Jump to content

List of Beijing Subway stations

From Wikipedia, the free encyclopedia
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Map of Beijing Subway

The following is a list of stations found within the Beijing Subway.

Stations opened after 2007 have no official station codes.

Line 1 and Batong Line

Since August 29, 2021, through services have operated between Line 1 and Batong Line, so the lines are effectively operated as a single line.

Yuquan Lu station platform
Jianguomen station platform
Dawang Lu station platform
Sihui station platform
Jiukeshu station eastbound platform
Stations of Line 1 and Batong Line
Code Station Chinese name Location Transfers Platform type Grade Opened
101 53#
(Restricted)
53号 Shijingshan Split Underground Not operational
102 Fushouling
(Restricted)
福寿岭 Side Underground
103 Pingguoyuan 苹果园 Side Underground 23 April 1973[1]
104 Gucheng 古城 Side Underground 7 November 1971[1]
105 Bajiao Amusement Park 八角游乐园 Side Underground
106 Babaoshan 八宝山 Island Underground
107 Yuquan Lu 玉泉路 Island Underground 5 August 1971[1]
108 Wukesong 五棵松 Haidian Island Underground
109 Wanshou Lu 万寿路 Island Underground
110 Gongzhufen 公主坟  10  Island Underground 15 January 1971[1]
111 Military Museum 军事博物馆  9  Island Underground
112 Muxidi 木樨地 Xicheng  16  (out-of-system interchange) Island Underground
113 Nanlishi Lu 南礼士路 Island Underground
114 Fuxingmen 复兴门  2 
 19  (Out-of-system interchange via Taipingqiao)[2]
Island Underground 28 December 1987[3]
115 Xidan 西单  4  Island Underground 12 December 1992[4]
116 Tian'anmenxi 天安门西 Island Underground 28 September 1999[4]
117 Tian'anmendong 天安门东 Dongcheng Island Underground
118 Wangfujing 王府井  8  Island Underground
119 Dongdan 东单  5  Island Underground
120 Jianguomen 建国门  2  Island Underground
121 Yong'anli 永安里 Chaoyang Island Underground
122 Guomao 国贸  10  Island Underground
123 Dawang Lu 大望路  14  Island Underground
124/BT01 Sihui 四惠 Island At-grade
125/BT02 Sihuidong 四惠东 Side At-grade
BT03 Gaobeidian 高碑店 Side Elevated 27 December 2003[5]
BT04 Communication Univ. of China 传媒大学 Side At-grade
BT05 Shuangqiao 双桥 Side Elevated
BT06 Guaanzhuang 管庄 Side Elevated
BT07 Baliqiao 八里桥 Side Elevated
BT08 Tongzhou Beiyuan 通州北苑 Tongzhou Side Elevated
BT09 Guoyuan 果园 Side Elevated
BT10 Jiukeshu 九棵树 Side Elevated
BT11 Liyuan 梨园 Side Elevated
BT12 Linheli 临河里 Side Elevated
BT13 Tuqiao 土桥 Side Elevated
[a] Huazhuang 花庄  7  Dual-island Underground 28 December 2019[6]
[a] Universal Resort 环球度假区  7  Dual-island Underground 26 August 2021[7]

Line 2

Chegongzhuang station platform
Hepingmen station platform
Stations of Line 2
Code Station Chinese name Location Transfers Platform type Grade Opened
— ↑ towards Jishuitan ↑ —
201 Xizhimen 西直门 Xicheng  4   13  Huairou–Miyun
China Railway Beijing North
Island Underground 20 September 1984[3]
202 Chegongzhuang 车公庄  6  Island Underground
203 Fuchengmen 阜成门 Island Underground
204 Fuxingmen 复兴门  1 
 19  (Out-of-system interchange via Taipingqiao)[2]
Island Underground
205 Changchun Jie 长椿街 Island Underground 15 January 1971[1]
206 Xuanwumen 宣武门  4  Island Underground
207 Hepingmen 和平门 Island Underground
208 Qianmen 前门 Dongcheng  8  Island Underground
209 Chongwenmen 崇文门  5  Island Underground
210 Beijing railway station 北京站 Sub-Central
China Railway Beijing
Island Underground
211 Jianguomen 建国门 Dongcheng/Chaoyang  1  Island Underground 20 September 1984[3]
212 Chaoyangmen 朝阳门  6  Island Underground
213 Dongsi Shitiao 东四十条 Dongcheng Island Underground
214 Dongzhimen 东直门  13   Capital Airport  Island Underground
215 Yonghegong Lama Temple 雍和宫  5  Island Underground
216 Andingmen 安定门 Island Underground
217 Gulou Dajie 鼓楼大街 Dongcheng/Xicheng  8  Island Underground
218 Jishuitan 积水潭 Xicheng  19  Island Underground
— ↓ towards Xizhimen ↓ —

Line 4 and Daxing Line

Through services operate on Line 4 and Daxing Line.

Beigongmen station platform
Majiapu station platform
Stations of Line 4
Station Chinese name Location Transfers Platform type Grade Opened
Anheqiaobei 安河桥北 Haidian Side/island hybrid At-grade 28 September 2009[8]
Beigongmen 北宫门 Island Underground
Xiyuan 西苑  16  Island Underground
Yuanmingyuan Park 圆明园 Island Underground
Peking Univ. East Gate 北京大学东门 Island Underground
Zhongguancun 中关村 Island Underground
Haidian Huangzhuang 海淀黄庄  10  Island Underground
Renmin Daxue (Renmin Univ.) 人民大学 Island Underground
Weigongcun 魏公村 Island Underground
National Library 国家图书馆  9   16  Dual-island Underground
Beijing Zoo 动物园 Island Underground
Xizhimen 西直门 Xicheng  2   13  Huairou–Miyun
China Railway Beijing North
Island Underground
Xinjiekou 新街口 Island Underground
Ping'anli 平安里  6   19  Island Underground
Xisi 西四 Island Underground
Lingjing Hutong 灵境胡同 Island Underground
Xidan 西单  1  Island Underground
Xuanwumen 宣武门  2  Island Underground
Caishikou 菜市口  7  Island Underground
Taoranting 陶然亭 Island Underground
Beijing South railway station 北京南站 Fengtai  14 
China Railway Beijing South
Island Underground
Majiapu 马家堡 Island Underground
Jiaomenxi 角门西  10  Island Underground
Gongyi Xiqiao 公益西桥 Dual-island Underground
Xingong 新宫  19  Dual-island Underground 30 December 2010[9]
Xihongmen 西红门 Daxing Side Elevated
Gaomidianbei 高米店北 Island Underground
Gaomidiannan 高米店南 Island Underground
Zaoyuan 枣园 Island Underground
Qingyuan Lu 清源路 Island Underground
Huangcun Xidajie 黄村西大街 Island Underground
Huangcun railway station 黄村火车站 China Railway Huangcun
China Railway Beijing Daxing
Island Underground
Yihezhuang 义和庄 Island Underground
Biomedical Base 生物医药基地 Island Underground
Tiangongyuan 天宫院 Island Underground

Line 5

Puhuangyu station platform
Liushuiqiaonan station southbound platform
Stations of Line 5
Station Chinese name Location Transfers Platform type Grade Opened
Songjiazhuang 宋家庄 Fengtai  Yizhuang   10  Side Underground 7 October 2007[10]
Liujiayao 刘家窑 Island Underground
Puhuangyu 蒲黄榆  14  Island Underground
Temple of Heaven East Gate 天坛东门 Dongcheng Island Underground
Ciqikou 磁器口  7  Island Underground
Chongwenmen 崇文门  2  Island Underground
Dongdan 东单  1  Island Underground
Dengshikou 灯市口 Island Underground
Dongsi 东四  6  Island Underground
Zhangzizhong Lu 张自忠路 Island Underground
Beixinqiao 北新桥  Capital Airport  Island Underground
Yonghegong Lama Temple 雍和宫  2  Island Underground
Hepingli Beijie 和平里北街 Island Underground
Heping Xiqiao 和平西桥 Chaoyang Island Underground
Huixin Xijie Nankou 惠新西街南口  10  Island Underground
Huixin Xijie Beikou 惠新西街北口 Side Underground
Datunludong 大屯路东  15  Side Elevated
Beiyuanlubei 北苑路北 Side Elevated
Lishuiqiaonan 立水桥南 Side Elevated
Lishuiqiao 立水桥  13  Side At-grade
Tiantongyuannan 天通苑南 Changping Side Elevated
Tiantongyuan 天通苑 Side Elevated
Tiantongyuanbei 天通苑北 Side Elevated

Line 6

Xihuangcun station platform
Erligou station eastbound platform
Chegongzhuangxi station platform
Beiyunhexi station platform
Beiyunhedong station platform
Stations of Line 6
Station Chinese name Location Transfers Platform type Grade Opened
Jin'anqiao 金安桥 Shijingshan  11   S1  Island Underground 30 December 2018[11]
Pingguoyuan 苹果园  S1  Island Underground 31 December 2021[12]
Yangzhuang 杨庄 Island Underground 30 December 2018[11]
Xihuangcun 西黄村 Island Underground
Liaogongzhuang 廖公庄 Haidian Island Underground
Tiancun 田村 Island Underground
Haidian Wuluju 海淀五路居 Island Underground 30 December 2012[13]
Cishousi 慈寿寺  10  Island Underground
Huayuanqiao 花园桥 Island Underground
Baishiqiaonan 白石桥南  9  Island Underground
Erligou 二里沟 Haidian/Xicheng  16  Side Underground 18 March 2023[14]
Chegongzhuangxi 车公庄西 Xicheng Split Underground 30 December 2012[13]
Chegongzhuang 车公庄  2  Split Underground
Ping'anli 平安里  4   19  Island Underground
Beihaibei 北海北 Island Underground
Nanluogu Xiang 南锣鼓巷 Dongcheng  8  Split Underground
Dongsi 东四  5  Island Underground
Chaoyangmen 朝阳门 Dongcheng/Chaoyang  2  Island Underground
Dongdaqiao 东大桥 Chaoyang Island Underground
Hujialou 呼家楼  10  Side Underground
Jintai Lu 金台路  14  Island Underground
Shilipu 十里堡 Island Underground
Qingnian Lu 青年路 Island Underground
Dalianpo 褡裢坡 Island Underground
Huangqu 黄渠 Island Underground
Changying 常营 Dual-Island Underground
Caofang 草房 Island Underground
Wuzi Xueyuan Lu 物资学院路 Tongzhou Island Underground 28 December 2014[15]
Tongzhou Beiguan 通州北关 Island Underground
Tongyunmen 通运门 Dual-Island Underground 2024 (Planned)[16]
Beiyunhexi 北运河西 Island Underground 28 December 2014[15]
Beiyunhedong 北运河东 Island Underground 30 December 2018[17]
Haojiafu 郝家府 Island Underground 28 December 2014[15]
Dongxiayuan 东夏园 Island Underground
Lucheng 潞城 Island Underground

Line 7

Huagong station platform
Heizhuanghu station platform
Stations of Line 7
Station Chinese name Location Transfers Platform type Grade Opened
Beijing West railway station 北京西站 Fengtai  9  Sub-Central
China Railway
Beijing West
Dual-Island Underground 28 December 2014[15]
Wanzi 湾子 Xicheng Side Underground
Daguanying 达官营  16  Island Underground
Guang'anmennei 广安门内  19  (Out-of-system interchange via Niujie)[2] Island Underground
Caishikou 菜市口  4  Island Underground
Hufangqiao 虎坊桥 Island Underground
Zhushikou 珠市口 Dongcheng/Xicheng  8  Island Underground
Qiaowan 桥湾 Dongcheng Island Underground
Ciqikou 磁器口  5  Island Underground
Guangqumennei 广渠门内 Island Underground
Guangqumenwai 广渠门外 Dongcheng/Chaoyang Island Underground
Shuangjing 双井 Chaoyang  10  Island Underground 28 December 2019[6]
Jiulongshan 九龙山  14  Island Underground 28 December 2014[15]
Dajiaoting 大郊亭 Island Underground
Baiziwan 百子湾 Island Underground
Huagong 化工 Island Underground
Nanlouzizhuang 南楼梓庄 Island Underground
Happy Valley 欢乐谷景区 Island Underground
Fatou 垡头 Island Underground 30 December 2018[17]
Shuanghe 双合 Dual-Island Underground 28 December 2014[15]
Jiaohuachang 焦化厂 Side Underground
Huangchang 黄厂 Island Underground 28 December 2019[6]
Langxinzhuang 郎辛庄 Island Underground
Heizhuanghu 黑庄户 Island Underground
Wanshengxi 万盛西 Tongzhou Island Underground
Wanshengdong 万盛东 Island Underground
Qunfang 群芳 Island Underground
Gaoloujin 高楼金 Dual-Island Underground
Huazhuang 花庄  Batong  Dual-Island Underground
Universal Resort 环球度假区  Batong  Dual-Island Underground 26 August 2021[7]

Line 8

Pingxifu station southbound platform
Olympic Sports Center station platform
Anhuaqiao station platform
Muxiyuan station platform
Yinghai station platform
Stations of Line 8 (North section)
Station Chinese name Location Transfers Platform type Grade Opened
Zhuxinzhuang 朱辛庄 Changping  Changping  Cross-platform Elevated 28 December 2013[18]
Yuzhi Lu 育知路 Side Underground
Pingxifu 平西府 Side Underground
Huilongguan Dongdajie 回龙观东大街 Island Underground 31 December 2011[19]
Huoying 霍营  13  S2
China Railway Huangtudian
Island Underground
Yuxin 育新 Changping/Haidian Island Underground
Xixiaokou 西小口 Haidian Island Underground
Yongtaizhuang 永泰庄 Island Underground
Lincuiqiao 林萃桥 Chaoyang Island Underground
Forest Park South Gate 森林公园南门 Island Underground 19 July 2008[20]
Olympic Park 奥林匹克公园  15  Island Underground
Olympic Sports Center 奥体中心 Island Underground 10 October 2008[21]
Beitucheng 北土城  10  Island Underground 19 July 2008[20]
Anhua Qiao 安华桥 Xicheng/Chaoyang Island Underground 30 December 2012[13]
Andeli Beijie 安德里北街 Dongcheng Island Underground 26 December 2015[22]
Gulou Dajie 鼓楼大街 Dongcheng/Xicheng  2  Island Underground 30 December 2012[13]
Shichahai 什刹海 Island Underground 28 December 2013[18]
Nanluogu Xiang 南锣鼓巷 Dongcheng  6  Split (Cross-platform) Underground
National Art Museum 中国美术馆 Split Underground 30 December 2018[17]
Jinyu Hutong 金鱼胡同 Island Underground 31 December 2021[23]
Wangfujing 王府井  1  Island Underground
Qianmen 前门  2  Island Underground
Zhushikou 珠市口 Dongcheng/Xicheng  7  Island Underground 30 December 2018[11]
Tianqiao 天桥 Island Underground
Yongdingmenwai 永定门外 Dongcheng  14  Island Underground
Muxiyuan 木樨园 Island Underground
Haihutun 海户屯 Fengtai Island Underground
Dahongmen 大红门  10  Island Underground Late 2024[24]
Dahongmennan 大红门南 Island Underground 30 December 2018[11]
Heyi 和义 Island Underground
Donggaodi 东高地 Island Underground
Huojian Wanyuan 火箭万源 Island Underground
Wufutang 五福堂 Daxing Island Underground
Demao 德茂 Island Elevated
Yinghai 瀛海 Island Elevated

Line 9

Fengtai Science Park station platform
Stations of Line 9
Station Chinese name Location Transfers Platform type Grade Opened
National Library 国家图书馆 Haidian  4   16  Dual-Island Underground 30 December 2012[13]
Baishiqiaonan 白石桥南  6  Island Underground
Baiduizi 白堆子 Island Underground
Military Museum 军事博物馆  1  Island Underground 21 December 2013[25]
Beijing West railway station 北京西站 Xicheng  7  Sub-Central
China Railway Beijing West
Dual-Island Underground 31 December 2011[19]
Liuliqiaodong 六里桥东 Fengtai Island Underground
Liuliqiao 六里桥  10  Side Underground
Qilizhuang 七里庄  14  Island Underground
Fengtai Dongdajie 丰台东大街 Island Underground 12 October 2012[26]
Fengtai Nanlu 丰台南路  16  Island Underground 31 December 2011[19]
Keyi Lu 科怡路 Island Underground
Fengtai Science Park 丰台科技园 Island Underground
Guogongzhuang 郭公庄  Fangshan  Dual-Island Underground

Line 10

Suzhou Jie station clockwise platform
Capital Univ. of Economics & Business station platform
Niwa station platform
Gongzhufen station platform
Stations of Line 10
Station Chinese name Location Transfers Platform type Grade Opened
— ↑ loop line – towards Huoqiying ↑ —
Bagou 巴沟 Haidian  Xijiao  Dual-island Underground 19 July 2008[20]
Suzhou Jie 苏州街 Side Underground
Haidian Huangzhuang 海淀黄庄  4  Side Underground
Zhichunli 知春里 Island Underground
Zhichun Lu 知春路  13  Split Underground
Xitucheng 西土城  Changping  Island Underground
Mudanyuan 牡丹园  19  Island Underground
Jiandemen 健德门 Haidian/Chaoyang Island Underground
Beitucheng 北土城 Chaoyang  8  Island Underground
Anzhenmen 安贞门 Side/island hybrid Underground
Huixin Xijie Nankou 惠新西街南口  5  Side Underground
Shaoyaoju 芍药居  13  Island Underground
Taiyanggong 太阳宫 Island Underground
Sanyuanqiao 三元桥  Capital Airport  Island Underground
Liangmaqiao 亮马桥 Island Underground
Agricultural Exhibition Center 农业展览馆 Island Underground
Tuanjiehu 团结湖 Split Underground
Hujialou 呼家楼  6  Split Underground
Jintai Xizhao 金台夕照 Split Underground
Guomao 国贸  1  Split Underground
Shuangjing 双井  7  Island Underground
Jingsong 劲松 Island Underground
Panjiayuan 潘家园 Island Underground 30 December 2012[13]
Shilihe 十里河  14   17  Island Underground
Fenzhongsi 分钟寺 Fengtai Island Underground
Chengshousi 成寿寺 Island Underground
Songjiazhuang 宋家庄  5   Yizhuang  Dual-Island Underground
Shiliuzhuang 石榴庄 Island Underground
Dahongmen 大红门 Island Underground
Jiaomendong 角门东 Island Underground 5 May 2013[27]
Jiaomenxi 角门西  4  Island Underground 30 December 2012[13]
Caoqiao 草桥  19   Daxing Airport  Island Underground
Jijiamiao 纪家庙 Island Underground
Capital Univ. of Economics & Business 首经贸  Fangshan  Island Underground
Fengtai railway station 丰台站  16 
China Railway Beijing Fengtai
Island Underground 5 May 2013[27]
Niwa 泥洼 Island Underground
Xiju 西局  14  Island Underground 30 December 2012[13]
Liuliqiao 六里桥  9  Island Underground
Lianhuaqiao 莲花桥 Haidian Island Underground
Gongzhufen 公主坟  1  Split Underground
Xidiaoyutai 西钓鱼台 Island Underground
Cishousi 慈寿寺  6  Island Underground
Chedaogou 车道沟 Island Underground
Changchun Qiao 长春桥 Island Underground
Huoqiying 火器营 Island Underground
— ↓ loop line – towards Bagou ↓ —

Line 11

Xinshougang (Shougang Park) station platform
Stations of Line 11
Station Chinese name Location Transfers Platform type Grade Opened
Moshikou 模式口 Shijingshan Side Underground 30 December 2023[28]
Jin'anqiao 金安桥  6   S1  Island Underground 31 December 2021[29]
Beixin'an 北辛安 Island Underground
Xinshougang (Shougang Park)[30] 新首钢 Island Underground

Line 13

Dazhongsi station southbound platform
Qinghe railway station platform
Beiyuan station eastbound platform
Stations of Line 13
Code Station Chinese name Location Transfers Platform type Grade Opened
1301 Xizhimen 西直门 Xicheng  2   4  Huairou–Miyun
Beijing North railway station Beijing North
Spanish solution Elevated 28 September 2002[5]
1302 Dazhong Si 大钟寺 Haidian Side Elevated
1303 Zhichun Lu 知春路  10  Side At-grade
1304 Wudaokou 五道口 Side Elevated
1305 Shangdi 上地 Side At-grade
[a] Qinghe railway station 清河站  Changping  Huairou–Miyun
Qinghe railway station Qinghe
Island At-grade 30 December 2019[31]
1306 Xi'erqi 西二旗  Changping  Side At-grade 25 December 2010 (new station)[32]
28 September 2002 (old station)[5]
1307 Longze 龙泽 Changping Side Elevated 28 September 2002[5]
1308 Huilongguan 回龙观 Side At-grade
1309 Huoying 霍营  8  S2
Huangtudian railway station Huangtudian
Side At-grade
1310 Lishuiqiao 立水桥 Chaoyang  5  Side Elevated 9 January 2003[5]
1311 Beiyuan 北苑 Side At-grade
1312 Wangjingxi 望京西  15  Side At-grade
1313 Shaoyaoju 芍药居  10  Side At-grade
1314 Guangximen 光熙门 Side At-grade
1315 Liufang 柳芳 Side At-grade
1316 Dongzhimen 东直门 Dongcheng  2   Capital Airport  Side Underground

Line 14

Zhangguozhuang station platform
Jingtai station platform
Jiangtai station southbound platform
Stations of Line 14
Station Chinese name Location Transfers Platform type Grade Opened
Zhangguozhuang 张郭庄 Fengtai Side Elevated 5 May 2013[27]
Garden Expo Park 园博园 Side Elevated
Dawayao 大瓦窑 Island Underground
Guozhuangzi 郭庄子 Island Underground
Dajing 大井 Island Underground
Qilizhuang 七里庄  9  Split Underground 15 February 2014[33]
Xiju 西局  10  Island Underground 5 May 2013[27]
Dongguantou 东管头 Island Underground 31 December 2021[34]
Lize Shangwuqu 丽泽商务区 Island Underground
Caihuying 菜户营 Island Underground
Xitieying 西铁营 Island Underground
Jingfengmen 景风门  19  Island Underground
Beijing South railway station 北京南站  4 
China Railway Beijing South
Island Underground 26 December 2015[22]
Taoranqiao 陶然桥 Dongcheng Island Underground Not open
Yongdingmenwai 永定门外  8  Island Underground 26 December 2015[22]
Jingtai 景泰 Island Underground
Puhuangyu 蒲黄榆 Fengtai  5  Island Underground
Fangzhuang 方庄 Island Underground
Shilihe 十里河 Chaoyang  10   17  Island Underground
Beijing Univ. of Tech. West Gate 北工大西门 Island Underground
Pingleyuan 平乐园 Island Underground 30 December 2017[35]
Jiulongshan 九龙山  7  Island Underground 26 December 2015[22]
Dawang Lu 大望路  1  Island Underground
Hongmiao 红庙 Side Underground Not open
Jintai Lu 金台路  6  Island Underground 28 December 2014[15]
Chaoyang Park 朝阳公园 Island Underground 31 December 2016[36]
Zaoying 枣营 Island Underground 28 December 2014[15]
Dongfeng Beiqiao 东风北桥 Island Underground
Jiangtai 将台 Side Underground
Gaojiayuan 高家园 Side Underground Not open
Wangjingnan 望京南 Side Underground 28 December 2014[15]
Futong 阜通 Island Underground
Wangjing 望京  15  Island Underground
Donghuqu 东湖渠 Island Underground
Laiguangying 来广营 Island Underground
Shangezhuang 善各庄 Island Underground

Line 15

Liudaokou station platform
Sunhe station platform
Shunyi station platform
Stations of Line 15
Station Chinese name Location Transfers Platform type Grade Opened
Qinghua Donglu Xikou 清华东路西口 Haidian Side Underground 28 December 2014[15]
Liudaokou 六道口  Changping  Island Underground
Beishatan 北沙滩 Island Underground
Olympic Park 奥林匹克公园 Chaoyang  8  Island Underground
Anli Lu 安立路 Island Underground
Datunludong 大屯路东  5  Island Underground 26 December 2015[22]
Guanzhuang 关庄 Island Underground 28 December 2014[15]
Wangjingxi 望京西  13  Island Underground 30 December 2010[9]
Wangjing 望京  14  Island Underground
Wangjingdong 望京东 Island Underground 31 December 2016[36]
Cuigezhuang 崔各庄 Island Underground 30 December 2010[9]
Maquanying 马泉营 Dual-island Underground
Sunhe 孙河 Island Elevated
China Int'l Exhibition Center 国展 Shunyi Island Elevated
Hualikan 花梨坎 Island Elevated
Houshayu 后沙峪 Island Elevated
Nanfaxin 南法信 Island Half Underground 31 December 2011[19]
Shimen 石门 Island Underground
Shunyi 顺义 Island Underground
Fengbo 俸伯 Island Underground

Line 16

Tundian station platform
Suzhouqiao station platform
Erligou station southbound platform
Stations of Line 16
Station Chinese name Location Transfers Platform type Grade Opened
Bei'anhe 北安河 Haidian Island Underground 31 December 2016[36]
Wenyang Lu 温阳路 Island Underground
Daoxianghu Lu 稻香湖路 Island Underground
Tundian 屯佃 Island Underground
Yongfeng 永丰 Island Underground
Yongfengnan 永丰南 Island Underground
Xibeiwang 西北旺 Island Underground
Malianwa 马连洼 Island Underground
Nongda Nanlu 农大南路 Island Underground 30 December 2017[35]
Xiyuan 西苑  4  Island Underground 31 December 2016[36]
Wanquanheqiao 万泉河桥 Island Underground 31 December 2020[37]
Suzhou Jie 苏州街  10  Island Underground 30 December 2023[28]
Suzhou Qiao 苏州桥  12  (Opening soon) Side Underground 31 December 2020[37]
Wanshousi 万寿寺 Island Underground
National Library 国家图书馆  4   9  Island Underground
Erligou 二里沟 Haidian/Xicheng  6  Side Underground 18 March 2023[14]
Ganjiakou 甘家口 Island Underground 31 December 2020[37]
Yuyuantan Dongmen (Yuyuantan Park East Gate) 玉渊潭东门 Island Underground 31 December 2021[38]
Muxidi 木樨地 Haidian  1  (out-of-system interchange) Island Underground 31 December 2022[39]
Daguanying 达官营 Xicheng  7  Island Underground
Honglian Nanlu 红莲南路 Island Underground
Lize Shangwuqu 丽泽商务区 Fengtai  14  Island Underground Not open
Dongguantounan 东管头南  Fangshan  Island Underground 31 December 2022[39]
Fengtai railway station 丰台站  10 
China Railway Beijing Fengtai
Island Underground
Fengtai Nanlu 丰台南路  9  Island Underground
Fufengqiao 富丰桥 Island Underground
Kandan 看丹 Island Underground
Yushuzhuang 榆树庄 Side Underground
Hongtaizhuang 洪泰庄 Island Underground 30 December 2023[28]
Wanpingcheng 宛平城 Island Underground

Line 17

Shilihe station platform
Stations of Line 17
Station Chinese name Location Transfers Platform type Grade Opened
North section
Future Science City North 未来科学城北 Changping Island Underground 30 December 2023[28]
Future Science City 未来科学城 Island Underground
Tiantongyuandong 天通苑东 Dual-island Underground
Qingheying 清河营 Chaoyang Island Underground
Hongjunying 红军营 Island Underground
Wangjingxi 望京西  13   15  Island Underground Not open
Taiyanggong 太阳宫  10  Island Underground 30 December 2023[28]
Xibahe 西坝河  12  (Opening soon) Island Underground
Zuojiazhuang 左家庄 Island Underground
Workers' Stadium 工人体育场  3  (Opening soon) Island Underground
South section
Shilihe 十里河 Chaoyang  10   14  Island Underground 31 December 2021[40]
Zhoujiazhuang 周家庄 Island Underground
Shibalidian 十八里店 Dual-island Underground
Beishenshu 北神树 Tongzhou Island Underground
Ciqubei 次渠北 Island Underground
Ciqu 次渠  Yizhuang  Island Underground
Jiahuihu 嘉会湖[41] Island Underground

Line 19

Ping'anli station platform
Niujie station platform
Xingong station northbound platform
Stations of Line 19
Station Chinese name Location Transfers Platform type Grade Opened
Mudanyuan 牡丹园 Haidian  10  Island Underground 31 December 2021[42]
Beitaipingzhuang 北太平庄 Haidian/Xicheng Island Underground 30 July 2022[43]
Jishuitan 积水潭 Xicheng  2  Island Underground 31 December 2021[42]
Ping'anli 平安里  4   6  Island Underground 30 July 2022[43]
Taipingqiao 太平桥  1   2  (Out-of-system interchange via Fuxingmen)[2] Island Underground
Niujie 牛街  7  (Out-of-system interchange via Guang'anmennei)[2] Island Underground 31 December 2021[42]
Jingfengmen 景风门 Fengtai  14  Island Underground 30 July 2022[43]
Caoqiao 草桥  10   Daxing Airport  Island Underground 31 December 2021[42]
Xinfadi 新发地 Island Underground
Xingong 新宫  Daxing  Dual-island Underground

Changping Line

Ming Tombs station platform
Shahe station platform
Qinghe Xiaoyingqiao station southbound platform
Stations of Changping Line
Station Chinese name Location Transfers Platform type Grade Opened
Changping Xishankou 昌平西山口 Changping Island Underground 26 December 2015[22]
Ming Tombs 十三陵景区 Island Underground
Changping 昌平 Island Underground
Changping Dongguan 昌平东关 Island Underground
Beishaowa 北邵洼 Island Underground
Nanshao 南邵 Island Underground 30 December 2010[9]
Shahe Univ. Park 沙河高教园 Island Elevated
Shahe 沙河 Island Elevated
Gonghuacheng 巩华城 Island Elevated
Zhuxinzhuang 朱辛庄  8  Cross-platform Elevated
Life Science Park 生命科学园 Island Elevated
Xi'erqi 西二旗 Haidian  13  Side Elevated
Qinghe railway station 清河站  13  Huairou–Miyun
Qinghe railway station Qinghe
Island Underground 31 December 2021
Zhufangbei 朱房北 Island Underground Not open
Qinghe Xiaoyingqiao 清河小营桥 Cross-platform Underground 4 February 2023[44]
Xuezhiyuan 学知园 Island Underground
Liudaokou 六道口  15  Island Underground
Xueyuanqiao 学院桥 Island Underground
Xitucheng 西土城  10  Island Underground
Jimenqiao 蓟门桥 Island Underground Not open

Fangshan Line

Baipenyao station platform
Dabaotai station platform
Guangyangcheng station platform
Stations of Fangshan Line
Station Chinese name Location Transfers Platform type Grade Opened
Dongguantounan 东管头南 Fengtai  16  Island Underground 31 December 2020[37]
Capital Univ. of Economics & Business 首经贸  10  Island Underground
Huaxiang Dongqiao 花乡东桥 Island Underground
Baipenyao 白盆窑 Side Underground
Guogongzhuang 郭公庄  9  Dual-Island Underground 31 December 2011[19]
Dabaotai 大葆台 Side Half Underground 30 December 2010[9]
Daotian 稻田 Fangshan Island Elevated
Changyang 长阳 Island Elevated
Libafang 篱笆房 Island Elevated
Guangyangcheng 广阳城 Island Elevated
Liangxiang Univ. Town North 良乡大学城北 Island Elevated
Liangxiang Univ. Town 良乡大学城 Island Elevated
Liangxiang Univ. Town West 良乡大学城西 Island Elevated
Liangxiang Nanguan 良乡南关 Side Elevated
Suzhuang 苏庄 Side Elevated
Yancundong 阎村东  Yanfang  Dual-island Elevated 30 December 2017[45]

Line S1

Qiaohuying station eastbound platform
Stations of Line S1
Station Chinese name Location Transfers Platform type Grade Opened
Shichang 石厂 Mentougou Side Elevated 30 December 2017[45]
Xiaoyuan 小园 Side Elevated
Liyuanzhuang 栗园庄 Side Elevated
Shang'an 上岸 Side Elevated
Qiaohuying 桥户营 Side Elevated
Sidaoqiao 四道桥 Side Elevated
Jin'anqiao 金安桥 Shijingshan  6   11  Side Elevated
Pingguoyuan 苹果园  6  Side Elevated 31 December 2021[12]

Xijiao Line

Xiangshan station platform
Stations of Xijiao Line
Station Chinese name Location Transfers Platform type Grade Opened
Bagou 巴沟 Haidian  10  Single-sided At-grade 30 December 2017[45]
Summer Palace West Gate 颐和园西门 Side At-grade
Chapeng 茶棚 Side At-grade
Wan'an 万安 Side At-grade
Botanical Garden 植物园 Side At-grade
Fragrant Hills 香山 Single-sided At-grade

Yanfang Line

Dashihedong station platform
Stations of Yanfang Line
Station Chinese name Location Transfers Platform type Grade Opened
Yancundong 阎村东 Fangshan  Fangshan  Dual-island Elevated 30 December 2017[45]
Zicaowu 紫草坞 Island Elevated
Yancun 阎村 Island Elevated
Xingcheng 星城 Island Elevated
Dashihedong 大石河东 Side Elevated
Magezhuang 马各庄 Island Elevated
Raolefu 饶乐府 Side/island hybrid Elevated
Fangshan Chengguan 房山城关 Island Elevated
Yanshan 燕山 Island Elevated

Yizhuang Line

Wanyuan Jie station northbound platform
Ciqu station platform
Stations of Yizhuang Line
Station Chinese name Location Transfers Platform type Grade Opened
Songjiazhuang 宋家庄 Fengtai  5   10  Spanish solution Underground 30 December 2010[9]
Xiaocun 肖村 Chaoyang Island Underground
Xiaohongmen 小红门 Island Underground
Jiugong 旧宫 Daxing Island Elevated
Yizhuangqiao 亦庄桥 Side Elevated
Yizhuang Culture Park 亦庄文化园 Side Elevated
Wanyuan Jie 万源街 Side Elevated
Rongjing Dongjie 荣京东街 Side Elevated
Rongchang Dongjie 荣昌东街  Yizhuang T1  Side Elevated
Tongji Nanlu 同济南路 Tongzhou Side/island hybrid Elevated
Jinghai Lu 经海路 Side Elevated
Ciqunan 次渠南 Island Underground
Ciqu 次渠  17  Island Underground
Yizhuang railway station 亦庄火车站 Island Underground 30 December 2018[17]

Yizhuang T1 Line

Beijing Etrong International Exhibition & Convention Center station platform
Stations of Yizhuang T1 Line
Station Chinese name Location Transfers Platform type Grade Opened
Laoguanli 老观里 Daxing Island At-grade Not open
Quzhuang 屈庄 Side At-grade 31 December 2020[37]
Rongxing Jie 融兴街 Side At-grade
Rhihezhuang 瑞合庄 Side At-grade
Taiheqiaobei 太和桥北 Island At-grade
Sihaizhuang 四海庄 Island At-grade
Jiuhaocun 九号村 Island At-grade
Taihe Lu 泰河路 Island At-grade
Lujuandong 鹿圈东 Island At-grade
Yizhuang Tongren 亦庄同仁 Island At-grade
Rongchang Dongjie 荣昌东街  Yizhuang  Island At-grade
Beijing Etrong International Exhibition & Convention Center 亦创会展中心 Island At-grade
Jinghai Yilu 经海一路 Tongzhou Side At-grade
Dinghaiyuanxi 定海园西 Side At-grade
Dinghaiyuan 定海园 Side At-grade

Capital Airport Express

Terminal 3 station platform
Stations of Capital Airport Express
Station Chinese name Location Transfers Platform type Grade Opened
Dongzhimen 东直门 Dongcheng  2   13  Side Underground 19 July 2008[20]
Sanyuanqiao 三元桥 Chaoyang  10  Island Underground
Terminal 3 3号航站楼 Shunyi PEK Terminal 3 Spanish solution Elevated
Terminal 2 2号航站楼 Chaoyang PEK Terminals 1 & 2 Single-sided Underground

Daxing Airport Express

Daxing Xincheng station platform
Stations of Daxing Airport Express
Station Chinese name Location Transfers Platform type Grade Opened
Caoqiao 草桥 Fengtai  10   19  Side Underground 26 September 2019[46]
Daxing Xincheng 大兴新城 Daxing Island Underground
Daxing Airport 大兴机场 Guangyang (Langfang, Hebei Province ) PKX
China Railway Daxing Airport
Side Underground

Notes

  1. ^ a b c No official station codes are given after 2007.

References

  1. ^ a b c d e "地铁公司1971 -- 1980年". Beijing Subway (in Chinese). Archived from the original on 31 December 2010. Retrieved 17 September 2020.
  2. ^ a b c d e "地铁开通"虚拟换乘"之后,乘客的地面换乘体验如何?记者进行实地探访". 1 August 2022. Archived from the original on 2 August 2022.
  3. ^ a b c "地铁公司1981 -- 1990年地铁大事记". Beijing Subway (in Chinese). Archived from the original on 31 December 2010. Retrieved 17 September 2020.
  4. ^ a b "地铁公司1991 -- 2000年大事记". Beijing Subway (in Chinese). Archived from the original on 31 December 2010. Retrieved 17 September 2020.
  5. ^ a b c d e "地铁公司2001 -- 2004年大事记". Beijing Subway (in Chinese). Archived from the original on 31 December 2010. Retrieved 17 September 2020.
  6. ^ a b c "7号线东延八通线南延本周六开通试运营" (in Chinese). Beijing Evening News. 25 December 2019. Archived from the original on 25 December 2019. Retrieved 17 September 2020.
  7. ^ a b "定了!北京环球度假区各交通站口明天同步开通". 25 August 2021. Archived from the original on 25 August 2021.
  8. ^ "北京地铁4号线9月28日开通". beijing.cn (in Chinese). Archived from the original on 1 October 2009. Retrieved 17 September 2020.
  9. ^ a b c d e f "本市5条轨道交通线9月完工". bjd.com.cn (in Chinese). Archived from the original on 29 July 2010. Retrieved 17 September 2020.
  10. ^ "北京地铁五号线开通试运营". Qianlong (in Chinese). Archived from the original on 22 October 2008. Retrieved 17 September 2020.
  11. ^ a b c d "两条地铁新线开通试运营" (in Chinese). Xinhuanet. 30 December 2018. Archived from the original on 30 December 2018. Retrieved 17 September 2020.
  12. ^ a b "市重大项目办到苹果园交通枢纽现场办公". 20 November 2019.
  13. ^ a b c d e f g h "轨道交通四条新线12月30日开通试运营". bjysj.gov.cn (in Chinese). Archived from the original on 11 May 2013. Retrieved 17 September 2020.
  14. ^ a b "明天首班车起地铁二里沟站开通,6号线与16号线可双向换乘". 17 March 2023.
  15. ^ a b c d e f g h i j k "北京四条新地铁线路开通 7号线担纲南城交通分流重任". haiwainet.cn (in Chinese). Retrieved 17 September 2020.
  16. ^ "北京地铁通运门站预计2024年对外开放". 30 November 2021.
  17. ^ a b c d "北京这四座地铁站"暂缓开通"已多年,今年年底终于要开啦!". qq (in Chinese). Retrieved 17 September 2020.
  18. ^ a b "京地铁8号线南北新线周六开通 中国美术馆站暂缓开通". Xinhuanet (in Chinese). Archived from the original on 5 January 2014. Retrieved 17 September 2020.
  19. ^ a b c d e "Beijing launches three new subway sections". China Daily. Retrieved 17 September 2020.
  20. ^ a b c d "北京地铁奥运支线暂不向普通市民开放". China News (in Chinese). Retrieved 17 September 2020.
  21. ^ "奥运支线只要购票刷卡就能坐 奥体中心站首揭面纱(组图)". Sina (in Chinese). Retrieved 17 September 2020.
  22. ^ a b c d e f "两条地铁线今日试运营". Beijing Daily (in Chinese). Archived from the original on 27 December 2015. Retrieved 17 September 2020.
  23. ^ 北京7条计划年底通车地铁线路全部空载试运行. 新京报 (in Chinese). 16 September 2021. Archived from the original on 16 September 2021. Retrieved 24 March 2023.
  24. ^ "地铁8号线大红门站开通时间". 9 January 2023. Archived from the original on 16 January 2023. 力争明年底具备开通条件
  25. ^ "北京地铁1号线今起可换乘9号线(图)". news.cn (in Chinese). Archived from the original on 4 March 2016. Retrieved 17 September 2012.
  26. ^ "9号线丰台东大街站将于明天(10月12日)正式启用". Beijing Subway (in Chinese). Archived from the original on 7 February 2013. Retrieved 17 September 2020.
  27. ^ a b c d "北京第二条地铁环线10号线5月5日日正式贯通运营" (in Chinese). Netease. Retrieved 17 September 2020.
  28. ^ a b c d e "三段地铁线12月30日开通试运营 北京城市轨道交通运营里程跃居全国第一_信息提示_首都之窗_北京市人民政府门户网站". www.beijing.gov.cn. Retrieved 31 December 2023.
  29. ^ "北京地铁11号线西段等轨道新线2021年开通" [Beijing Subway Line 11 West Section and other new metro lines to open in 2021]. 8 January 2021. Archived from the original on 17 February 2021.
  30. ^ "两条地铁新段年底开通,京西轨道交通动脉即将正式打通". 14 December 2021. Archived from the original on 14 December 2021. 随着地铁11号线金安桥站至新首钢站区间、S1线金安桥站至苹果园站区间年底前开通
  31. ^ "北京地铁13号线清河站12月30日开门迎客" (in Chinese). Beijing News. Retrieved 17 September 2020.
  32. ^ "北京13号线西二旗车站停用 新站周六启用". Sohu (in Chinese). Retrieved 17 September 2020.
  33. ^ "北京地铁14号线七里庄站将于2月15日正式启用" (in Chinese). Sohu. 13 February 2014. Retrieved 17 September 2020.
  34. ^ "地铁14号线剩余段、17号线南段、11号线西段进入空载试运行".
  35. ^ a b "京港地铁16号线农大南路站、14号线平乐园站 将于12月30日正式开通". Beijing MTR Corporation Limited (in Chinese). Archived from the original on 3 December 2018. Retrieved 17 September 2020.
  36. ^ a b c d "16号线北段9站 14号线朝阳公园站 15号线望京东站今日开通". people.cn (in Chinese). Retrieved 17 September 2020.
  37. ^ a b c d e "明日起,地铁房山线北延、16号线中段和有轨电车T1线开通试运营!". news.bjd.com.cn (in Chinese). Retrieved 30 December 2020.
  38. ^ "樱花"开"进车站,地铁16号线玉渊潭东门站年底开通". 1 December 2021. Archived from the original on 2 December 2021. Retrieved 2 December 2021.
  39. ^ a b "北京地铁16号线南段明日开通并与北段、中段贯通". 30 December 2022. Archived from the original on 30 December 2022. 全长约14.2公里
  40. ^ "北京今日开通9条地铁线(段) 3条主干线贯通南北". 31 December 2021.
  41. ^ "地名公告>嘉会湖站". 9 November 2021. Retrieved 9 November 2021.
  42. ^ a b c d "大站快车!地铁19号线初期开通6站,从南到北仅需24分钟". 北京日报. 29 December 2021. Archived from the original on 25 March 2022. Retrieved 29 December 2021. 此次开通初期运营共6座车站,自南向北为新宫站、新发地站、草桥站、牛街站、积水潭站、牡丹园站
  43. ^ a b c "地铁19号线剩余4站明日试运营!新宫至牡丹园只需半小时". 29 July 2022. Archived from the original on 29 July 2022.
  44. ^ "2月4日首班车起昌平线南延一期开通试运营". 2 February 2023. 运营里程9.7公里,开通后将与既有昌平线贯通运营。届时,北京城市轨道交通线路共计27条,运营总里程达807公里
  45. ^ a b c d "三条地铁新线12月30日开通 公交优化调整接驳新地铁". qianlong.com (in Chinese). Retrieved 17 September 2020.
  46. ^ "地铁大兴机场线明起运营,6条机场大巴线路同步开通" (in Chinese). Sina. 25 September 2019. Retrieved 17 September 2020.