Jump to content

Hi Tower

Coordinates: 32°04′49″N 34°48′03″E / 32.08025°N 34.80081°E / 32.08025; 34.80081
From Wikipedia, the free encyclopedia
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Hi Tower
מגדל Hi Tower (Hebrew)
Map
General information
StatusUnder construction
TypeResidential
LocationGivatayim, Israel
Address10 Ariel Sharon Street, Givatayim, Israel
Coordinates32°04′49″N 34°48′03″E / 32.08025°N 34.80081°E / 32.08025; 34.80081
Construction started2017
Completed2024 (scheduled)
Height
Roof226.7 m (744 ft)[1]
Technical details
Structural systemConcrete
Floor count60 (+3 underground)
Floor area55,500 m2 (597,000 sq ft)
Design and construction
Architect(s)Yashar Architects
Structural engineerDavid Engineers
Main contractorASHTROM GROUP LTD

The Hi Tower (Hebrew: מגדל Hi Tower) is a residential skyscraper under construction in Givatayim, Israel. The tower's construction was started in 2017 and is scheduled to be completed in 2024. The tower stands at 226.7 m (744 ft) with 60 floors and is the current third tallest building in Israel.[2]

History

The building has 60 floors. The first levels house a lobby floor, a gallery floor and a welfare floor, above which are 55 residential floors displaying a total of 279 apartment units, and two additional technical floors at the top of the tower. Also, there are about 5 underground floors that will be used for parking. The tower sits together with the neighboring HaShahar Tower on a ramp raised from the street level below.[3]

The tower was designed by Ishar Architects as part of the city complex that will include several other skyscrapers, and will integrate as a high-rise building sequence with the Diamond Exchange District in Ramat Gan and Yigal Alon Street in Tel Aviv. The promoters of the project are the businessman and real estate broker Roni Mana and the G-Group led by the businessman Guy Blushinsky. The Ashstrom Group is responsible for its execution.[4]

At the beginning of 2022 it reached its final height, becoming the third tallest skyscraper in Israel and the tallest tower in Givatayim. It also holds the title of being the tallest residential tower in Israel. Its height from the main entrance floor to the edge of the roof is 220 meters. In accordance with the RTA requirement, upon its completion, a warning lighting system for aircraft was installed on the roof. The tower has a fitness center and a spa center.[5]

Architecture

The construction of the tower began in March 2016 and ended in 2023. However, in September 2023, it was announced that although the construction of the tower was completed, the municipality of Givatayim does not approve its occupancy due to non-compliance with safety requirements. The building received an occupancy permit for the summer of 2024 and was occupied for the first time in July of that year.[6]

See also

References

  1. ^ "Hi Tower". CTBUH Skyscraper Center. Retrieved 22 November 2024.
  2. ^ "Hi Tower". yashararch.com. Yashar Architects. Retrieved November 22, 2024.
  3. ^ "Hi Tower". dahangroup.co.il. Dahan Group. Retrieved November 22, 2024.
  4. ^ Nahum-Halevi, Ranit (September 19, 2023). "A dispute of tens of millions of shekels is preventing business leaders from entering the Hi-Tower project". themarker.com (in Hebrew). TheMarker. Retrieved November 22, 2024.
  5. ^ Nahum-Halevi, Ranit (November 9, 2023). "In the background of the war: the municipality of Givatayim will allow the occupancy of the luxury Hi Tower project". themarker.com (in Hebrew). TheMarker. Retrieved November 22, 2024.
  6. ^ Ofer Petersburg & Hila Zion (March 17, 2016). "Construction of a high tower in the City of Givatayim has begun". ynet.co.il (in Hebrew). Retrieved November 22, 2024.