Jump to content

Wikipedia:Featured and good topic candidates/Green Line Extension/archive1

From Wikipedia, the free encyclopedia
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

The Green Line Extension (GLX) was a construction project to extend the light rail Massachusetts Bay Transportation Authority (MBTA) Green Line northwest into Somerville and Medford, two inner suburbs of Boston, Massachusetts. The project opened in two phases in 2022 at a total cost of $2.28 billion. Total ridership on the 4.3-mile (6.9 km) extension is estimated to reach 45,000 one-way trips per day in 2030.

Contributor(s): Pi.1415926535

This includes all seven stations built during the project. The final article was just promoted to GA. --Pi.1415926535 (talk) 18:48, 24 December 2022 (UTC)[reply]