivers, Goa" (PDF). Official webpage of AFCONS. Archived from the original (PDF) on 4 March 2009. Retrieved 4 December 2008.
  10. ^ "Bridges:Panval Nadi Viaduct". Official webpage of SPA Consultants. Archived from the original on 22 February 2008. Retrieved 4 December 2008.
  11. ^ a b "TRIBUNE : ITA Newsletter, dated June 2008" (PDF). Official webpage of ITA-AITES. Archived from the original (PDF) on 4 March 2009. Retrieved 12 April 2008.
  12. ^ G. Raghuram. "Konkan Railway Corporation:Choice of Alignment in Goa" (PDF). Vikalpa. Archived from the original (PDF) on 4 March 2009. Retrieved 4 December 2008.
  13. ^ Indranil Banerjie. "ON THE WRONG TRACK" (PDF). Online edition of Sunday magazine, March 29 - April 4, 1992. Retrieved 23 April 2009.[permanent dead link]
  14. ^ Goa Foundation v. Konkan Railway Corporation, AIR 1992 Bom. 571.
  15. ^ "Paswan for quality coaches". Online edition of the Indian Express, dated 1997-08-26. Retrieved 4 December 2008.[permanent dead link]
  16. ^ G.R. Singbal. "Jinxed Goan sector derails Konkan dream". Online edition of the Indian Express, dated 1997-07-31. Retrieved 4 December 2008.[permanent dead link]
  17. ^ Ian J. Kerr. "Engines of Change". Google Books Preview. Retrieved 4 December 2008.
  18. ^ "Konkan Railway ready to roll, at last". Online edition of the Indian Express, dated 1998-01-16. Retrieved 4 December 2008.[permanent dead link]
  19. ^ Sandeep K.M. "Vajpayee dedicates Konkan Rly to the nation". Online edition of the Indian Express, dated 1998-01-27. Archived from the original on 26 June 2018. Retrieved 4 December 2008.
  20. ^ a b "Naik flags off 'nameless' train". Online edition of the Indian Express, dated 1998-05-31. Archived from the original on 5 January 2013. Retrieved 4 December 2008.
  21. ^ "dna exclusive: Konkan Railway plans second line in plains". dna.
  22. ^ "Times of India: Konkan railway to begin work on doubling tracks from November 8". Online edition of the Times Of India, dated 2015-11-04.
  23. ^ a b "Konkan Railway network to get 10 new stations by Dec 2019".
  24. ^ "Archived copy". Archived from the original on 4 January 2019. Retrieved 3 January 2019.{{cite web}}: CS1 maint: archived copy as title (link)
  25. ^ "Konkan Railways: Electrification by 2020".
  26. ^ "Mumbai Beat : Konkan Rly commissioned". Online edition of the Indian Express, dated 1998-01-26. Archived from the original on 5 January 2013. Retrieved 18 April 2009.
  27. ^ "Mumbai Notes:Mangla Express on Konkan route". Online edition of the Indian Express, dated 1998-07-21. Retrieved 10 December 2008.[permanent dead link]
  28. ^ "At last, direct from Pune to God's own country". Online edition of the Indian Express, dated 1998-02-26. Retrieved 10 December 2008.[permanent dead link]
  29. ^ "Jaipur-Ernakulam train begins maiden journey". Online edition of the Times of India, dated 2001-10-08. 8 October 2001. Retrieved 18 December 2008.
  30. ^ Tripti Nath. "First Jan Shatabdi flagged off". Online edition of the Tribune, dated 2002-04-17. Retrieved 17 December 2008.
  31. ^ "JAN SHATABDI TRAINS - NEW DEFINITION OF PASSENGER COMFORTS IN THE 150TH YEAR". Press release, Press Information Bureau, dated 2002-04-12. Retrieved 13 April 2009.
  32. ^ "Garib Rath brings Mumbai closer". Online edition of The Hindu, dated 2008-02-02. Chennai, India. 2 February 2008. Retrieved 13 April 2009.
  33. ^ "Mumbai-Goa route gets Railways' premium train Tejas". dna. 30 September 2016. Retrieved 15 October 2016.
  34. ^ Sandeep K.M. "Konkan Rly asks Board to reduce "distance inflation"". Online edition of the Indian Express, dated 1998-09-06. Retrieved 18 December 2008.[permanent dead link]
  35. ^ "KRC in dire straits over bridging debt gap". Online edition of the Indian Express, dated 1998-02-20. Retrieved 18 December 2008.[permanent dead link]
  36. ^ Sandeep K.M. "Industry slow in responding to KRC". Online edition of the Indian Express, dated 1999-01-30. Retrieved 18 December 2008.[permanent dead link]
  37. ^ "ROAD-RAIL SYNERGY SYSTEM". Press release, Press Information Bureau, dated 2004-20-05. Retrieved 22 December 2008.
  38. ^ "New Konkan Rly service begins". Online edition of the Business Standard, dated 2004-06-16. Retrieved 22 December 2008.
  39. ^ "RORO service again on Konkan Railway". Online edition of The Hindu Business Line, dated 2004-06-11. Retrieved 22 December 2008.
  40. ^ "KONKAN RAILWAY EARNS OVER 120 Cr FROM RO-RO SERVICE" (PDF). Official webpage of the Konkan Railway Corporation. Retrieved 8 June 2009.[permanent dead link]
  41. ^ "Konkan trains back to normal". Online edition of the Indian Express, dated 1998-07-14. Retrieved 6 January 2009.[permanent dead link]
  42. ^ "Landslides and boulders block Konkan Rly's path". Online edition of the Indian Express, dated 1999-07-19. Retrieved 6 January 2009.[permanent dead link]
  43. ^ "Konkan Railway suspends operations due to landslips". Online edition of the Pioneer, dated 2000-07-13. Retrieved 6 January 2009.
  44. ^ "Konkan Railway Mishap : No Anti-Collision Device fitted". Goanet. Archived from the original on 9 July 2012. Retrieved 6 January 2008.
  45. ^ a b "Report of Commissioner of Railway Safety". Official webpage of the Commissioner of Railway Safety. Archived from the original on 10 April 2009. Retrieved 1 June 2009.
  46. ^ "Konkan Railway to run inspection locomotives". Online edition of The Hindu. 26 June 2003. Archived from the original on 25 January 2013. Retrieved 6 January 2009.
  47. ^ "Geological Challenges & New Solutions by Konkan Rly". Official webpage of Konkan Railway Corporation. Archived from the original on 19 January 2008. Retrieved 6 January 2009.
  48. ^ "Rail crash due to 'natural cause'". BBC News, dated 2004-06-17. 17 June 2004. Retrieved 6 January 2009.
  49. ^ Chandrima S. Bhattacharya (17 June 2004). "Showpiece to death train: by boulders". Online edition of the Tribune, dated 2004-06-17. Retrieved 6 January 2009.
  50. ^ "Nature's fury caused derailment: Konkan Railway". Online edition of The Hindu, dated 2004-06-17. Chennai, India. 17 June 2004. Retrieved 6 January 2009.
  51. ^ Stanly Pinto (16 June 2004). "Mother Nature plays the spoiltsport". Online edition of the Times of India, dated 2004-06-16. Retrieved 6 January 2009.
  52. ^ Bisheshwar Mishra (17 June 2004). "Technical fault or just boulders? Probe on". Online edition of the Times of India, dated 2004-06-17. Retrieved 6 January 2009.
  53. ^ "How Safe Is Railways' Safety Measures?". Online edition of the Financial Express, dated 2004-06-17. Retrieved 6 January 2009.
  54. ^ "Report of Commissioner of Railway Safety". Official webpage of the Commissioner of Railway Safety. Archived from the original on 10 April 2009. Retrieved 6 January 2009.
  55. ^ "Konkan Railway gears up for the monsoon" (PDF). Official webpage of the Konkan Railway Corporation. Archived from the original (PDF) on 2 February 2010. Retrieved 13 April 2009.
  56. ^ "Geotech safety works" (PDF). Official webpage of the Konkan Railway Corporation. Retrieved 13 April 2009.[permanent dead link]


Template:Indianrailwayzones-numbered