Damansara Idaman LRT station
This article needs additional citations for verification. (October 2021) |
SA05 Damansara Idaman | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
| Future LRT station | |||||||||||
General information | |||||||||||
Location | Damansara, Selangor Malaysia | ||||||||||
Coordinates | 3°7′22″N 101°35′39″E / 3.12278°N 101.59417°E | ||||||||||
Owned by | Prasarana Malaysia | ||||||||||
Operated by | Rapid Rail | ||||||||||
Line(s) | 11 Shah Alam | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Parking | Available | ||||||||||
Other information | |||||||||||
Status | Under construction | ||||||||||
Station code | SA05 | ||||||||||
Services | |||||||||||
|
The Damansara Idaman LRT station is a light rapid transit (LRT) station that serve the suburb of Petaling Jaya in Selangor, Malaysia. It serves as one of the stations on the Shah Alam line. The station will be built near Shell and Petronas Layby of the New Klang Valley Expressway.[1]
The station is marked as Station No. 5 along with the RM9 billion line project with the line's maintenance depot located in Johan Setia, Klang. Originally this LRT station was expected to be operational in February 2024, however the operational date for the entire Shah Alam Line has been delayed and expected to be operational by third quarter of 2025 as mentioned by Transport Minister Anthony Loke. (previously expected to be operational by March 2025 as announced in 2023)[2] It will have facilities such as Park and Ride, kiosks, restrooms, elevators, taxi stand and feeder bus among others.[3]
Surrounding Areas
[edit]- Damansara Idaman
- Damansara Legenda
- PJU1 / PJU1A
- Taman Bukit Mayang Emas
- Dataran Prima
- Aman Suria
- Maisson Residence
- Arrows International Secondary School
- Taipan Ara Damansara
- Prima Avenue
- Mutiara Oriental Condominium
References
[edit]- ^ "Pelan Setiap Stesen". Prasarana Malaysia. Archived from the original on 2015-05-22. Retrieved 2015-05-17.
- ^ "LRT3 Expected To Be Operational In Q3 Of 2025 - Loke". BERNAMA. 2024-07-29. Retrieved 2024-07-29.
- ^ "Jangka Masa Projek LRT3". Prasarana Malaysia. Archived from the original on 2015-05-27. Retrieved 2015-05-17.
External links
[edit]