List of high-speed railway lines
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
|
This article provides a list of operated high-speed rail networks, listed by country or region.
The International Union of Railways defines high-speed rail as public transport by rail at speeds of at least 200 km/h (124 mph) for upgraded tracks and 250 km/h (155 mph) or faster for new tracks.[1][2]
Overview
The following table is an overview of high speed rail in service or under construction by country, ranked by the amount in service. It shows all high speed lines (speed of 200 km/h (120 mph) or over) in service. The list is based on UIC figures (International Union of Railways),[3][4] updated with other sources.[5]
Rank | Country/Region | Continent | In operation (km) |
Under construction (km) |
Total (km) |
Network density (m/km2) |
Length per 100,000 people (km) |
Max. speed (km/h) |
Electrification | Track gauge (mm) |
Notes |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | China | Asia | 35,000 | 7,207[6] | 38,207 | 3.36 | 2.3 | 350[7][8] | 25 kV 50 Hz | 1435 | Shanghai Maglev: 430 km/h max;[9] exclude 26 km of the Guangzhou–Shenzhen–Hong Kong Express Rail Link Hong Kong section; 38875 km including approved (70000 km in long-term[10]). The only country in the world to provide overnight sleeping high-speed trains at 250 km/h |
2 | Spain | Europe | 3,410 | 2,110 | 5,525[11] | 6.74 | 7.1 | 310 | 25 kV 50 Hz | 1435[12] | |
3 | Germany | Europe | 1,571[13] | 1,051.889 | 4,692.889 | 10.2 | 4.7 | 300 | 15 kV 16.7 Hz | 1435 | dedicated of partially upgraded (NBS) |
2,070 | 250 | upgraded (ABS) | |||||||||
4 | France | Europe | 2,734 | 341.3 | 3,802.1 | 6.1 | 5.0 | 320[14] | 25 kV 50 Hz | 1435 | dedicated (LGV) |
726.8 | 220 | 1.5 kV DC, 25 kV 50 Hz AC |
upgraded | ||||||||
5 | Japan | Asia | 2,764.6[15] | 657.1 | 3,421.7[16] | 9 | 2.19 | 320[17] | 25 kV 50 Hz, 25 kV 60 Hz |
1435[18] | The first network ever opened; 6411.7 km including approved |
6 | Sweden | Europe | 1,706[19] | 349.1 | 2,055.1 | 3.79 | 16.7 | 205[20] | 15 kV 16.7 Hz | 1435 | Only upgraded lines |
7 | United Kingdom | Europe | 1,527 | 230 | 1,757 | 6.29 | 2.19 | 300[21] | 25 kV 50 Hz | 1435 | Including upgraded lines |
8 | Italy | Europe | 1,467[22] | 890.96 | 2,357.96 | 4.87 | 2.5 | 300 | 3 kV DC, 25 kV 50 Hz AC |
1435 | After its neighbour country France ended parcel service, Italy became the only country to provide freight services at high-speed track |
9 | Turkey | Asia | 621 | 902 | 2175 | 0.79 | 0.75 | 300 | 25 kV 50 Hz | 1435 | dedicated |
0 | 652 | 200 | upgraded | ||||||||
10 | South Korea | Asia | 1,104.5 | 425 | 1,529.5 | 11.03 | 2.15 | 305[23] | 25 kV 60 Hz | 1435 | Including upgraded lines; |
11 | Finland | Europe | 1,079.4 | 95 | 1,174.4 | 3.19 | 20.2 | 220[24] | 25 kV 50 Hz | 1524[25] | Only upgraded lines; including Espoo–Salo line under construction |
12 | Russia | Europe | 845 | 0 | 845[26] | 0.04 | 0.58 | 250[27] | 3 kV DC | 1520 | Only upgraded lines; total 4595 km to be under construction no later than 2024 |
13 | Uzbekistan | Asia | 741 | 0 | 741 | 1.34 | 1.8 | 250 | 25 kV 50 Hz | 1520 | Including upgraded lines |
14 | Greece | Europe | 700 | 0 | 700 | 5.3 | 6.5 | 200[28] | 25 kV 50 Hz | 1435 | Only upgraded lines; full operation since 2019[29] |
15 | Portugal | Europe | 624 | 0 | 624 | 6.77 | 6.06 | 220 | 25 kV 50 Hz | 1668 | Only upgraded lines |
16 | Saudi Arabia | Asia | 453 | 2,354 | 2,807 | 0.21 | 1.37 | 300 | 25 kV 50 Hz | 1435 | Opened in September 2018 |
17 | United States | America | 735 | 1,789.3 | 2,151.3 | 0.03 | 0.13 | 240 [30][31] |
12 kV 25 Hz, 12 kV 60 Hz, 25 kV 60 Hz |
1435 | Only upgraded lines |
18 | Belgium | Europe | 354.8 | 147.9 | 502.7 | 8.98 | 3.4 | 300 | 3 kV DC, 25 kV 50 Hz AC |
1435 | Including upgraded lines |
19 | Austria | Europe | 352 | 298 | 650 | 4.2 | 3.97 | 250 | 15 kV 16.7 Hz | 1435 | Including upgraded lines |
20 | Taiwan | Asia | 348 | 0 | 348 | 9.37 | 1.46 | 315 | 25 kV 60 Hz | 1435 | |
21 | Poland | Europe | 272.2 | 492.457 | 764.657 | 0.87 | 0.70 | 200 | 3 kV DC | 1435 | Only upgraded lines; 484 km extra approved |
22 | Morocco | Africa | 186[32] | 137 | 323[33] | 0.28 | 0.5 | 320 | 25 kV 50 Hz | 1435 | Inaugurated in November 2018 |
23 | Netherlands | Europe | 175 | 116.8 | 291.8 | 4.18 | 1 | 300[34] | 1.5 kV DC, 25 kV 50 Hz AC |
1435 | Hanzelijn is expected to start high-speed services |
24 | Switzerland | Europe | 147.7 | 377.49 | 525.19 | 3.58 | 1.81 | 250 | 15 kV 16.7 Hz | 1435 | |
25 | Norway | Europe | 103.5 | 445.55 | 549.05 | 0.32 | 1.94 | 210 | 15 kV 16.7 Hz | 1435 | Only upgraded lines |
26 | Denmark | Europe | 65 | 364.9 | 429.9 | 1.51 | 1.1 | 250 | 25 kV 50 Hz | 1435 | 711.8 km including approved |
27 | Hong Kong | Asia | 26 | 0 | 26 | 23.47 | 0.3 | 200 | 25 kV 50 Hz | 1435 |
By region
Rank | Country/Region | Continent | In operation (km) |
Under construction (km) |
Total country (km) |
Network density (m/km2) |
Max. speed (km/h) |
Electrification | Track gauge (mm) |
Notes |
---|---|---|---|---|---|---|---|---|---|---|
1 | Asia (total) | Asia | 38,679.7 | 17,277.8 | 55,957.5 | 0.87 | 350[7] | different | 1435; 1520 | 117,325 km in long-term |
2 | Europe (including non-EU states) | Europe | 19,824.9 | 10,152.4 | 29,977.3 | 1.95 | 320 | different | 1435; 1520; 1668 | Excluding Turkey since it is listed in Asia section (because only small part of it is in the West to Bosphorus); 46,831.2 km including approved; 18,739.7 km in the EU |
3 | United States | America | 735 | 1,789.3 | 2151.3 | 0.04 | 240[30][31] | 12 kV 25 Hz, 12 kV 60 Hz, 25 kV 60 Hz |
1435 | Only upgraded lines. Planned or under construction lines do not include core city hub and are developing independently (unlike other countries do); 4,023.3 km including approved |
4 | North Africa | Africa | 186 | 1,037 | 1,223 | 0.02 | 320 | 25 kV 50 Hz | 1435 | Morocco and Egypt; 2,400 km including approved |
5 | Australia | Oceania | 0 | 1,098 | 1,098[35] | 0.14 | 200 | 25 kV 50 Hz | 1435 | Upgrading |
High-speed networks under construction
Rank | Country/Region | Continent | Under construction (km)[36] |
Total (km) (including approved) |
Network density (m/km2) |
Max. speed (km/h) |
Length per 100,000 people (km) | Electrification | Track gauge (mm) |
Notes |
---|---|---|---|---|---|---|---|---|---|---|
1 | Kuwait; Bahrain; Qatar; UAE; Oman | Asia | 1,544 | 1,544 | 6.06 | 220 | 6.8 | No | 1435 | Excludes Saudi Arabia listed at "In operation" |
2 | Australia | Oceania | 1,098[35] | 1,740 | 0.2 | 350 | 6.9 | 25 kV 50 Hz | 1435 | |
3 | Iran | Asia | 926[37] | 1,336 | 0.81 | 300 | 1.7 | 25 kV 50 Hz | 1435 | Of which 410 km is under EIS |
4 | Estonia Latvia Lithuania | Europe | 870 | 1,050.8 | 6 | 249 | 17.6 | 25 kV 50 Hz | 1435 | All sections to be under construction after 2019–2020, Latvian section faces with delay |
5 | Thailand | Asia | 721 | 2,566 | 5 | 300+ | 3.7 | 25 kV 50 Hz | 1435 | |
6 | Romania | Europe | 657 | 1,568 | 6.58 | 250 | 10.1 | 25 kV 50 Hz | 1435 | |
7 | Egypt[38] | Africa | 543[39] | 543 | 0.54 | 250 | 0.57 | 25 kV 50 Hz | 1435 | |
8 | India | Asia | 508 | 15,663 | 4.76 | 320 | 1.1 | 25 kV 50 Hz | 1435; 1676 | |
9 | Hungary | Europe | 392 | 392 | 4.21 | 200 | 4 | 25 kV 50 Hz | 1435 | |
10 | Malaysia; Singapore | Asia | 350 | 350 | 1.06 | 350 | 0.9 | 25 kV 50 Hz | 1435 | |
11 | Ireland | Europe | 266 | 376 | 3.15 | 225 | 4.1 | No (until 2030) | 1600 | |
12 | Bangladesh | Asia | 230 | 230 | 1.56 | 200 | 0.14 | 25 kV 50 Hz | 1435 | |
13 | Serbia | Europe | 184 | 184 | 2.08 | 200 | 2.6 | 25 kV 50 Hz | 1435 | |
14 | Bulgaria | Europe | 150 | 150 | 1.35 | 200 | 2.1 | 25 kV 50 Hz | 1435 | |
15 | Czech Republic | Europe | 143.54 | 660 | 8.37 | 200 | 6.2 | 3 kV DC 25 kV 50 Hz |
1435 | |
16 | Indonesia | Asia | 142.3 | 142.3 | 0.07 | 300 | 0.05 | 25 kV 50 Hz | 1435 | Exclude slower 600 km of phase 2 |
17 | Slovenia | Europe | 133 | 133 | 6.56 | 200 | 6.65 | 25 kV 50 Hz | 1435 | Upgrading approved |
18 | Kazakhstan | Asia | 0 | 1,011 | 0.37 | 350 | 5.5 | 25 kV 50 Hz | 1520 | |
19 | Belarus | Europe | 0 | 610 | 2.94 | 350 | 3.9 | 25 kV 50 Hz | 1435 | Insisted |
20 | Ukraine | Europe | 0 | 300+ | 0.5 | 350 | 0.7 | 25 kV 50 Hz | 1435 | |
21 | Croatia | Europe | 0 | 269 | 4.75 | 250 | 6.725 | 25 kV 50 Hz | 1435 | Suspended |
22 | Mexico | North America | 0 | 210 | 0.11 | 300 | 1.2 | 25 kV 50 Hz | 1435 | Suspended |
23 | Canada | North America | 0 | 65 | 0.01 | 400 | 0.17 | 25 kV 50 Hz | 1435 | Part of 500+ km Pacific Northwest Corridor under EIS phase in 2019 |
24 | Iceland | Europe | 0 | 49 | 0.48 | 250 | 13.7 | 25 kV 50 Hz | 1435 |
Austria
Upgraded lines
Line | Speed | Length | Construction began | Service started |
---|---|---|---|---|
Western Railway | 250 km/h | 312.2 km | Unknown | December 9, 2012 (Vienna–St. Pölten) |
Brenner Base Tunnel | 250 km/h | 56 km | Summer 2006 | 2028 (claimed) |
New Lower Inn Valley railway | 250 km/h | 40.236 km | Unknown | December 9, 2012 |
New Lower Inn Valley railway (extension) | 250 km/h | 90 km | Unknown | 2030 (planned) |
Koralm Railway | 250 km/h | 125 km | 2001 | 2023 |
Semmering Base Tunnel | 230 km/h | 27.3 km | 2012 | December 2024 |
Baltic States (Estonia, Latvia, Lithuania)
Dedicated high-speed line
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Rail Baltica | Tallinn–Riga–Kaunas and Riga Airport branch diverging from main line | 250 km/h (160 mph) | Construction 2019–2023; test operation 2023–2026; to be in full service from 2026 | 870 km (540 mi) |
Kaunas–Joniškis–Riga | 200 km/h | 2026+ | 250 km (160 mi) | |
Helsinki–Tallinn | Not decided | 2024[40] | 103 km (64 mi) | |
Moscow-Riga High-speed Railway | Moscow–Riga | 300 km/h | Postponed due to Baltic States 2008–2010 crisis | 850 km (530 mi) |
Tallinn-Tartu-Riga High-speed Railway | Tallinn–Riga (via Tartu) | 200+ km/h | Proposed in 2019; existing railway can be uprageded no earlier than 2023 when ETCS level 3 installation will be finished at Tallinn–Tapa railway | 450 km (280 mi) |
Exits to Russian, Polish and Finnish high-speed railways are under planning.
Belgium
Dedicated high-speed line
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
HSL 1 | LGV Nord–Bruxelles-Sud | 300 km/h (190 mph) | December 14, 1997 | 88 km (55 mi) |
HSL 2 | Bruxelles-Nord–Liège-Guillemins | 300 km/h (190 mph) | December 15, 2002 | 95 km (59 mi) |
HSL 3 | Liège-Guillemins–Cologne-Aachen | 260 km/h (160 mph) | June 14, 2009 | 56 km (35 mi) |
HSL 4 | Antwerpen-Centraal–HSL Zuid | 300 km/h (190 mph) | 2009 | 87 km (54 mi) |
Line 25N | Schaarbeek–Mechelen | 160 km/h (99 mph) (now) 220 km/h (140 mph) (soon) |
2019–2020 | 20 km (12 mi) |
Line 50A | Brussels-South railway station–Ostend | 160 km/h (99 mph) (now) 200 km/h (120 mph) (soon) |
2020+ (upgrading) | 114.3 km (71.0 mi) |
Line 36N | Brussels-North railway station–Leuven | 200 km/h (120 mph) (after 2012) | 2003–2006 | 28.8 km (17.9 mi) |
Line 96N | Brussels-South railway station–Halle | 160 km/h (99 mph) (now) 200 km/h (120 mph) (soon) |
2020+ | 13.6 km (8.5 mi) |
China
Quick overview
Network name | Length | Maximum speed | Opening | Notifications |
---|---|---|---|---|
Country total | 32,200 km (20,000 mi) (38,207 km with under construction) | 350 km/h (220 mph) | 2005–present | |
4+4 National Grid | unknown | 350 km/h (220 mph) | 2005–2020 | Original plan |
8+8 National Grid | unknown | 350 km/h (220 mph) | 2016–2025 | Extended plan |
2015 plan | 45,000 km (28,000 mi) | 350 km/h (220 mph) | 2015-2020 | Partially completed |
2020 plan | 70,000 km (43,000 mi) | 350 km/h (220 mph) | 2020-2035 | [41] |
Regional Railways | 1,611 km (1,001 mi) (4130 km with under construction) | 350 km/h (220 mph) | 2008–2020 | |
Intercity Railways | 7,210 km (4,480 mi) (7846 km with under construction) | 350 km/h (220 mph) | 2008–2020 | Built to expand almost few communter services existed before |
Class 1 Railways | 5,056.9 km (3,142.2 mi) | 250 km/h (160 mph) | 2012–2019 | Slower service than intercity, but still high-speed |
Shanghai Maglev | 30.5 km (19.0 mi) | 431 km/h (268 mph) | 2004 | The fastest commercial service in the world |
Hong Kong Rail Link | 26 km (16 mi) | 200 km/h (120 mph) | 2018-09-23 | With several mainland destinations |
Taiwan Strait Tunnel Project | 150 km (93 mi) | 250 km/h (160 mph) | planned (EIS completed in 2019) | between Mainland China and Taiwan |
Bohai Strait tunnel | 123 km (76 mi) | 250 km/h (160 mph) | planned | between Dalian and Yantai |
Czech Republic
Line name | Length | Maximum speed | Opening |
---|---|---|---|
Ejpovický tunel | 4.15 km (2.58 mi) | 160 km/h (99 mph) (now) 200 km/h (120 mph) (soon) |
2018 |
Denmark
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Øresund Line | Peberholm–Oresund Bridge | 200 km/h (120 mph) | July 1, 2000 | 5 km (3.1 mi) |
Copenhagen–Ringsted Line | Copenhagen–Ringsted | 250 km/h (160 mph) | May 31, 2019 | 60 km (37 mi) |
Ringsted-Fehmarn Line | Ringsted–Fehmarn | 200 km/h (120 mph) (prepared for 250 km/h (160 mph)) | 2021 | 115 km (71 mi) |
Ringsted-Odense Line | Ringsted–Odense | 200 km/h (120 mph) | 2028 (likely to be postponed) | 96 km (60 mi) |
Randers–Aalborg line | Randers–Aalborg | 180 km/h (110 mph) (upgradable to 200 km/h) | 2028+ | 80.7 km (50.1 mi) |
Aarhus–Randers line | Aarhus–Randers | 160 km/h (99 mph) (upgradable to 200 km/h) | 2028+ | 59.2 km (36.8 mi) |
Esbjerg-Lunderskov-Flensburg | Esbjerg–Flensburg | 180 km/h (110 mph) (upgradable to 200 km/h) | before 2030 | 135.9 km (84.4 mi) |
Middelfart-Odense new line | Aarhus–Odense | 250 km/h (160 mph) | 2028+ | 145 km (90 mi) |
Fehmarn Belt Fixed Link | 200 km/h (120 mph) | planned (construction 2020–2028) | 18 km (11 mi) |
Finland
New main lines
Line name | Start and end points | Maximum speed | Opening or opened | Length |
---|---|---|---|---|
Lahti Main Line | Kerava–Lahti | 220 km/h (140 mph) | September 3, 2006 | 75.7 km (47.0 mi) |
Espoo–Salo Railway | Espoo–Salo | 300 km/h (190 mph) | 2031 (planned) | 95 km (59 mi) |
Helsinki-Tampere High Speed Railway (partially using Lentorata) | Helsinki–Tampere | 300 km/h (190 mph) | 2027+ (approved in 2019) | 100 km (62 mi) |
Lentorata | Helsinki–Vantaa Airport | 220 km/h (140 mph) | 2027+ (approved in 2019) | 30 km (19 mi) |
Helsinki–Porvoo–Kouvola (partially using Lentorata) | Vantaa–Porvoo–Kouvola | 300 km/h (190 mph) | 2027+ (approved in 2019) | 126 km (78 mi) |
Arctic Railway | Rovaniemi–Kirkenes | 250 km/h (160 mph) | 2030+ | 526 km (327 mi) |
Upgraded lines
Line name | Start and end points | Maximum speed | Upgrade | Opening | Length |
---|---|---|---|---|---|
Finnish Coastal Railway | Helsinki–Turku | 200 km/h (120 mph) | 1995 | 1902 | approximately 50 km (31 mi) (high speed section); 195.8 km (total) |
Helsinki–Riihimäki Railway | Helsinki–Riihimäki | 200 km/h (120 mph) | 1995 | 1862 | 71.4 km (44.4 mi) |
Lahti–Kouvola Railway | Lahti–Kouvola | 200 km/h (120 mph) | 1995 | 1870 | 61.4 km |
Main line to Petersburg | Kouvola–Russian border | 200 km/h (120 mph) | 2013 | 1870 | 55 km (upgraded section) |
Karelian Railway | Kouvola–Joensuu | 200 km/h (120 mph) | 1995 | 1894 | 112.3 km (69.8 mi) (high-speed section); 325,8 km (total) |
Savo Railway | Kouvola–Iisalmi | 200 km/h (120 mph) | 1995 | 1902 | 42.8 km (26.6 mi) (high-speed section); 357,8 km (total) |
Riihimäki–Tampere Railway | Riihimäki–Tampere | 200 km/h (120 mph) | 1995 | 1862–1876 | 116 km (72 mi) |
Seinäjoki–Oulu Railway (Seinäjoki–Kokkola section) | Seinäjoki–Kokkola | 200 km/h (120 mph) | 2010–2013 | 1886 | 134 km (83 mi) |
Seinäjoki–Oulu Railway (Kokkola-Oulu section) | Kokkola–Oulu | 200 km/h (120 mph) | 2010–2017 | 1886 | 200.8 km (124.8 mi) |
Tampere–Seinäjoki Railway | Tampere–Seinäjoki | 200 km/h (120 mph) | 1995 | 1880 | 160 km (99 mi) |
France
Dedicated high-speed lines
French figures of LGV length count only new tracks and not total length between terminal stations (i.e.: 409 km instead of 425 km for the LGV Sud-Est)
Dedicated high-speed line approved
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
LGV Lyon–Turin 1st part | Saint-Jean-de-Maurienne–border (on cross-border section) | Construction[44] (220 km/h ready) | 2030 (expected) | 45 km (in France) |
LGV Lyon–Turin 2nd part | Lyon–Saint-Jean-de-Maurienne (with 18.8 km upgraded) | Approved[45] (220 km/h ready). | After 2030 (expected) | 130 km |
Total | 175 km |
Upgraded lines
Line name | Start and end points | Maximum speed | Upgrade | Opening | Length |
---|---|---|---|---|---|
(Paris–) Étampes–Orléans–Vierzon | Étampes–Vierzon | 200 km/h | 1967 | 1847 | 143 km[46] |
(Paris–) Étampes–Orléans–Bordeaux | Étampes–Bordeaux | 220 km/h | 1971 | 1861 | 380.4 km[46] |
(Paris–) Connerré–Brest | Connerré–Brest | 220 km/h | 1990 | 1865 | 29.3 km[46] |
Le Mans–Nantes | Le Mans–Gare de Nantes | 220 km/h | 1990 | 1863 | 117.4 km[46] |
Strasbourg–Mulhouse | Strasbourg–Mulhouse | 220 km/h | 1995 | 1844 | 123.1 km[46] |
Dijon-Ville–Vallorbe (Swiss border) | Dijon-Ville–Dole-Ville | 200 km/h | (planned) | 1855–1915 | (46.3 km) |
Channel Tunnel | Folkestone–Coquelles | 160 km/h | unknown (technically possible)[47] | 1994 | (50.45 km) |
Total | 793 km |
Germany
Dedicated high-speed lines
Upgraded lines
Line name | Start and end points | Maximum speed | Upgrade | Opening | Length |
---|---|---|---|---|---|
Appenweier–Strasbourg railway | Kehl–Appenweier | 200 km/h | 2010–2020 | 1861 | 13.5 km (high-speed); 22 (total) |
Halle–Bebra railway | Bebra–Erfurt | 200 km/h | 2014–2019 | 1846–1849 | 96.13 km (high-speed); 210 km (total) |
Berlin–Halle railway | Berlin–Halle | 200 km/h | 1992–2006 | 1841–1859 | 161.6 km (new line in parallel at Leipzig-Halle section) |
Hamm–Warburg railway | Hamm–Warburg | 200 km/h | 1993–1994 | 1850–1853 | 8.4 km (high-speed); 131 km (total) |
Berlin–Hamburg Railway | Berlin–Hamburg | 230 km/h | 1997–2004 (160 km/h operations in the 1930s) | 1846 | 284.1 km |
Wanne-Eickel–Hamburg railway | Wanne-Eickel–Hamburg | 200 km/h | 1978–1990 | 1870–1874 | 355 km |
Cologne–Aachen high-speed railway | Köln–Aachen | 250 km/h | 2002 | 1841 | 70 km |
Cologne–Duisburg railway | Köln–Duisburg | 200 km/h | 1991 | 1845–1846 | 64 km |
Dortmund–Hamm railway | Dortmund–Hamm | 200 km/h | 1986 | 1845–1847 | 31 km; of which 20 km is high-speed |
Hanover–Hamburg railway | Hanover–Hamburg | 200 km/h | 1984–1987 | 1846–1847 | 181.2 km |
Hamm–Minden railway | Hamm–Minden | 200 km/h | 1980 | 1847 | 112 km |
Hanover–Minden railway | Hanover–Minden | 200 km/h | 1984–1985 | 1847 | 64.4 km |
Leipzig–Dresden railway | Leipzig–Dresden | 200 km/h | 1994–2014 | 1837–1839 | 117 km |
Nuremberg–Würzburg Railway | Nuremberg–Würzburg | 200 km/h | 1992–1999 | 1854–1865 | 102.2 km |
Rhine Railway Mannheim-Karlsruhe | Mannheim–Karlsruhe | 250 km/h | 1987 | 1840–1855 | 61 km (upgraded southern section 200 km/h) |
Rhine Railway Karlsruhe-Rastatt | Karlsruhe–Rastatt Süd | 250 km/h | 2024 | 1840–1855 | ~30 km (under construction) |
Rhine Railway Rastatt-Offenburg | Rastatt Süd–Offenburg | 250 km/h | 2001 | 1840–1855 | ~50 km |
Rhine Railway Offenburg-Basel | Offenburg–Basel | 250 km/h | unknown | 1840–1855 | ~120 km[49] |
Rosenheim–Salzburg railway | Rosenheim–Salzburg | 200 km/h | to be upgraded before 2030 | 1828–1838 | 88.6 km |
Mannheim–Frankfurt railway | Mannheim–Frankfurt | 200 km/h | 1985–1999 | 1869–1879 | 74.8 km |
Munich–Rosenheim railway | Munich–Rosenheim | 230 km/h | before 2030 | 1871 | 21.4 km (upgrading); 65 km |
Main–Spessart railway | Hanau–Würzburg | 200 km/h | 2013–2017 | 1854 | 38.254 km (high-speed); 112.5 km (total) |
Kinzig Valley Railway (Hesse) | Hanau–Fulda | 200 km/h | 2007–2021 | 1866–1875 | 16 km (high-speed); 80.6 km (total) |
Munich–Augsburg railway | Munich–Augsburg | 230 km/h | 1977–2011 | 1839–1854 | 61.9 km |
Ulm–Augsburg railway | Ulm–Augsburg | 200 km/h (now); 250 km/h (soon) | 1988–1992 | 1853 | 85.9 km |
Waghäusel Saalbach–Graben-Neudorf railway | Waghäusel Saalbach–Graben-Neudorf | 200 km/h | 1977–1988 | 1980s | 7.94 km |
Mannheim–Saarbrücken railway | Mannheim–Saarbrücken | 160 km/h (some sections are 200 km/h ready) | 2003–2019 (under upgrading) | 1847–1904 | 130.5 km |
Nuremberg–Augsburg railway | Nuremberg–Augsburg | 200 km/h | 1978–1981 | 1841–1869 | 36.5 km (high-speed section); 137.1 km (total) |
Lübeck–Puttgarden railway | Lübeck–Puttgarden | 200 km/h | 2020–2030 (upgrading approved) | 1898–1928 | 88.6 km |
Oberhausen–Arnhem railway | Emmerich–Oberhausen | 200 km/h | unknown (upgrading approved) | 1854 | 73 km |
Plauen–Cheb line | Plauen–Cheb | 200 km/h | EIS phase | 1865 | 73.9 km |
Munich–Mühldorf railway | Munich–Mühldorf | 200 km/h | planned | 1853–1863 | 45.609 km (high-speed); 115.087 km (total) |
Hungary
Dedicated high-speed line
Start and end points | Maximum speed | Upgrade | Length |
---|---|---|---|
Slovak Border-Budapest | 250 km/h | Planned |
Upgraded lines
Start and end points | Maximum speed | Upgrade | Length |
---|---|---|---|
Serbian Border-Budapest | 200 km/h | 2020–2023 (construction delayed) | 152 km |
Romanian Border-Budapest | 200 km/h | planned | 240 km |
India
Dedicated high-speed lines
Network | Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|---|
Diamond Quadrilateral | Mumbai–Ahmedabad high-speed rail corridor | Mumbai–Ahmedabad | 320 km/h (200 mph) | 2022 (under construction) | 508 km (316 mi) |
Classic upgraded lines
Line name | Maximum speed | Opening | Length |
---|---|---|---|
Delhi–Chandigarh | 200 km/h (120 mph) | (approved) | 244 km (152 mi) |
Delhi–Kanpur | 200 km/h (120 mph) | (approved) | 441 km (274 mi) |
Thiruvananthapuram–Kasaragod | 200 km/h (120 mph) | (approved)[50] | 529 km (329 mi) |
Mumbai–Ahmedabad | 200 km/h (120 mph) | (approved) | 493 km (306 mi) |
Mysuru–Bengaluru–Chennai | 200 km/h (120 mph) | (approved) | 495 km (308 mi) |
Nagpur–Secunderabad | 200 km/h (120 mph) | (approved) | 575 km (357 mi) |
Delhi–Mumbai | 200 km/h (120 mph) | (approved) | 1,386 km (861 mi) |
Delhi–Kolkata | 200 km/h (120 mph) | (approved) | 1,500 km (930 mi) |
Italy
Dedicated high-speed lines
Line name | Start and end points | Maximum speed | Opening or opened | Length |
---|---|---|---|---|
Florence–Rome high-speed railway | Florence–Rome | 250 km/h (160 mph) | May 26, 1992 (full length) | 254 km (158 mi) |
Rome–Naples high-speed railway | Rome–Naples | 300 km/h (190 mph) | December 29, 2005 (full length) | 205 km (127 mi) |
Naples–Salerno high-speed railway | Naples–Salerno | 300 km/h (190 mph) | June 2008 | 29 km (18 mi) |
Turin–Milan high-speed railway | Turin–Milan | 300 km/h (190 mph) | December 5, 2009 (full length) | 125 km (78 mi) |
Milan–Bologna high-speed railway | Milan–Bologna | 300 km/h (190 mph) | December 13, 2008 | 215 km (134 mi) |
Bologna–Florence high-speed railway | Bologna–Florence | 300 km/h (190 mph) | December 5, 2009 | 78 km (48 mi) |
Milan–Verona high-speed railway | Milan–Verona | 300 km/h (190 mph) | 2023 (under construction)[51] | 77 km (48 mi) (in operation); 165 km (103 mi) (full line under construction) |
Tortona–Genoa high-speed railway | Tortona–Genova | 250 km/h (160 mph) | 2022 (under construction) | 53 km (33 mi) |
Brenner Base Tunnel | 250 km/h (160 mph) | December 21, 2025 | 56 km (35 mi) | |
Verona-Brenner | 250 km/h (160 mph) | 2025 | 276 km (171 mi) | |
Verona-Venice | 300 km/h (190 mph) | unknown | 28 km (17 mi) (in operation); 103 km (64 mi) (full line under construction) | |
Turin–Lyon high-speed railway | Turin-French border (tunnel) | 220 km/h (140 mph) | 2030 | 72 km (45 mi) (Italian section); 270 km (170 mi) (total) |
Upgraded lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Naples-Foggia | Naples–Foggia | 200 km/h (120 mph) | 2026 (to be upgraded) | 194 km (121 mi) |
Milan–Bologna railway | Milan–Bologna | 200 km/h (120 mph) | upgraded in 1930s | 219 km (136 mi) |
Adriatic railway | Lecce–Bari–Foggia | 200 km/h (120 mph) | 2023 (to be upgraded) | 154 km (96 mi) (upgraded or new); 160.96 km (100.02 mi) (upgrading); 594 km (369 mi) (full) |
Japan
Dedicated high-speed lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Tokaido Shinkansen | Tokyo–Shin-Osaka | 285 km/h | October 1, 1964 | 515.4 km |
Sanyo Shinkansen | Shin-Osaka–Okayama | 300 km/h | March 15, 1972 | 553.7 km |
Okayama–Hakata | March 10, 1975 | |||
Tohoku Shinkansen | Tokyo–Ueno | 110 km/h (130 km/h by 2020)[52] | June 20, 1991 | 674.9 km |
Ueno–Omiya | November 15, 1985 | |||
Omiya–Utsunomiya | 275 km/h | June 23, 1982 | ||
Utsunomiya–Morioka | 320 km/h | |||
Morioka–Hachinohe | 260 km/h (320 km/h soon)[52] | December 1, 2002 | ||
Hachinohe–Shin-Aomori | December 4, 2010 | |||
Joetsu Shinkansen | Omiya–Niigata | 240 km/h (275 km/h soon)[53] | November 15, 1982 | 269.5 km |
Hokuriku Shinkansen | Takasaki–Nagano | 260 km/h | October 1, 1997 | 470.6 km |
Nagano–Kanazawa | March 14, 2015 | |||
Kanazawa–Tsuruga | construction (260 km/h ready) | 2022 (expected) | ||
Tsuruga–Osaka | 260 km/h | 2030+ (most likely 2045) | in study | |
Kyushu Shinkansen | Hakata–Shin-Yatsushiro | 260 km/h | March 12, 2011 | 256.8 km |
Shin-Yatsushiro–Kagoshima-Chuo | March 13, 2004 | |||
Takeo-Onsen–Nagasaki | construction | 2023 (expected, likely to be delayed until 2025) | 66.7 km | |
Hakata–Takeo-Onsen | on hold | 2030+ | 90 km | |
Hokkaido Shinkansen | Shin-Aomori–Shin-Hakodate-Hokuto | 260 km/h | March 26, 2016 | 360.2 km |
Shin-Hakodate-Hokuto–Sapporo | construction | 2030 (expected) |
Maglev lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Chuo Shinkansen | Shinagawa–Nagoya | 505 km/h (planned revenue services) 603 km/h (achieved speed record) |
2027 (Demonstrating operation since 2020) | 285.6 km (42.8 km ready as test track) |
Chuo Shinkansen (extension) | Nagoya–Osaka | 505 km/h | 2037 | 152.4 km |
Chuo Shinkansen (extension) | Shinagawa–Tokyo | 200 km/h | 2027+ (proposed) | 6.8 km |
Morocco
Dedicated high-speed line
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
LGV Tanger–Kénitra | Tanger–Kénitra | 320 km/h (200 mph) | 2018-11-15 | 200 km (120 mi) |
Upgraded line
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
LGV Kénitra–Casablanca | Kénitra–Casablanca | 160 km/h (320 km/h ready after upgrades) | 2020 | 150 km |
Dedicated high-speed lines planned
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
LGV Rabat–Oujda | Rabat–Oujda | Before 2030 (expected) | About 600 km | |
LGV Casablanca–Agadir | Casablanca–Agadir | Before 2030 (expected) | About 550 km | |
Total | About 1150 km |
Netherlands
Dedicated high-speed line
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
HSL-Zuid | Amsterdam Centraal–HSL 4 | 300 km/h | 2009-09-07 | 125 km |
Hanzelijn | Lelystad–Zwolle | 160 km/h (200 km/h ready) | December 2012; high-speed expected in 2021 | 50 km |
Upgraded lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Rhine Railway | Amsterdam–German border | 140/160 km/h (restricted) 200 km/h will be after further electrification upgrades |
2023 | 116.8 km |
Norway
Line | Speed | Length | Construction began | Expected start of revenue services |
---|---|---|---|---|
Gardermobanen | 210 km/h | 67 km | 1994 | 1999 |
Vestfold Line | 200–250 km/h | 36.5 km | 1993 | 2012–2018 |
Dovre Line | 200–300 km/h | 110 km | 2012 | 2024–2030 |
Oslo–Ski | 250 km/h | 22.5 km | 2014 | 2021 (postponed for December 2022[54]) |
Østfoldbanen | 250 km/h | 77 km (by 2024) 112.35 km (by 2030) | 2019 | 2024–≈2030 |
Østfoldbanen (dedicated part) | 250 km/h | 33 km | unknown | 2030 |
Ringerike Line | 250 km/h | 40 km | 2021 | 2028–≈2029 |
Grenlandsbanen | 250 km/h | 59 km | unknown | 2035 |
Bergen Line | 200 km/h | 69.2 km (high-speed); 371 km (full) | unknown | 2030 |
Poland
Upgraded lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Warsaw–Gdańsk railway (PKP rail line 9) | Warsaw–Gdańsk | 200 km/h (120 mph) | December 2020 | 40–45% of 323 km total |
PKP rail line 4 | Włoszczowa–Zawiercie | 200 km/h (120 mph)
230–250 km/h (140–160 mph) scheduled in 2023 |
2014-12-14 | 58 km (36 mi)[55] |
Grodzisk Mazowiecki–Idzikowice | 2017-12-10 | 85 km (53 mi)[55] | ||
other upgradable sections | 230–250 km/h (140–160 mph) | 2023 (projected) | 81 km (50 mi)[55] | |
Warsaw-Białystok-Ełk-Suwałki-national border (Rail Baltica, partially new line between Ełk and national border) | Warsaw-Trakiszki | 200 km/h (120 mph) Warszawa-Ełk; 250 km/h (160 mph) Ełk-national border | 2025 (projected) | 280.541 km (upgradable section) |
PKP rail line 131 | Bydgoszcz-Tczew | 200 km/h (120 mph) | After 2023 | 124.166 km (upgrading); 492.019 km (full line) |
Dedicated lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Y-shape line | Phase 1: | 250 km/h (160 mph) | Phase 1: 2027–2029 (with Central Transport Hub) | 450 km |
CMK Północ / PKP rail line 5 | Central Transport Hub (Solidarity Airport)-Płock-Włocławek-Grudziądz-Tczew/Gdańsk | 250 km/h (160 mph) | After 2030 | ~295 km |
Connector between Y-shape line, PKP rail line 4 and PKP rail line 5 | Central Transport Hub (Solidarity Airport)-Korytów | 250 km/h (160 mph) | 2027–2029 (with Central Transport Hub) | ~25 km |
Shortcut in PKP rail line 9 | Warszawa Choszczówka-Nasielsk/Kątne/Świercze | 250 km/h (160 mph) | ? | ~33 km |
V4 rail corridor (loose concept) | Warsaw–Bratislava–Budapest | 250 km/h (160 mph) | ? | 900 km (560 mi) (total; including foreign line) |
Romania
Upgraded lines
Start and end points | Maximum speed | Upgrade | Length |
---|---|---|---|
Bucharest-Cluj | 200 km/h | 2020 (construction delayed) | 497 km |
Cluj-Hungarian border | 200 km/h | 2020–2026 (upgrading claimed) | 160 km |
Bucharest-Iasi | 200 km/h | Proposed | 406 km |
Ploiești-Suceava | 200 km/h | Proposed | 505 km |
Russia
Upgraded lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Moscow–Saint Petersburg Railway | Moscow–Saint Petersburg | 250 km/h (160 mph) (5% of tracks), 100–200 km/h (the rest) | 2009-12-26 | 650 km (400 mi) |
Riihimäki–Saint Petersburg Railway | Riihimäki–Saint Petersburg | 220 km/h (140 mph) (Finnish section), 140–200 km/h (Russian section) | 2010-12-12 | 385 km (239 mi) (190 km in Finland) |
Saudi Arabia
Dedicated high-speed lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Haramain HSR | Mecca–Medina | 300 km/h | 2018-10-11 | 453 km |
Gulf Railway (Saudi section) | 220 km/h | until 2023 | 663 km |
Classic upgraded lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
SRO Dammam–Riyadh line | Dammam–Riyadh | 180 km/h (now); 200 km/h (soon) | 1981 | 449 km |
SAR Riyadh–Qurayyat line | Riyadh–Qurayyat | 180 km/h (now); 200 km/h (soon) | 2017 | 1,242 km |
Serbia
Upgraded lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Budapest–Belgrade international corridor | Belgrade–Stara Pazova | 200 km/h (120 mph) | end of 2020 (upgrading) | 34.5 km (21.4 mi) |
Stara Pazova–Novi Sad | 200 km/h (120 mph) | November 2021 | 43 km (27 mi) | |
Novi Sad-Hungarian Border | 200 km/h (120 mph) | 2023 (upgrading after 2019, delayed) | 106.5 km (66.2 mi) |
South Korea
Dedicated high-speed lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Gyeongbu HSR | Seoul–Dongdaegu | 305 km/h (350 km/h ready) | 2004-04-01 | 286.8 km |
Dongdaegu–Busan | 2010-11-01 | 130.7 km | ||
Honam HSR | Osong–Gwangju Songjeong | 305 km/h (350 km/h ready) | 2015-04-02 | 182.3 km |
Suseo–Pyeongtaek HSR | Suseo–Jije–Pyeongtaek Junction | 300 km/h | 2016-12-09 | 61.1 km |
New main lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Gyeonggang Line | Seowonju–Gangneung | 250 km/h | 2017-12-22 | 120.7 km |
Bujeon–Masan Line | Bujeon–Chilsan Junction | Construction (250 km/h) | 2020 (expected) | 32.7 km |
Seohae Line | Wonsi–Hongseong | Construction (250 km/h) | 2020 (expected) | 89.2 km |
Upgraded lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Jeolla Line | Iksan–Suncheon | 200 km/h (230 km/h ready) | 2011-10-05 | 145.6 km |
Suncheon–Yeosu Expo | 230 km/h | 34.8 km | ||
Donghae Line | Geoncheon Interconnection–Pohang | 200 km/h | 2015-04-02 | 38.7 km |
Geoncheon Interconnection–Taehwagang | Upgrading (200 km/h) | 2020 (expected) | 41.6 km | |
Jungang Line | Cheongnyangni–Seowonju | 230 km/h | 2017-12-22 | 86.4 km |
Seowonju–Jecheon | Upgrading (250 km/h) | 2018 (expected) | 44.1 km[56] | |
Jecheon–Dodam | 150 km/h (250 km/h ready) | 2011-03-31 | 17.4 km | |
Dodam–Yeongcheon | Upgrading (250 km/h) | 2020 (expected) | 148.1 km | |
Yeongcheon–Singyeongju | Upgrading (250 km/h) | 2020 (expected) | 20.4 km |
Spain
Dedicated high-speed line (operational)
North-western corridor
Madrid–Zamora
The Madrid–Zamora line is the open section of the under construction Madrid–Galicia high-speed rail line connecting Madrid to Zamora via Segovia. The line shares a common section with the Madrid–Leon line for the part between Madrid and Olmedo. The Madrid–Zamora line entered revenue service on December 17, 2015, by Alvia S-730 (Patito, max speed 250 km/h (155 mph)) trains that cover the distance in 1 hour and 33 minutes.[57] Part of the line up to Medina del Campo is also used for the Alvia Madrid–Salamanca service.
The Atlantic Axis
The Atlantic Axis high-speed railway line is connecting the two main cities of Vigo and A Coruña (Corunna) via Santiago de Compostela in the northwestern Spanish region of Galicia. The railway, 155.6 km in length, is an upgrade of the former non-electrified single railway line between the town of Ferrol and the Portuguese border for the part between A Coruña and Vigo, into a double electrified high-speed line. The new rebuilt railway permits mixed use traffic with a maximum design speed of 250 km/h for passenger trains.[58] The new railway was inaugurated in April 2015 and shortened the distance between the two cities by 22 km, from 178 km to 156 km, and cut the travel time from around 3 hours on the old railway down to 1 hour and 20 minutes on the new one. 37 tunnels totalling 59 km and 34 bridges totalling 15 km form part of the rebuilt railway.[59] The line is served by Alvia S-121 or S-730 (max speed 250 km/h (155 mph)) train-sets for the routes between A Coruña and Vigo[60] and between A Coruña and Ourense and by Alvia S-730 (Patito, max speed 250 km/h (155 mph)) train-sets connecting Galicia with other Spanish regions. The line will be connected at Santiago de Compostela with the Madrid–Galicia high-speed rail line, which as of 2015 is under construction.
North corridor
Madrid–León
The Madrid–Leon high-speed rail line connects Madrid with León passing the cities of Segovia, Valladolid and Palencia. The line supports the longest railway tunnel in Spain at 28 km in length and is served by up to two S-102 (Pato, max speed 330 km/h or 205 mph) trains per day with the fastest schedule lasting 2 hours and 6 minutes. Other trainsets used on the Madrid–Leon line include S-120 (max speed 250 km/h (155 mph)) and S-130 (Patito, max speed 250 km/h (155 mph)) for the Alvia services.
North-eastern corridor
Madrid–Barcelona
Madrid–Barcelona high-speed railway line connects Madrid with Barcelona in the north east of Spain passing through the cities of Guadalajara, Calatayud, Zaragoza (Saragossa), Lleida (Lérida) and Tarragona where the future Tarragona–Valencia high-speed railway line will connect. The line has a length of 621 km and a travel time of two and a half hours for the direct trains using the route avoiding entering Zaragoza (Saragossa) and Lleida (Lérida). The line is served by S-103 (max speed 350 km/h or 217 mph) trains. Seventeen trains run now every day between 6:00 and 21:00 hrs. Direct trains Barcelona–Seville and Barcelona–Malaga that do not make a stop in Madrid are also scheduled combining the Madrid–Barcelona line with one of the southern corridor's existing lines. S-112 (Pato, max speed 330 km/h or 205 mph) trains are used for these services and cover these distances in less than 6 hours.
Barcelona–Perpignan (France)
The international high-speed section across the border, Perpignan–Figueres (44.4 km), of the Perpignan–Barcelona high-speed rail line opened in December 2010. Since then, French TGV trains operate from Paris. The Spanish high-speed section Barcelona–Figueres opened on January 7, 2013.[61][62] Nine Spanish services initially serviced the line, with 8 being a through service to Madrid, which also connected with two French TGV services from Paris. Previously French TGV services connected Paris and Barcelona by means of a shuttle train on the standard Barcelona–Figueres line.[63][64][65] Direct Barcelona-Paris, Madrid-Marseille, Barcelona-Lyon and Barcelona-Toulouse high-speed trains between France and Spain started on December 15, 2013.[66]
Madrid–Huesca
The Zaragoza–Huesca section branches off from the Madrid–Barcelona line at Zaragoza and connects with the city of Huesca and serves the connection train station for regional trains in the town of Tardienta. The line first put in operation in 2005 and is served by up to two S-102 (Pato, max speed 330 km/h or 205 mph) trains per day with the fastest train journey between the two cities lasting 2 hours and 5 minutes.
Eastern corridor
Madrid–Castellón
The Madrid–Castellón line connects the city of Castellón with the city of Madrid passing through the cities of Cuenca, Requena-Utiel and Valencia. The section It is serviced by S-112 (Pato, max speed 330 km/h or 205 mph) trains, assembled by the Talgo-Bombardier consortium. Direct trains to Valencia cover the 391 km in 98 minutes while thirty trains run every day between 05:00 and 21:00, fifteen in each direction. For the service Madrid–Castellón AVE trains cover the distance in 2 hours and 25 minutes and 4 trains per day are scheduled, two in each direction.[citation needed] The line is part of the Madrid–Levante network (see below). Direct trains Valencia–Seville that do not make a stop in Madrid are also scheduled combining the existing lines of Madrid–Castellón and Madrid-Seville. S-102 (Pato, max speed 330 km/h or 205 mph) trains are used for this service and cover the whole distance in 3 hours and 50 minutes.
Madrid–Alicante
A 350 km/h line branches off from the Madrid–Castellón Line and connects the city of Alicante with the city of Madrid passing through the cities of Cuenca, Albacete and Villena.[67] It is part of the Madrid–Levante HSR network and is serviced by S-112 (Pato, max speed 330 km/h or 205 mph) trains that cover the distance in up to 2 hours and 12 minutes. Direct trains Toledo–Albacete were also scheduled in the past, combining four of the existing lines, but this service was eventually terminated due to low demand.
South corridor
Madrid–Seville
The Madrid–Seville high-speed railway line connects Madrid with Seville in the south of Spain, passing through the cities of Ciudad Real, Puertollano and Córdoba, where the Madrid–Málaga high-speed rail line branches off towards Málaga just outside Los Mochos near Almodóvar del Río. The route travels across the plains of Castile, travelling through the Sierra Morena mountains just before reaching Córdoba, before going onward towards Seville through the largely flat land surrounding the Guadalquivir river. The Madrid–Seville line was the first dedicated passenger high-speed rail line to be built in Spain and was completed in time for Seville's Expo 92. With a length of 472 km, the fastest train journey between the two cities takes 2 hours and 20 minutes. The line is served by S-100 (max speed 300 km/h or 186 mph) trains. The extension section of the Madrid-Seville high-speed rail line to Cádiz is served by Alvia trains that connect the city of Cádiz to Madrid and reach speeds up to 200 km/h in this section.[68]
Madrid–Málaga
The Madrid–Málaga high-speed rail line connects the city of Málaga with the city of Madrid. The line shares a common section with the Madrid–Seville high-speed rail line up to the city of Córdoba and then includes a 155 km long spur line up to the city of Málaga. It is served by S-102 (Pato, max speed 330 km/h or 205 mph) and S-103 (max speed 350 km/h or 217 mph) trains and the fastest train journey between the two cities takes 2 hours and 20 minutes. Apart from the traffic to and from the city of Málaga, the line also handles the traffic to the cities of Granada and Algeciras. In the future, the line will also support the traffic between Madrid and the Costa del Sol high-speed rail line.
Madrid–Toledo
The Madrid–Toledo high-speed rail line branches off from the Seville and Málaga routes around the depot at La Sagra. The Avant service between the two cities offers journey times of half an hour on trains with a maximum speed of 250 km/h.
Dedicated high-speed line (under construction)
Line | Connected Cities | Year expected to be completed |
---|---|---|
North-western corridor | ||
HSR Madrid–Galicia | Zamora · Ourense | 2019 |
North corridor | ||
HSR Madrid–Asturias | León · La Robla | – |
La Robla · Pola de Lena | after 2020 | |
Pola de Lena · Oviedo · Gijón | – | |
HSR Madrid–Basque Country | Venta de Baños · Burgos | 2019 |
Burgos · Miranda de Ebro · Vitoria | 2023[69] | |
Basque Y | Vitoria · Bilbao · San Sebastián · Irún · French border | 2023 |
Eastern corridor | ||
HSR Madrid–Levante | Alicante · Murcia · Cartagena | 2020 |
Southern corridor | ||
HSR Andalusian Transverse Axis | Antequera · Granada | 2019 |
Antequera · Sevilla | 2020 | |
HSR Madrid–Jaén | Mora · Alcázar de San Juan | – |
Alcázar de San Juan · Manzanares | – | |
Linares · Casas de Torrubia | – | |
Grañena · Jaén | 2018[70] | |
Mediterranean corridor | ||
HSR Catalonia–Andalusia | Tarragona · Vandellós | 2019 |
Valencia · Murcia | 2019 | |
Murcia · Almería | 2023 | |
South-western corridor | ||
HSR Madrid–Extremadura | Plasencia · Badajoz | 2020 |
Madrid · Plasencia | 2023[71] |
Madrid interconnector
A new interconnecting tunnel is planned between Madrid Atocha and Madrid Chamartín stations. Currently, trains going to Valladolid leave from Chamartín and trains going to Seville, Málaga and Barcelona leave from Atocha station. Also, there is a single daily service in each direction running along the Barcelona–Seville and Barcelona–Málaga routes, which uses the high-speed bypass around Madrid to avoid reversing the direction of train in Atocha station. The tunnel will allow services serving northern cities to travel non-stop or with a stop through Madrid and onward to southern cities (or vice versa), without the driver having to change ends or bypass Madrid, a valuable source of passengers: currently, someone wanting to travel from Valladolid to Málaga, for instance, must travel from Valladolid Campo Grande station to Madrid Chamartín station before taking a Cercanías service to Atocha; then finally taking an onward train to Málaga.
On April 24, 2010, tunnelling started on the 7.3 km route connecting Atocha and Chamartin.[72] The tunnel itself is now complete, and the tracks are in place. The electric line is currently being installed, with these works expected to be completed in early 2018, and service started within the same year.[73]
North-western corridor
Zamora–Ourense
The Madrid–Galicia high-speed rail line will connect the city of Madrid with the region of Galicia and the Atlantic Axis high-speed rail line in the North West of Spain via Santiago de Compostela. The line will include a new 424 km long high-speed railway section that starts at Olmedo 130 km to the north of Madrid on the Madrid–Leon high-speed rail line and ends at Santiago de Compostela. Construction on the northernmost part of this section between the cities of Ourense and Santiago de Compostela began late 2004 and this part was inaugurated in December 2011. The southern part between Olmedo and Zamora entered revenue service on December 17, 2015.[57] Constructions on the central part, which crosses some of Spain's most remote and fragile nature areas, are expected be completed in 2019. The line is currently served by Alvia trains.[74]
North corridor
León–Gijón
Madrid–Asturias high-speed railway is the line connecting Madrid to the region of Asturias in the north of Spain. The new under construction section branches off the Valladolid–Vitoria high-speed section at Venta de Baños: 205 km north of Madrid and then reaches the cities of Oviedo and Gijón via Palencia and León.[75] This section includes the 24,7 km long Pajares Base Tunnel (Variante de Pajares) which runs under a very mountainous area between the Province of León and the Principality of Asturias.[76] Construction started in 2009 (except variante de pajares which started 2003) and reached León in September 2015 and expected to reach Oviedo and Gijón after 2020.[77]
Valladolid–Vitoria
The extension of the Madrid–Valladolid section towards the Basque Country began construction in 2009. This 223.4 kilometres (138.8 mi) railway line will run parallel to the 244.8 kilometres (152.1 mi) long existing railway line. Originally it was to be used as a mixed-use high-speed railway line, but it has since been changed to a passenger-dedicated railway line, leaving the existing railway line for freight trains. The line was forecast to open the Valladolid–Burgos part around 2013 and the Burgos–Vitoria-Gasteiz part in 2014 or 2015. However, due to delays the line is not expected to open before 2023, although the Valladolid–Burgos section is expected to enter full revenue service in 2019. At Vitoria it will be connected to the Basque high-speed railway line (Basque Y), thus reaching the French border. Once opened, the travel time between Valladolid and Vitoria will be around an hour.
Basque Y
The Basque high-speed railway line (Basque Y) will connect the three Basque capitals, Vitoria-Gasteiz, Bilbao and San Sebastián. Construction began in October 2006 and the line was forecast to open in 2016. However, due to delays in construction, the line is expected to put in service in 2023 according to the new estimations. The three Basque capitals will be further connected with Madrid via Valladolid, and with the French border via Irun and Bayonne.
North-eastern corridor
Tunnel Sants–La Sagrera
The Sants–La Sagrera tunnel links the Sants station in Barcelona through the Eixample with the future La Sagrera station. The tunnel passes under the streets of Provença and Mallorca, using a short part of the Diagonal to link between these streets. In the Carrer de Mallorca, the tunnel passes directly in front of Gaudí's masterpiece, the basilica of the Sagrada Família, and in the Carrer de Provença, another Gaudí work, the Casa Milà. In a long campaign against this route, the Board of the Sagrada Família and other parties argued that the tunnel would damage the church, whose construction is still in progress. In this discussion about different routes, the one now built is also called the Provença tunnel because part of its route passes under this street.
The tunnel boring machine Barcino passed the Sagrada Família in October 2010, and reached its final destination a few months later. Rail traffic is planned to start in 2012, initially without stops at the La Sagrera station, which is expected to be completed in 2016.
In March 2012, railway equipment was installed, with a special elastic isolation of the rails to dampen vibrations at the sections passing close to Gaudí's architectural works, using the Edilon system.[80][81]
Eastern corridor
Alicante–Cartagena
This is an under construction section, part of the Madrid–Levante network of high-speed railways connecting the capital with the Mediterranean coast. Consisting of 955 kilometres (593 mi) of railways with an estimated cost of 12.5 billion euros, it is the most expensive high-speed railway project in Spain. The network will consist of both dedicated passenger high-speed railways designed for trains running above 300 kilometres per hour (190 mph) and high-speed railways shared with freight trains.[82] The network is to be opened in stages, starting with the Madrid–Valencia/Albacete section, which was opened in December 2010,[83][84] followed by Albacete–Alicante in June 2013,[85] Valencia–Castellón in January 2018,[86] while Valencia–Alicante is expected to follow in 2019 and finally reaching the city of Murcia by 2020 with a branch line to Cartagena.
South corridor
Seville–Granada
- Transversal Rail Axis (Eje Ferroviario transversal de Andalucía),[87] the Andalusian high-speed rail line connecting Huelva, Seville, Granada and Almería. Part of the line is financed and built by the Andalusian government.
The southern Andalusian transverse high-speed railway line is a 503.7-kilometre railway running between the cities of Huelva and Almería, passing the cities of Seville and Granada. The line is designed for speeds up to 250 kilometres per hour, except for the 130-kilometre Antequera–Granada and the 103-kilometre Seville–Huelva parts of the line, which are designed for speeds in excess of 300 kilometres per hour. A connection between Huelva and the Portuguese border is being studied.[citation needed] When finished the journey between Huelva and Almería in the new line is estimated to last 3 hours and 35 minutes.[88] The first section of the line between Antequera and Granada is expected to put in service by summer 2019 connecting the city of Granada to the rest of the high speed network via the Madrid–Málaga high-speed rail line. The section between Seville and Antequera is expected to be completed in 2020.
Madrid–Jaén
This high-speed railway line will be part passenger-dedicated high-speed railway (Madrid–Alcázar de San Juan) and part shared with freight trains (Alcázar de San Juan–Jaén). The first 99 km of the line will use the already existing Madrid-Seville high-speed railway line. From there, a 67.5 km branch line will be constructed towards Alcázar de San Juan.
From Alcázar de San Juan the existing railway line will be upgraded to allow passenger trains to run up to 250 km/h; a new double-tracked route through the Despeñaperros mountain range will be built to replace the existing single-tracked route. This part of the high-speed railway also forms part of the Madrid–Algeciras freight corridor. An extension of the line to Granada is being investigated; however, the complicated terrain between Jaén and Granada might make it uneconomical.
Mediterranean corridor
Tarragona–Almería
The high-speed Barcelona-Figueres section (from Barcelona to the French border) was inaugurated in January 2013.[89] The journey from the centre of Barcelona to the centre of Girona takes now 37 minutes (compared to the hour and a half it took), and to Figueres in 53 minutes (instead of two hours). Girona and Figueres will be 14 minutes from each other. The Perpignan (France)–Figueres section opened in 2010. One lacking high-speed section on the French side, between Montpellier and Nîmes, is scheduled to open in July 2018, allowing almost continuous high-speed travel from the French high-speed network to the Spanish one.[90] The French government, on the other hand, recently announced indefinite delays to the Montpellier–Perpignan high-speed section that was originally planned for 2020. The section linking Tarragona to Almería via Valencia and Murcia is expected to be completed by 2023. The final section between Almería and Algeciras, passing through Málaga, will be built at a later point of time; an alternative and longer route looks likely.[91]
South-western corridor
Madrid–Extremadura
This line was initially planned as Lisbon–Madrid high-speed rail line to connect the two peninsular capitals, Madrid and Lisbon in 2 hours and 45 minutes.[92][93] This line had been a key issue in bilateral summits in recent years and was about to link Spain's high-speed rail network with the planned High-speed rail in Portugal, a project announced by the Portuguese government in February 2009. Construction on the Spanish side began in late 2008 on a segment between the cities of Badajoz and Mérida. Both Spanish and Portuguese track were to be completed around 2013, later the Portuguese government brought forward its plans from 2015 but the Portuguese froze works in June 2011 and eventually cancelled the project in March 2012.[94][95][96] In 2016 the European Union's European Regional Development Fund, gave Spain €205.1m towards the €312.1m needed for the track between Navalmoral de la Mata and Mérida, Spain. [97] The section on the Spanish side between Madrid and Badajoz is expected to be completed in 2023.
With a length of 439 km on the Spanish side, of which 48 km are part of the already built Madrid–Seville high-speed rail line, it will connect cities like Talavera de la Reina, Navalmoral de la Mata, Plasencia, Cáceres, Mérida and Badajoz.[92] The Almonte River Viaduct was completed in May 2016 to carry this line. It is a concrete arch bridge with a span of 384 meters (1,260 feet), ranking among the longest in the world of this type of bridge.[98][99]
With a length of 200km on the Portuguese side, of which 100 km are in service (Intercity trains run at 200 km/h in the upgraded single track), work is underway to close the missing gap between Evora-Badajoz.
Upgraded lines
Line name | Start and end points | Maximum speed | Upgraded | Length | Notes |
---|---|---|---|---|---|
Barcelona-Alicante rail line | Barcelona-Sants–Alicante | 220 km/h (140 mph) | 1997 | 523 km (325 mi) | Only some sections are for high-speed trains. Some of them converted in 1997, additional dedicated in parallel is partially opened in 2018 |
Madrid-Valencia rail line | Madrid-Atocha–Valencia-Nord | 220 km/h (140 mph) | 1999 | 301 km (187 mi) | Since 2010 not in use for high-speed trains |
Sweden
Dedicated
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Bothnia Line | Nyland–Umeå | 250 km/h (160 mph)[100] (no trains are designed and permitted to operate above 200 km/h) | 2010 | 185 km (115 mi) |
North Bothnia Line | Umeå–Luleå | 250 km/h (160 mph) | 2028 | 270 km (170 mi) |
Götalandsbanan | Linköping C–Göteborg C | 320 km/h (200 mph) | 2024–2030 (construction of the first section to be started in spring, 2018 as claimed in 2016; likely to be postponed) | 440 km (270 mi) |
East Link Project | Linköping–Södertälje | 250 km/h (160 mph)(cut from 320 to 250) | 2033–2036 (construction of the first section to be started in 2017 as claimed; likely to be postponed) | 160 km (99 mi) |
Upgraded lines
Line name | Start and end points | Maximum speed | Upgrade | Opening | Length |
---|---|---|---|---|---|
Southern Main Line | Katrineholm–Malmö | 200 km/h | 336 km (high-speed); 480 (total) | ||
Stockholm–Göteborg, | 200 km/h | 1990 | 312 km (high-speed); 390 km (total) | ||
Göteborg–Malmö, | 200 km/h | 1985 * | 172 km (high-speed); 230 km (high-speed) | ||
Eskilstuna–Södertälje | 200 km/h | 1997 * | 80 km | ||
Jakobsberg–Västerås | 200 km/h | 2001 * | 90 km | ||
East Coast Line (Stockholm-Arlanda) | 200 km/h | 1999 | 1903 | 56 km (of which 19 km is new airport branch) | |
East Coast Line (Gävle–Enånger) | 200 km/h | 1999 * | 40 km (high-speed); 105 km (full) | ||
East Coast Line (Uppsala–Gävle) | 200 km/h | 2017 | 82.5 km; (high-speed) 110 km; (full) | ||
Norway/Vänern Line | Göteborg C–Öxnered | 200 km/h | 2012 * | 1879 | 82 km (high-speed); 79.1;km (to be upgraded); 300;km (total) |
- The lines marked with * were to a large part given a new alignment when upgrading from single track, essentially making them new lines. The other ones were straight enough for 200 km/h already.
There are plans to upgrade some lines to 250 km/h when the ERTMS signalling system is introduced in 2025–2030.
Switzerland
Rail 2000 high-speed lines
Line | Speed | Length | Opening |
---|---|---|---|
NBS Mattstetten–Rothrist | 200 km/h | 45.079 km | December 12, 2007 |
Solothurn–Wanzwil railway | 200 km/h | 11 km | December 12, 2004 |
Lötschberg Base Tunnel | 250 km/h | 34.57 km | June 14, 2007 |
Gotthard Base Tunnel | 200 km/h (now) 250 km/h (soon) |
57.09 km | June 1, 2016 |
Ceneri Base Tunnel | 250 km/h | 15.4 km | September 2020 |
Jura Foot Railway | 200 km/h | 104.5 km | 2025–2030 |
Simplon Railway | 200 km/h | 191.41 km | 2025–2030 |
Other projects
Line | Speed | Length | Opening Date |
---|---|---|---|
Lausanne–Geneva railway | 200 km/h | 66.18 km | 2025–2030 |
Taiwan
Dedicated high-speed line
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Taiwan HSR | Banqiao–Zuoying | 300 km/h (190 mph) | 2007-01-05 | 332.1 km (206.4 mi) |
Taipei–Banqiao | ~130 km/h (81 mph) | 2007-03-01 | 7.2 km (4.5 mi) | |
Nangang–Taipei | ~130 km/h (81 mph) | 2016-07-01 | 9.2 km (5.7 mi) |
Thailand
Dedicated high-speed line
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Northern HSR | Bangkok–Phitsanulok | 300 km/h (190 mph) or more | 2024 (EIS) | 384 km |
Phitsanulok–Chiang Mai | 300 km/h (190 mph) | 2030 (under planning) | 285 km | |
Northeastern HSR | Bangkok–Nakhon Ratchasima | 250 km/h (160 mph) | 2023 (under construction) | 250 km |
Nakhon Ratchasima–Nong Khai | 250 km/h (160 mph) | 2025 (planned) | 380 km | |
Southern HSR | Bangkok–Hua Hin | 300 km/h (190 mph) | 2023 (building contracts signed) | 211 km |
Hua Hin–Surat Thani | 300 km/h (190 mph) | 2029 | 771 km | |
Surat Thani-Padang Besar | 300 km/h (190 mph) | 2029 | 771 km | |
Eastern HSR | Bangkok–U-Tapao | 250 km/h (160 mph) | 2024 (under construction) | 260 km |
U-Tapao–Trat | 250 km/h (160 mph) | 2028 (planned) | 190 km |
Turkey
Dedicated high-speed lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Ankara–Istanbul high-speed railway | Ankara Central–Sincan | 140 km/h (87 mph) | 2018-04-12 | 24 km (15 mi) |
Sincan–Polatlı | 250 km/h (160 mph) | 2009-03-13 | 69 km (43 mi) | |
Polatlı–Eskisehir Central | 2009-03-13 | 152 km (94 mi) | ||
Eskisehir Central–Köseköy | 2014-07-25 | 188 km (117 mi) | ||
Köseköy–Gebze | 160 km/h (99 mph) | 2014-07-25 | 56 km (35 mi) | |
Gebze–Pendik | 100 km/h (62 mph) | 2014-07-25 | 20 km (12 mi) | |
Pendik–Haydarpaşa Terminal | 100 km/h (62 mph) Connection to Haydarpaşa under reconstruction | 2019 | 24 km (15 mi) | |
Pendik–Halkalı | 100 km/h (62 mph) | 2019 | 60 km (37 mi) | |
Ankara–Konya high-speed railway | Polatlı–Konya | 300 km/h (190 mph) | 2011-08-23 | 212 km (132 mi) |
Ankara–Sivas high-speed railway | Ankara Central–Kayaş | 140 km/h (87 mph) | 2018-04-12 | 12 km (7.5 mi) |
Kayaş–Kırıkkale | 250 km/h (160 mph) | 2021 (projected) | 62 km (39 mi) | |
Kırıkkale–Yerköy | 2020 (projected) | 79 km (49 mi) | ||
Yerköy–Sivas | 2020 (projected) | 253 km (157 mi) | ||
Ankara-İzmir high-speed railway | Polatlı–Afyon | 250 km/h (160 mph) | 2023 (projected) | 152 km (94 mi) |
Afyon–Banaz | 80 km (50 mi) | |||
Banaz–Eşme | 97 km (60 mi) | |||
Eşme–Salihli | 74 km (46 mi) | |||
Salihli–Manisa | 62 km (39 mi) | |||
Manisa–Menemen | 43 km (27 mi) |
Upgraded lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Konya–Mersin/Adana railway | Konya–Karaman | 200 km/h (120 mph) | 2020 (projected) | 102 km (63 mi) |
Karaman–Ulukışla | 200 km/h (120 mph) | 2022 (projected) | 135 km (84 mi) | |
Ulukışla–Yenice | 200 km/h (120 mph) | Tender phase, 2025 (projected) | 110 km (68 mi) | |
Mersin–Yenice–Adana | 200 km/h (120 mph) | 2022 (projected) | 76 km (47 mi) | |
Istanbul–Kapıkule railway | Halkalı–Çerkezköy | 200 km/h (120 mph) | Tender phase | 76 km (47 mi) |
Çerkezköy–Kapıkule | 200 km/h (120 mph) | Under construction | 153 km (95 mi) |
United Kingdom
Dedicated high-speed lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
High Speed 1 | Channel Tunnel–Fawkham Junction (Section 1) | 300 km/h (190 mph) | 2003-09-28 | 74 km (46 mi) |
Fawkham Junction–St. Pancras (Section 2) | 250 km/h (160 mph) | 2007-11-14 | 39 km (24 mi) | |
High Speed 2 | London Euston-Birmingham Curzon Street (Phase 1) | 330 km/h (210 mph) | 2028 (Under construction[101]) | 230 km |
Birmingham Curzon Street-Crewe (Phase 2a) | 330 km/h (210 mph) | 2029 (Planned) | 90 km (56 mi) | |
Crewe–Manchester Piccadilly and Birmingham Curzon Street–Leeds City (Phase 2b) | 330 km/h (210 mph) | 2033 (Planned) | 300 km (190 mi) |
Upgraded lines
Line name | Start and end points | Maximum speed | Opening | Electrification | Length | Notes |
---|---|---|---|---|---|---|
East Coast Main Line | King's Cross–Edinburgh Waverley | 201 km/h (125 mph) 225 km/h (140 mph) (in cases of delay; to be applied after ERTMS re-signalling) |
1850 | 1980s | 632 km (393 mi) | The fastest non-dedicated line in the UK. During electrification in the 1980s was claimed as the longest construction site in the world. Speeds up to 125 mph were achieved in the 1930s. |
Great Western Main Line | London Paddington–Bristol Temple Meads | 201 km/h (125 mph) (now) 225 km/h (140 mph) (soon) |
1840 | incomplete, still ongoing | 192 km (119 mi) | |
Midland Main Line | St Pancras International–Sheffield | 201 km/h (125 mph) | 1870 | ongoing; high-speed trains are with diesel | 265 km (165 mi) | 110 mph; 125 mph ready |
West Coast Main Line | London Euston–Glasgow Central | 201 km/h (125 mph)[102] | 1869 | 1960s–1970s | 642 km (399 mi) | failed to be upgraded to 225 km/h (140 mph) |
Cross Country Route | York–Bristol Temple Meads | 201 km/h (125 mph) | 1879 | incomplete | >50 km (31 mi)(high-speed) | Leeds-York section is high-speed |
Channel Tunnel | Folkestone–Coquelles | 160 km/h (99 mph) (restricted) 200 km/h (120 mph) (possible) |
1994 | after opening | 50.45 km (31.35 mi) | Geometrically allowed to be sped up to 200 km/h (120 mph)[103], now is limited slower. |
United States
Upgraded lines
Line name | Start and end points | Maximum speed | Upgraded | Length |
---|---|---|---|---|
Northeast Corridor | Washington Union–Boston South | 150 mph (240 km/h) | 2000 | 54.6 km (33.9 mi) |
Trenton–New Brunswick | 160 mph (260 km/h) (2020); 186 mph (299 km/h) (planned) | 2020 | 39 km (24 mi) | |
New Jersey and Philadelphia | 135 mph (217 km/h) | 1999 | 86 km (53 mi) | |
high-speed railroad | 125 mph (201 km/h) | 1960 | 221.4 km (137.6 mi) | |
the rest of the line | 110 mph (180 km/h) | 2000 | 373 km (232 mi) | |
Keystone Corridor | Philadelphia–Harrisburg | 125 mph (201 km/h) | 2006 | 168.3 km (104.6 mi) |
Empire Corridor | New York City–Niagara Falls | 125 mph (201 km/h) | 1999 | 740 km (460 mi) |
California High-Speed Rail (Caltrain) |
San Francisco–San Jose | 110 mph (180 km/h)[104] | 2031 (planned)[105][106] | 49 mi (79 km) |
Dedicated high-speed lines
The United States has no dedicated high speed rail lines–the following are planned to be constructed.
Line name | Start and end points | Maximum speed | Planned opening | Length |
---|---|---|---|---|
California High-Speed Rail (Phase 1) |
San Jose–Bakersfield/Los Angeles | 220 mph (350 km/h) | 2029 (central leg) 2033 (total)[106] |
275 km (171 mi) (central leg) 840 km (520 mi) (total) |
California High-Speed Rail (Phase 2) |
Merced–Sacramento | 220 mph (350 km/h) | 2030+ | 180 km (110 mi) |
Los Angeles–San Diego | 220 mph (350 km/h) | 2030+ | 269 km (167 mi) | |
New Northeast Corridor | Boston–Washington, D.C. | 220 mph (350 km/h) | 2030–2040 (estimate)[citation needed] | 705 km (438 mi) |
Texas Central Railway | Dallas–Houston | 205 mph (330 km/h) | 2026 (building contracts signed) | 390 km (240 mi) |
Brightline West | Victor Valley–Las Vegas | 200 mph (320 km/h) | 2024 (building contracts signed) | 270 km (170 mi) |
Maglev Lines
Northeast Maglev Has Planned.
Line name | Start and end points | Maximum speed | Planned opening | Length |
---|---|---|---|---|
Northeast Maglev | Baltimore–Washington, D.C. | 311 mph (501 km/h) | 2028 (estimated) | 64 km (40 mi) |
Uzbekistan
Upgraded lines
Line name | Start and end points | Maximum speed | Opening | Length |
---|---|---|---|---|
Tashkent–Samarkand high-speed rail line | Tashkent–Samarkand | 250 km/h (160 mph) | Brand launch 2011-10-08 as higher speed rail; full HSR operated since February 10, 2013 |
344 km (214 mi) |
Samarkand-Qarshi high-speed rail line | Samarkand–Qarshi | 250 km/h (160 mph) | August 22, 2015 | 141 km (88 mi) |
Samarkand–Bukhara high-speed rail line | Samarkand–Bukhara | 250 km/h (160 mph) | August 25, 2016 | 256 km (159 mi) |
References and notes
- ^ "General definitions of highspeed". Paris, France: International Union of Railways (UIC). July 28, 2014. Archived from the original on July 20, 2011. Retrieved April 17, 2015.
- ^ C. S. Papacostas; Panos D. Prevedouros (2001). Transportation engineering and planning. Pearson College Division. ISBN 978-0-13-081419-7.
- ^ "High Speed lines in the world". Paris, France: International Union of Railways, UIC. July 23, 2010. Retrieved April 17, 2015.
- ^ "High speed lines in the World" (PDF). Paris, France: International Union of Railways, UIC. April 20, 2018. Archived from the original (PDF) on May 25, 2018. Retrieved June 5, 2018.
- ^ "Le réseau des lignes de chemin de fer à grande vitesse en Europe" (PDF) (in French). Communauté d'intérêts pour les transports publics, section Vaud. May 2017. Retrieved June 5, 2018 – via citrap-vaud.ch.
- ^ https://www.thejakartapost.com/life/2019/07/03/china-first-in-the-world-for-high-speed-trains.html
- ^ a b "China Just Relaunched the World's Fastest Train". Fortune.com/. Retrieved September 1, 2017.
- ^ in 2011–2017 period the limit have been decreased from 350 to 300 and from 250 to at all tracks after train crash
- ^ Include 3,000+ kilometers of mixed passenger & freight line, exclude 30 km of Shanghai Maglev
- ^ https://asia.nikkei.com/Business/Transportation/China-charges-full-speed-ahead-on-bullet-train-expansion
- ^ "High-speed rail in Europe". March 9, 2019. Retrieved March 13, 2019 – via Wikipedia.
- ^ connected with classic wide-gauge mainlines by gauge-change technology
- ^ https://www.statista.com/statistics/451818/length-of-high-speed-railway-lines-in-use-in-europe-by-country/
- ^ 574.8 km/h record
- ^ exclude 42.8 km of Yamanashi test track to start demonstrating operation for tourists in 2020
- ^ including Maglev under construction
- ^ to be sped-up to 360 km/h in next few years, unconventional lines under construction will be even faster
- ^ different from classic narrower lines
- ^ "High-Speed Rail Passenger Traffic Density Statistics" (PDF). Publicpolicy-yhs.wikispaces.com. Retrieved August 21, 2017.
- ^ 250 km/h ready; 205 km/h are permitted when 200 km/h trains are in delay
- ^ 400 km/h under construction. Some lines will be sped-up from 200 to 225 km/h after re-signaling; East Coast Mainline trains are permitted to go at 225 km/h instead of 200 km/h in case of delay
- ^ http://www.rfi.it/rfi/LINEE-STAZIONI-TERRITORIO/Istantanea-sulla-rete/La-rete-oggi#2
- ^ to be sped-up to 360 km/h in next few years
- ^ 300 km/h under construction
- ^ rolling stock is ready to be used at 1520 mm-network abroad
- ^ possible extension to China via Kazakhstan would add 2000 km
- ^ 400 km/h under planning; 250 km/h at short part of route; most of tracks are 140–200 km/h
- ^ at some stretches, upgrading of others is still going on
- ^ GCT (January 30, 2019). "Athens to Thessaloniki high-speed train line is now open". Greek City Times. Retrieved March 13, 2019.
- ^ a b 200–239 km/h is not high-speed by American classification
- ^ a b 260 km/h since 2019
- ^ Ltd, DVV Media International. "Africa's first high speed line inaugurated". Railway Gazette. Retrieved March 13, 2019.
- ^ 1,500 km total under planning
- ^ international services only, local high-speed trains were failed to launch
- ^ a b https://www.nfra.gov.au/projects
- ^ Including ones to be under construction next 1 year
- ^ https://railpage.com.au/news/s/tehran--mashhad-electrification-loan-signed
- ^ "19 rail projects to watch in 2019".
- ^ https://constructionreviewonline.com/2020/09/egypt-awards-contract-for-ain-sokhna-el-alamein-high-speed-train-project/
- ^ "Ж/д тоннель Таллин — Хельсинки под Балтикой могут построить в 2024–м". rus.lsm.lv. Retrieved March 13, 2019.
- ^ https://asiatimes.com/2020/08/china-sets-railway-building-spree-in-high-speed-motion/
- ^ a b "Ligne a Grande Vitesse Mediterranee (LN5)" (PDF). rail21.pagesperso-orange.fr. Retrieved February 26, 2020.
- ^ limited by rolling stock maximum operating speed
- ^ (fr) Daily count of the Franco-Italian tunnel's length dug from French side, on telt-sas.com.
- ^ (fr) Decree of 23 August 2013 déclarant d'utilité publique et urgents les travaux nécessaires à la réalisation de l'itinéraire d'accès au tunnel Franco-italien de la liaison ferroviaire Lyon-Turin, on legifrance.gouv.fr.
- ^ a b c d e "RAIL21–Le réseau SNCF". rail21.pagesperso-orange.fr. Retrieved February 26, 2020.
- ^ https://books.google.ee/books?id=ZuKO5CY4udEC&pg=PA33&lpg=PA33&dq=CHANNELTUNNEL+200+KM/H&source=bl&ots=dugmpsBhud&sig=ACfU3U0yiNdTx7ROAoOJRRtZq9hm-x1dIw&hl=et&sa=X&ved=2ahUKEwib7cLbsYfmAhXys4sKHeEWBq8Q6AEwEHoECAkQAQ#v=onepage&q=CHANNELTUNNEL%20200%20KM%2FH&f=false
- ^ a b "Angebot auf der Filstalbahn soll weiterentwickelt werden" (in German). Baden–Württemberg state government. April 17, 2020. Retrieved June 20, 2020.
- ^ "Neubaustrecke Karlsruhe–Basel (aktueller Stand)–Karl Brodowskys Blog". karl.brodowsky.com. Retrieved October 24, 2018.
- ^ https://www.metrorailnews.in/centres-green-signal-for-thiruvananthapuram-kasaragod-high-speed-rail-corridor-soon/
- ^ "RFI awards EUR 1.6 billion contract under Brescia-Verona HSR project". Railwaypro.com. June 12, 2018. Retrieved October 24, 2018.
- ^ a b Eiraku, Maiko. "New bullet train shooting for slice of air travel market–NHK NEWSLINE–News–NHK WORLD" – via www3.nhk.or.jp.
- ^ https://www.railjournal.com/passenger/high-speed/jr-east-275km-h-joetsu-shinkansen/
- ^ "Follo Line faces delay and cost escalation after contract cancellation". railjournal.com. January 28, 2019. Retrieved March 13, 2019.
- ^ a b c "Wykaz maksymalnych prędkości–składy wagonowe" (PDF). Plk-sa.pl. Retrieved October 24, 2018.
- ^ "중앙선 원주~제천 복선전철 착공…시속 110㎞→250㎞". News.naver.com. Retrieved August 21, 2017.
- ^ a b Fran Hurtado (December 15, 2015). "El AVE Madrid-Zamora se estrena este jueves sin actos inaugurales". noticias.lainformacion.com. Retrieved December 23, 2015.
- ^ "Infraestructuras y Estaciones. Líneas de Alta Velocidad". Adif. Archived from the original on July 1, 2011.
- ^ "Fase final de las obras del Eje Atlántico y de la nueva estación de Vigo-Urzáiz". fomento.gob.es. March 30, 2015. Retrieved November 20, 2015.
- ^ C. Prego (April 15, 2015). "Renfe estrena el Eje Atlántico el sábado con una rebaja del 50% en las tarifas". La Opinion A Coruña. Retrieved November 23, 2015.
- ^ DVV Media UK. "High speed line opens between Barcelona and Figueres". Railway Gazette.
- ^ Fernando Puente. "Barcelona–Figueres HS line to open January 7". railjournal.com.
- ^ Today's railways Europe, issue 202, page 41, timetable news
- ^ shuttle + TGV Archived December 4, 2013, at the Wayback Machine Spanish railways website
- ^ Joan Miró Trenhotel Archived December 4, 2013, at the Wayback Machine Spanish railways website
- ^ "AVE rail connection between Barcelona and Paris to open in December". thinkspain.com.
- ^ "Los Reyes inaugurarán el AVE a Valencia, y los Príncipes la conexión a Albacete". Europa Press (in Spanish). December 10, 2010. Archived from the original on April 10, 2014.
- ^ "Fomento culmina la obra de alta velocidad entre Sevilla y Cádiz". lavozdigital.es (in Spanish).
- ^ "Rajoy destaca que el AVE llegará a Burgos este año y el tramo a Vitoria estará en 2019". diariodeburgos.es (in Spanish). May 17, 2015.
- ^ "Las obras del tramo Grañena-Jaén de la Línea de Alta Velocidad se reanudan y se espera que acaben a final de 2018".
- ^ Pozo, Raúl (August 23, 2017). "Infraestructuras–El AVE a Extremadura se eterniza: Fomento encarga ahora el estudio para el tramo Madrid-Cáceres". Vozpópuli.
- ^ DVV Media UK. "Boring begins beneath Madrid". Railway Gazette.
- ^ "Fomento presenta obras para agilizar en Madrid tráfico de AVE a la Comunitat". La Vanguardia (in Spanish). Retrieved August 24, 2017.
- ^ "High speed lines Madrid-Galicia line Zamora-Lubián–Ourense and Ourense-Santiago". ADIF. Archived from the original on September 23, 2010. Retrieved September 24, 2010.
- ^ "High-Speed Lines León — Palencia Line". ADIF. Archived from the original on September 23, 2010. Retrieved September 24, 2010.
- ^ "High Speed Lines Leon — Asturias high speed line". ADIF. Archived from the original on September 23, 2010. Retrieved September 24, 2010.
- ^ "New AVE high speed train service to Palencia and Leon opens". ADIF. September 29, 2015. Retrieved October 1, 2015.
- ^ "High-Speed Lines Valladolid — Burgos — Vitoria Line". ADIF. Archived from the original on September 23, 2010. Retrieved September 24, 2010.
- ^ "High Speed Lines Vitoria — Bilbao — San Sebastián Line". ADIF. Archived from the original on September 23, 2010. Retrieved September 24, 2010.
- ^ Comorera, Ramon (March 12, 2012). "Doble aislante de vibraciones en las obras de Gaudí" [Double Isolation of Vibrations at the Gaudí constructions]. El Periódico de Catalunya (in Spanish). Retrieved March 12, 2012.
- ^ Map of the tunnel route and details if the railway equipment in the tunnel in a PDF in El Periodico
- ^ "Líneas de alta velocidad, Línea Madrid–Castilla La Mancha–Comunidad Valenciana–Región de Murcia". ADIF. Retrieved January 26, 2018.
- ^ Europa Press (December 10, 2010). "Diplomáticos y periodistas extranjeros conocen el AVE a Valencia en un viaje de simulación". europapress.es.
- ^ "Railway Gazette: Madrid — Valencia high speed line opening dates confirmed". Retrieved October 16, 2010.
- ^ "The new HSL between Albacete and Alicante opened on June the 18th (translation)" (PDF). formento.es (in Spanish).
- ^ Pablo García (January 22, 2018). "Una avería para en Sagunto el AVE Madrid-Castellón en su estreno con Rajoy a bordo". El Independiente.
- ^ "High-speed Lines Antequera — Granada". ADIF. Archived from the original on September 23, 2010. Retrieved September 24, 2010.
- ^ "3 horas y 35 minutos de Huelva a Almería". juntadeandalucia.es. January 22, 2010. Retrieved January 13, 2016.
- ^ high-speed Barcelona-Figueres section
- ^ "Nîmes–Montpellier bypass carries first freight". Railway Gazette International. December 13, 2017.
- ^ "The Mediterranean Rail Corridor will be a reality in 2020". Catalan news agency. March 17, 2011. Retrieved October 30, 2015.
- ^ a b "High Speed Lines Madrid — Extremadura — Portuguese Border line". ADIF. Archived from the original on September 23, 2010. Retrieved September 24, 2010.
- ^ "Alta Velocidade em Síntese" (in Portuguese). Rave.pt. Archived from the original on October 4, 2010. Retrieved September 24, 2010.
- ^ "Pointers December 2009". Railway Gazette International. London. December 6, 2009. Retrieved September 24, 2010.
- ^ "Portugal's cutbacks halt high-speed train to Spain". The Guardian. London. July 5, 2011. Retrieved October 27, 2011.
- ^ "High speed programme axed". Railwaygazette.com. Retrieved November 11, 2015.
- ^ "ESI funds to improve Madrid–Lisboa connection". Retrieved April 14, 2017.
- ^ "Almonte River Viaduct".. Structurae.
- ^ Arribas, David. Closing the Mouth. Roads & Bridges, Arlington Heights, Illinois. September 6, 2016.
- ^ https://www.trafikverket.se/contentassets/8f6338585468400693657821e2d178d0/221_gimonas_till_sundsvall_190923.pdf Ånges linjebok–221 Gimonäs till Sundsvall]
- ^ "Constructing the HS2 railway". Government of the United Kingdom. Retrieved October 24, 2018.
- ^ tilting trains only
- ^ https://books.google.ee/books?id=ZuKO5CY4udEC&pg=PA33&lpg=PA33&dq=CHANNELTUNNEL+200+KM/H&source=bl&ots=dugmpsBhud&sig=ACfU3U0yiNdTx7ROAoOJRRtZq9hm-x1dIw&hl=et&sa=X&ved=2ahUKEwib7cLbsYfmAhXys4sKHeEWBq8Q6AEwEHoECAkQAQ#v=onepage&q=CHANNELTUNNEL%20200%20KM%2FH&f=false
- ^ "Caltrain/California HSR Blended Operations Analysis" (PDF). Caltrain.com. LTK Engineering Services. Retrieved November 13, 2016.
- ^ "San Francisco to San Jose Project Section Draft Environmental Impact Report/Environmental Impact Statement Volume 1 Chapter 2" (PDF). CHSRA. July 2020. p. 2-5. Retrieved July 20, 2020.
- ^ a b Thadani, Trisha (July 10, 2020). "Plan for high-speed rail rolls out for San Francisco to San Jose–but with little cash". San Francisco Chronicle. Retrieved July 12, 2020.