Jump to content

Collgar Wind Farm

Coordinates: 31°32′35″S 118°27′16″E / 31.5430556°S 118.4545833°E / -31.5430556; 118.4545833
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by DiamondIIIXX (talk | contribs) at 22:35, 2 January 2021 (Operations: Added values for 2011, general infobox improvements). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Collgar Wind Farm
Collgar Wind Farm in 2019
Map
Collgar Wind Farm in Australia
CountryAustralia
LocationNear Merredin
Coordinates31°32′35″S 118°27′16″E / 31.5430556°S 118.4545833°E / -31.5430556; 118.4545833
StatusOperational
Construction beganJune 2010
Commission dateMarch 2012 (2012-03)
Construction costA$750m
OwnerRetail Employees Superannuation Trust
Wind farm
TypeOnshore
Hub height80 metres (262 ft)
Rotor diameter90 metres (295 ft)
Power generation
Units operational111 × 2.0 MW
Make and modelVestas V90-2MW
Nameplate capacity222 MW
Capacity factor38.1% (estimated)
Annual net output740 GWh (current)
External links
Website[www.collgarwindfarm.com.au]

Collgar Wind Farm is a wind farm located approximately 25 kilometres south-east of Merredin, Western Australia.[1] With 111 Vestas V90-2MW wind turbines built in the first stage,[2][3] and a total capacity of 222 MW,[4] it is expected to generate 720 GWh on average per year over the life of the project.[1] It became fully operational in October 2011.[5]

History

Feasibility studies were carried out between 2006 and 2008, and planning approval was granted in September 2008. In March 2010 Collgar Wind Farm Pty Ltd was sold to UBS International Infrastructure Fund and Retail Employees Superannuation Trust. Construction began in June 2010,[5] the wind farm was connected to the grid in April 2011,[1] and the first 50 turbines started operation in May 2011.[3][6] The wind farm became fully operational in October 2011.[5]

Operations

AEMO records begin in June 2011 for the wind farm. The generation table uses AEMO Facility SCADA to obtain generation values for each month. Collgar's code is INVESTEC_COLLGAR_WF1, so that is used as part of a SUMIF operation (shown below) on the table to get the total.

=SUMIF(E2:E Last Row,"*INVESTEC_COLLGAR_WF1*",F2:F Last Row)
Collgar Wind Farm Generation (MWh)
Year Total Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2011 287,225 N/A N/A N/A N/A N/A 14,614 26,360 31,306 46,699 53,002 58,121 57,123
2012
2013
2014
2015
2016
2017
2018
2019
2020

Note: Asterisk indicates power output was limited during the month.

See also

References

  1. ^ a b c Quinn, Russell: WA's biggest wind farm is now online Archived 18 April 2011 at the Wayback Machine, in Perth Now, 15 April 2011
  2. ^ Collgar Wind Farm: Site location and layout, retrieved 12 May 2011
  3. ^ a b Merredin Mercury: First power generated, 11 May 2011
  4. ^ Collgar fact sheet[permanent dead link], retrieved 12 May 2011
  5. ^ a b c Collgar Wind Warm: "History", retrieved 11 December 2012
  6. ^ Giant WA wind farm spins up a storm in the Australian Financial Review, 12 May 2011