Olympic Park railway line
Olympic Park railway line | |
---|---|
Overview | |
Owner | Transport Asset Holding Entity |
Locale | Sydney, New South Wales, Australia |
Stations | 1 |
Service | |
Services | T7 Olympic Park Line |
Operator(s) | Sydney Trains |
History | |
Opened | 13 July 1911 | (Abattoirs)
Closed | 1995 |
Reopened | 8 March 1998 | (Olympic Park)
Technical | |
Track length | 7 km (4.3 mi) |
Number of tracks | 3 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 1,500 V DC from overhead catenary[1] |
The Olympic Park railway line is a railway line linking the Sydney Olympic Park precinct to the Main Suburban railway line at Flemington and Lidcombe. Originally opened as the Abattoirs branch in 1911, it was rebuilt and reopened as the Olympic Park railway line in 1998. Passenger services have since been running on it as the Olympic Park Line (numbered T7, grey).
History
Abattoirs branch
The line opened on 31 July 1911 as the Abattoirs branch off the Main Suburban railway line to the abattoirs and State Brickworks at Homebush Bay (now Sydney Olympic Park).[2] It branched off via a triangular junction behind Flemington Maintenance Depot making it accessible from the Metropolitan Goods line.[3]
Two bridges carried the line over the Great Western Highway. On 11 January 1915, the Metropolitan Meat Platforms opened.[4] Further platforms opened at Abattoirs in December 1926, Brickworks in December 1939 and Pippita in October 1940 to serve a Commonwealth Aircraft Corporation factory.[5][6][7] Sidings on the line served Dairy Farmers and Ford.[3]
On 27 February 1968, the three kilometre Homebush Saleyards Yard opened to service new cattle and sheep pens built to replace facilities at Flemington just beyond the Great Western Highway crossing. The loop was electrified to allow 46 class locomotives to operate services from the Main Western and Main Northern lines to the saleyards.[2][3]
Passenger services were operated by CPH railmotors operating from Sandown via Lidcombe until November 1984. On 9 November 1984, the line beyond the Homebush Saleyards closed. After this the line (now only going to Pippita) would be served by Single Deck Suburban "Red Rattlers".[8]
The Saleyards Loop closed on 22 June 1991.[3] Pippita continued to be served by a sole daily service to Central until 20 October 1995, operated in its later days by a V set.[2] Only traces of the line remain beyond Pippita. The Dairy Farmers siding is still connected to the present-day Up Homebush Bay West Fork track, complete with catch points and a shunt signal.[9] Remnants of the track can also be seen between the siding and the western bridge across the Great Western Highway. There is no trace of the line past here.[10]
Reopening
As part of Sydney's successful bid to hold the 2000 Olympic Games, a new Sydney Olympic Park precinct was built. Included was a railway that traversed a similar route to the former Abattoirs branch. The line was built with a balloon loop and the two track, four platform Olympic Park station. The line utilised the existing eastern bridge over the Great Western Highway which had previously only carried one track, but was wide enough to accommodate the two laid. The new line opened on 8 March 1998.[3][11][12]
Today, the line continues to transport people to and from major events occurring within the Sydney Olympic Park precinct, but also carries workers and residents of Olympic Park to and from the rest of the Sydney Trains network.
Service
Olympic Park Line | |
---|---|
Overview | |
Service type | Commuter rail |
First service | 8 March 1998 |
Current operator(s) | Sydney Trains |
Route | |
Termini | Lidcombe Olympic Park |
Average journey time | 6 minutes |
Line(s) used | Olympic Park railway line |
Technical | |
Rolling stock | Lidcombe shuttle: M sets (weekdays), A sets (weekends and public holidays) Special events: A, B, T sets |
Outside of special events, trains on the Olympic Park Line (T7) depart from a special platform at Lidcombe (platform 0, previously referred to as the Olympic Park Sprint Platform). Services operate with a frequency of one train every 10 minutes in each direction, dropping to 20 minutes at night.[13] The trip between Lidcombe and Olympic Park takes about five minutes each way. As of Friday 23 October 2020, 4-car M sets are scheduled for these trips on weekdays, while 8-car A sets are scheduled on weekends and public holidays. K sets were rostered until then, and until the S sets were retired, they were also rostered.
During major events at Sydney Olympic Park, train services run direct from the intercity platforms of Central, also sometimes stopping at Redfern and Strathfield. The Lidcombe shuttle trains are also built up to 8 cars. After larger events, west-bound trains from Olympic Park are sometimes extended beyond Lidcombe to Blacktown via the Western line, and to Glenfield and Campbelltown via the Main South line, using platforms 2 and 4 at Lidcombe instead. These services are normally run by 8-car A, B or T sets.
T7 Olympic Park Line | ||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||
Patronage
The following table shows the patronage of Sydney Trains network for the year ending on 30 June 2024. Because these figures are based on Opal tap on and tap off data, passengers are not counted when travelling to major events where the event ticket also allows travel on public transport services.
86,736,689 | ||
47,048,199 | ||
20,178,194 | [n.b. 2] | |
54,802,802 | ||
8,028,853 | ||
– | [n.b. 3] | |
1,345,017 | ||
37,691,564 | ||
22,303,028 |
Pippita Rail Trail
In 2022, NSW Government funding was made available for the planning of a proposed 2-km-long Pippita rail trail—a shared cycling and walking path—following the partially-disused Abbatoirs branch rail corridor between Lidcombe station and Sydney Olympic Park.[15] The proposal has received the support of Cumberland Council, and active transport groups such as Bicycle NSW[16] and EcoTransit Sydney.[17]
The proposed Pippita Rail Trail will reuse two now disused rail bridges to cross Parramatta Road and the M4. It will run generally parallel to the Olympic Park railway line over much of its route. The objective of the rail trail is to provide a safe active transport route into Olympic Park, expanding the existing cycling and walking options available there.[18][19]
References
- ^ Asset Standards Authority (19 March 2014). RailCorp electrical system general description, version 1.0 (PDF). Archived from the original (PDF) on 23 June 2015. Retrieved 1 September 2015.
- ^ a b c Oakes, John (2001). Sydney's Forgotten Goods Railways. Australian Railway Historical Society. pp. 72–84. ISBN 0-909650-54-3.
- ^ a b c d e "Forgotten Railways to the Olympic Site" Australian Railway Historical Society Bulletin issue 737 March 1999 pages 87–96
- ^ Metropolitan Meat Platforms NSWrail.net
- ^ Abattoirs Station NSWrail.net
- ^ Brickworks Platform NSWrail.net
- ^ Pippita NSWrail.net
- ^ "Goodbye Tin Hare" Railway Digest February 1985 page 40
- ^ DRIVERS ROUTE KNOWLEDGE DIAGRAMS – OLYMPIC PARK LINE (PDF). Sydney Trains. 2019. p. 2.
- ^ "Google Maps". Google Maps. Retrieved 20 November 2019.
- ^ "Preparing for the Games – First train to Olympic Park" Railway Digest January 1998 page 11
- ^ "Olympic Park Officially Opened & Rail Services Commence" Railway Digest April 1998 page 7
- ^ "T7: Olympic Park line timetable". Transport for NSW.
- ^ "Train Patronage – Monthly Figures". Transport for NSW. Retrieved 30 October 2024.
- ^ "Pippita Rail Trail Masterplan". haveyoursay.cumberland.nsw.gov.au. Retrieved 24 June 2024.
- ^ Pettett, Loni (2 March 2024). "Two Decades of Pippita Advocacy". Bicycle NSW. Retrieved 24 June 2024.
- ^ Network, Action. "Extend Parramatta Light Rail Stage 2 to Lidcombe and Strathfield". actionnetwork.org. Retrieved 24 June 2024.
- ^ "Pippita Rail Trail – Rail Trails Australia". Retrieved 22 November 2023.
- ^ "Pippita Rail Trail gets development funding – Rail Trails Australia". Retrieved 22 November 2023.