Kerjaya LRT station
This article needs additional citations for verification. (October 2021) |
SA09 Kerjaya | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
| Future LRT station | |||||||||||
General information | |||||||||||
Location | Glenmarie, Shah Alam, Selangor Malaysia | ||||||||||
Owned by | Prasarana Malaysia | ||||||||||
Operated by | Rapid Rail | ||||||||||
Line(s) | 11 Shah Alam | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Parking | Available | ||||||||||
Other information | |||||||||||
Status | Under construction | ||||||||||
Station code | SA09 | ||||||||||
Services | |||||||||||
|
The Kerjaya LRT station is a light rapid transit (LRT) station that serve the suburb of Shah Alam in Selangor, Malaysia. It serves as one of the stations on the Shah Alam line. The station is an elevated rapid transit station in Glenmarie, Shah Alam, Selangor, Malaysia, forming part of the Klang Valley Integrated Transit System.[1]
The station is marked as Station No. 9 along the RM9 billion line project with the line's maintenance depot located in Johan Setia, Klang.[2] Originally this LRT station was expected to be operational in February 2024, however the operational date for the entire Shah Alam Line has been delayed and expected to be operational by third quarter of 2025 as mentioned by Transport Minister Anthony Loke. (previously expected to be operational by March 2025 as announced in 2023)[3] It will have facilities such as public parking, kiosks, restrooms, elevators, taxi stand and feeder bus among others.[4]
Locality landmarks
[edit]- Politeknik Premier Sultan Salahuddin Abdul Aziz Shah
- HICOM-Glenmarie Industrial Park
- Kolej Komuniti Shah Alam
- UOW-KDU University Malaysia
- The Glenz-Glenmarie Condominium
- Utropolis Marketplace Shopping Mall
- Utropolis Urbano residential
- Montfort Boys Town Training Institute
- Pangsapuri Sri Kerjaya
References
[edit]- ^ "Pelan Setiap Stesen". Prasarana Malaysia. Archived from the original on 2015-05-22. Retrieved 2015-05-17.
- ^ "Bukit Tinggi LRT Station". MRT Corp Malaysia.
- ^ "LRT3 Expected To Be Operational In Q3 Of 2025 - Loke". BERNAMA. 2024-07-29. Retrieved 2024-07-29.
- ^ "Jangka Masa Projek LRT3". Prasarana Malaysia. Archived from the original on 2015-05-27. Retrieved 2015-05-17.
External links
[edit]