Examine individual changes
Appearance
This page allows you to examine the variables generated by the Edit Filter for an individual change.
Variables generated for this change
Variable | Value |
---|---|
Edit count of the user (user_editcount ) | 3 |
Name of the user account (user_name ) | 'Jeffreydare' |
Age of the user account (user_age ) | 452209808 |
Groups (including implicit) the user is in (user_groups ) | [
0 => '*',
1 => 'user'
] |
Rights that the user has (user_rights ) | [
0 => 'createaccount',
1 => 'read',
2 => 'edit',
3 => 'createtalk',
4 => 'writeapi',
5 => 'viewmyprivateinfo',
6 => 'editmyprivateinfo',
7 => 'editmyoptions',
8 => 'abusefilter-log-detail',
9 => 'urlshortener-create-url',
10 => 'centralauth-merge',
11 => 'abusefilter-view',
12 => 'abusefilter-log',
13 => 'vipsscaler-test',
14 => 'collectionsaveasuserpage',
15 => 'reupload-own',
16 => 'move-rootuserpages',
17 => 'createpage',
18 => 'minoredit',
19 => 'editmyusercss',
20 => 'editmyuserjson',
21 => 'editmyuserjs',
22 => 'sendemail',
23 => 'applychangetags',
24 => 'viewmywatchlist',
25 => 'editmywatchlist',
26 => 'spamblacklistlog',
27 => 'mwoauthmanagemygrants'
] |
Whether the user is editing from mobile app (user_app ) | false |
Whether or not a user is editing through the mobile interface (user_mobile ) | false |
Page ID (page_id ) | 54623706 |
Page namespace (page_namespace ) | 0 |
Page title without namespace (page_title ) | 'Yellow Line (Namma Metro)' |
Full page title (page_prefixedtitle ) | 'Yellow Line (Namma Metro)' |
Edit protection level of the page (page_restrictions_edit ) | [] |
Last ten users to contribute to the page (page_recent_contributors ) | [
0 => 'Sameer2905',
1 => 'Santosh4118',
2 => 'Filedelinkerbot',
3 => 'Sanjeev4125',
4 => '80.30.217.127',
5 => 'Ira Leviton',
6 => '49.204.142.25',
7 => 'BattyBot',
8 => '94.203.246.233',
9 => 'Navi guy'
] |
Page age in seconds (page_age ) | 203526344 |
Action (action ) | 'edit' |
Edit summary/reason (summary ) | 'The main updates from CM' |
Old content model (old_content_model ) | 'wikitext' |
New content model (new_content_model ) | 'wikitext' |
Old page wikitext, before the edit (old_wikitext ) | '{{Short description|Line of Bengaluru's Namma Metro}}
{{Use dmy dates|date=January 2019}}
{{Use Indian English|date=January 2019}}
{{Infobox rail line
| box_width = 600
| name = Yellow Line
| other_name =
| native_name =
| native_name_lang =
| color = {{rcr|Namma Metro|Yellow}}
| logo =
| logo_width = 150
| logo_alt =
| image =
| image_width = 300px
| image_alt =
| caption = The trainsets for this metro line under [[Namma Metro]] which was launched under [[CRRC Nanjing Puzhen]]
| type = [[Rapid transit|Metro]]
| system = [[Namma Metro]]
| status =
| locale = [[Bangalore]], [[Karnataka]], India
| start = [[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]]
| end = [[Bommasandra metro station|Bommasandra]]
| stations = 16
| routes =
| daily_ridership =
| ridership2 = |planopen
February 2024
| planopen = {{Start date and age|May 2024|df=y}}
| open =
| year commenced = <!--{{Start date|YYYY|MM|DD|df=y}}-->
| year completed = <!--{{Start date|YYYY|MM|DD|df=y}}-->
| close = <!--{{Start date|YYYY|MM|DD|df=y}}-->
| event1label =
| event1 =
| event2label =
| event2 =
| event3label =
| event3 =
| owner = Bangalore Metro Rail Corporation Limited (BMRCL)
| character = Elevated
| depot = Hebbagodi
| stock =
| linelength_km = 18.82
| linelength =
| tracklength_km =
| tracklength =
| tracks = 2
| gauge = {{RailGauge|sg|allk=on}}
| load_gauge =
| minradius =
| racksystem =
| routenumber =
| linenumber =
| electrification = 750 [[Volt|V]] [[Direct current|DC]] [[third rail]]
| speed_km/h =
| speed_mph =
| speed =
| signalling =
| elevation_m =
| elevation_ft =
| elevation =
| website = [https://english.bmrc.co.in/ bmrc.co.in]
| map = {{BMR Yellow Line}}
| map_name = Yellow Line Map (TBC)
| map_state = collapsed
}}
The '''Yellow Line''' of [[Namma Metro]] is under construction and will form part of the [[rapid transit|metro]] rail network for the city of [[Bangalore]], [[Karnataka]], [[India]]. The {{Cvt|18.82|km}} line connects R.V. Road with Bommasandra and is fully elevated with 16 stations.<ref name="DPRPhase2">bmrc.co.in/pdf/phase2/phase2forweb.pdf</ref> R.V. Road station is the terminal station on the city side where an interchange is being provided with the [[Green Line (Namma Metro)|Green Line]]. [[Jayadeva Hospital metro station|Jayadeva Hospital station]] will, in the future serve as another elevated interchange station with the [[Pink Line (Namma Metro)|Pink Line]]<ref name = "Hindu1">{{cite news|title=Know the location of new Red Line metro stations|url=https://www.thehindu.com/news/cities/bangalore/know-the-location-of-new-red-line-metro-stations/article19284362.ece|date=15 July 2017|newspaper=The Hindu|access-date=19 January 2019|language=en}}</ref> that is also under construction in Phase ll of Namma Metro's expansion. Upon its opening, Jayadeva Station will be the tallest and largest metro station in Bengaluru, with 5 levels of transport, including the metro lines. [[Central Silk Board metro station|Central Silk Board]] station will be another interchange station between the Yellow Line and [[Blue Line (Namma Metro)|Blue Line]]. The other end of the Yellow Line will terminate at [[Bommasandra metro station|Bommasandra]].<ref>{{Cite web |title=Karnataka approves plan to extend metro rail from Bommasandra to Hosur |url=https://www.newindianexpress.com/states/tamil-nadu/2022/jun/09/karnataka-approves-plan-to-extend-metro-rail-from-bommasandra-to-hosur-2463540.html |access-date=2022-06-10 |website=The New Indian Express}}</ref> The line was scheduled to open in June 2023, but due to construction delays, it was scheduled around December 2023, and finally, after an inspection by [[Member of Parliament, Lok Sabha|MP]] [[Tejasvi Surya]], the line will be open around April 2024.<ref>{{Cite web |title=RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah |url=https://www.newindianexpress.com/cities/bengaluru/2023/oct/21/rv-road-bommasandra-metro-stretch-to-open-by-april-cmsiddaramaiah-2625902.html |access-date=2023-11-11 |website=The New Indian Express}}</ref><ref>{{Cite news |date=2023-10-21 |title=Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah |work=The Times of India |url=https://timesofindia.indiatimes.com/city/bengaluru/metro-yellow-line-to-e-city-extended-green-line-to-open-by-april-2024-cm/articleshow/104596905.cms |access-date=2023-11-11 |issn=0971-8257}}</ref><ref>{{Cite web |date=2023-10-06 |title=Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya |url=https://www.hindustantimes.com/cities/bengaluru-news/bengaluru-metros-yellow-line-connecting-bommasandra-to-silk-board-to-open-by-february-2024-says-mp-tejasvi-surya-101696567296928.html |access-date=2023-11-11 |website=Hindustan Times |language=en}}</ref> But now as per latest reports, the Yellow Line will once again face delays in operations due to the general elections which will be held between April and May 2024. With this, it is slated to become operational post May 2024.<ref>{{Cite web |last=DHNS |title=Bengaluru metro's Yellow Line to start only after general elections |url=https://www.deccanherald.com/india/karnataka/bengaluru/metro-s-yellow-line-to-start-only-after-general-elections-2810119 |access-date=2023-12-14 |website=Deccan Herald |language=en}}</ref>
==Planning==
[[File:NammaMetro-YellowLine.png|frameless|500x500px]]
Namma Metro's Phase ll includes forty-five new lines - Yellow and [[Pink Line (Namma Metro)|Pink]] Lines, as well as extensions of [[Purple Line (Namma Metro)|Purple Line]] and [[Green Line (Namma Metro)|Green Line]].<ref name="DPRPhase2" /> Phase II spans a length of {{Cvt|72.095|km}} ({{Cvt|13.79|km}} underground, {{Cvt|0.48|km}} at grade and {{Cvt|57.825|km}} elevated) and adds 61 stations to the network of which 12 are underground.<ref>{{cite web|url=http://www.deccanchronicle.com/130604/news-current-affairs/article/metro-gets-poll-push-phase-ii|title=Metro gets poll push for Phase II|date=4 June 2013|publisher=Deccan Chronicle|access-date=28 September 2013}}</ref>
Tenders for the construction of the Yellow Line (between R V Road and Bommasandra) were floated in 3 packages.<ref>{{cite web|title=Tender for Electronics City metro reach issued – Bangalore Mirror -|url=http://bangaloremirror.indiatimes.com/bangalore/others/tender-for-electronics-city-metro-reach-issued/articleshow/55900447.cms|website=Bangalore Mirror|access-date=7 March 2017}}</ref> On 9 December 2016, BMRC floated tenders for the construction of {{Cvt|6.418|km}} stretch from Bommasandra to Hosa Road station. The work involves the construction of a viaduct with five stations and includes the construction of the depot entry line leading to Hebbagodi depot.<ref>{{cite web|title=Metro floats tenders for Electronics City route|url=http://www.newindianexpress.com/cities/bengaluru/2016/dec/10/metro-floats-tenders-for-electronics-city-route-1547548.html|website=The New Indian Express|access-date=11 December 2016}}</ref> Tenders for the {{Cvt|6.385|km}} stretch from Hosa Road to Bommanahalli (previously HSR Layout) were floated the next day.<ref>{{cite web|author=Staff Reporter|title=Electronics City inches closer to being on metro map|url=http://www.thehindu.com/news/cities/bangalore/Electronics-City-inches-closer-to-being-on-metro-map/article16791346.ece|website=The Hindu|access-date=11 December 2016}}</ref> Both packages were awarded to Thai-based ITD Cementation India in May 2017 for ₹511.35 and 485.52 crores (US$140 mil totally).<ref>{{cite web|title=Thai company ITD will build stations on e-city line in Bengaluru|url=http://economictimes.indiatimes.com/news/industry/transportation/railways/thai-company-itd-will-build-stations-on-e-city-line-in-bengaluru/articleshow/58606213.cms|website=The Economic Times|access-date=11 May 2017}}</ref> Civil works began in November 2017.
The third tender for construction of the {{Cvt|6.34|km}} elevated section and 5 stations was awarded to a joint venture between Hindustan Construction Company (HCC) and URC Construction Pvt Ltd. on 3 July 2017 for {{INRConvert|797.29|c}}.
{| class="wikitable"
! colspan="6" align="center" style="background:#{{rcr|Namma Metro|Yellow}};" | <span style="color:BLACK;">'''Yellow Line'''</span>
|-
!Section
!Length
(km)
!Contract cost
!Contractor(s)
!Expected completion
|-
|Bommasandra - Rastriya Vidhylaaya Road
|18.82
(6.418+6.385+6.340)
|₹797.27 crores
(US$110 mil)
|HCC-URC JV
|February 2024<ref name="opening">{{cite web|url=https://www.businesstoday.in/latest/trends/story/bengaluru-metros-yellow-line-to-be-opened-in-one-go-from-december-2023-382166-2023-05-21|title=Bengaluru Metro's Yellow Line to be opened in one go from December 2023|date=21 May 2023}}</ref>
|}
==Funding==
For Phase-2 of Namma Metro, the Central and State Governments will fund around ₹15,000 crore. The State and Central Governments will bear 30% and 20% of the project cost respectively. The remaining will be obtained through senior term loans. BMRCL is permitted to raise up to ₹9,000 crore through loans.
Indian firms [[Biocon]] and [[Infosys]] announced that they would provide funding construction of the Hebbagodi and Konappana Agrahara metro stations respectively on the Yellow Line. Each firm will contribute {{INRConvert|100|c}} towards the project. Biocon CMD [[Kiran Mazumdar Shaw]] stated that the company wanted to fund the project because it would help de-congest the city. Both Biocon and Infosys have offices located near the stations.<ref>{{cite web|title=Biocon, Infy to Adopt Two Metro Stations – ETtech|url=http://tech.economictimes.indiatimes.com/news/technology/biocon-infy-to-adopt-two-metro-stations/58727080|website=ETtech.com|access-date=18 May 2017|language=en}}</ref>
==Infrastructure==
===Rolling stock===
BMRC plans to operate driverless trains on the Yellow Line with [[Communication Based Train Control]] (CBTC) signaling system.<ref>{{cite web |last1=Shah |first1=Narendra |title=First Driverless trains likely to run on the Namma Metro's Yellow line by 2021 |url=https://www.metrorailnews.in/first-driverless-trains-likely-to-run-on-the-namma-metros-yellow-line-by-2021/ |website=Metro Rail News |access-date=4 May 2019 |date=13 April 2019}}</ref> On 2 December 2019, BMRC awarded a contract for supplying 90 coaches (15 rakes) to CRRC Nanjing Puzhen Co.Ltd with CBTC signaling for the Yellow Line.<ref>{{Cite web|title=BMRCL Tenders|url=http://tenderb.bmrc.co.in/|access-date=8 September 2020|website=tenderb.bmrc.co.in}}</ref> One set of trains is built and will be shipped from [[China]] to [[Chennai Port]], by sea on November 20. After [[Indian Customs services|customs]] clearance, the train will arrive by road in [[Bangalore|Bengaluru]] on December 20.<ref>{{Cite web |title=First driverless train from China on its way |url=https://www.newindianexpress.com/states/karnataka/2023/nov/10/1st-driverless-train-from-china-on-its-way-2631685.html |access-date=2023-11-11 |website=The New Indian Express}}</ref><ref>{{Cite web |date=November 4, 2023 |first=Sridhar |last=Vivan |title=Chinese rakes for Namma Metro soon |url=https://bangaloremirror.indiatimes.com/bangalore/others/chinese-rakes-for-namma-metro-soon/articleshow/104951954.cms |access-date=2023-11-11 |website=Bangalore Mirror |language=en}}</ref><ref>{{Cite news |date=2023-10-31 |title=BMRCL officials visit China to inspect Bengaluru metro Yellow Line coaches |language=en-IN |work=The Hindu |url=https://www.thehindu.com/news/cities/bangalore/bmrcl-officials-visit-china-to-inspect-bengaluru-metro-yellow-line-coaches/article67480595.ece |access-date=2023-11-11 |issn=0971-751X}}</ref>
The contract for the construction of the Hebbagodi depot was awarded to Parnika Commercial & Estates(P) Ltd in July 2019.<ref name="indiatimes">{{cite web|url=https://timesofindia.indiatimes.com/city/bengaluru/bengaluru-metro-work-to-begin-soon-at-hebbagodi/articleshow/70413910.cms|title=Delhi-based firm gets Namma Metro’s Hebbagodi depot contract | Bengaluru News|website=Times of India|access-date=19 December 2020}}</ref>
==Stations==
The Yellow Line is fully elevated and will have 16 stations.
{|class="wikitable" style="text-align: center;" width="65%"
|-
! colspan="5" align="center" style="background:#{{rcr|Namma Metro|Yellow}};" | <span style="color:BLACK;">'''Yellow Line'''</span>
|-
! rowspan="2"|#
! colspan="2"|Station Name
! rowspan="2"|Connections
! rowspan="2"|Alignment
|-
! [[English language|English]]||[[Kannada language|Kannada]]
|-
|1
|[[Rashtreeya Vidyalaya Road metro station|'''Rashtreeya Vidyalaya Road''']]
|'''ರಾಷ್ಟ್ರೀಯ ವಿದ್ಯಾಲಯ ರಸ್ತೆ'''
|{{rint|bengaluru|metro}} {{rcb|Namma Metro|Green|croute}}
|Elevated
|-
|2
|'''{{stl|Namma Metro|Ragigudda}}'''
|'''ರಾಗಿಗುಡ್ಡ'''
|
|Elevated
|-
|3
|'''{{stl|Namma Metro|Jayadeva Hospital}}'''
|'''ಜಯದೇವ ಆಸ್ಪತ್ರೆ'''
|{{rint|bengaluru|metro}} {{rcb|Namma Metro|Pink|croute}} (''<small>Under Construction</small>'')
|Elevated
|-
|4
|'''{{stl|Namma Metro|BTM Layout}}'''
|'''ಬಿ ಟಿ ಎಂ ಬಡಾವಣೆ'''
|
|Elevated
|-
|5
|'''{{stl|Namma Metro|Central Silk Board}}'''
|'''ಕೇಂದ್ರ ರೇಷ್ಮೆ ಮಂಡಳಿ'''
|{{rint|bengaluru|metro}} {{rcb|Namma Metro|Blue|croute}} (<small>''Under Construction''</small>)
|Elevated
|-
|6
|'''[[Bommanahalli metro station|Bommanahalli (Roopena Agrahara)]]'''
|'''ಬೊಮ್ಮನಹಳ್ಳಿ (ರೂಪೇನ ಅಗ್ರಹಾರ)'''
|
|Elevated
|-
|7
|'''[[Hongasandra metro station|Hongasandra (Garvebhavi Palya)]]'''
|'''ಹೊಂಗಸಂದ್ರ (ಗಾರ್ವೇಬಾವಿ ಪಲ್ಯ)'''
|
|Elevated
|-
|8
|'''{{stl|Namma Metro|Kudlu Gate}}'''
|''' ಕೂಡ್ಲು ದ್ವಾರ'''
|
|Elevated
|-
|9
|'''{{stl|Namma Metro|Singasandra}}'''
|'''ಸಿಂಗಸಂದ್ರ'''
|
|Elevated
|-
|10
|'''{{stl|Namma Metro|Hosa Road}}'''
|'''ಹೊಸ ರಸ್ತೆ'''
|
|Elevated
|-
|11
|'''{{stl|Namma Metro|Beratena Agrahara}}'''
|'''ಬೆರಟೇನ ಅಗ್ರಹಾರ'''
|
|Elevated
|-
|12
|'''{{stl|Namma Metro|Konappana Agrahara}}'''
|''' ಕೋನಪ್ಪನ ಅಗ್ರಹಾರ'''
|
|Elevated
|-
|13
|'''{{stl|Namma Metro|Electronic City}}'''
|'''ವಿದ್ಯುನ್ಮಾನ ನಗರ'''
|
|Elevated
|-
|14
|'''[[Huskur Road metro station|Huskur Road (Veerasandra)]]'''
|'''ಹುಸ್ಕೂರು ರಸ್ತೆ (ವೀರಸಂದ್ರ)'''
|
|Elevated
|-
|15
|'''{{stl|Namma Metro|Hebbagodi}}'''
|'''ಹೆಬ್ಬಗೋಡಿ'''
|
|Elevated
|-
|16
|'''{{stl|Namma Metro|Bommasandra}}'''
|'''ಬೊಮ್ಮಸಂದ್ರ'''
|
|Elevated
|}
== See also ==
* '''[[Namma Metro]]'''
** [[Purple Line (Namma Metro)|Purple Line]]
** [[Green Line (Namma Metro)|Green Line]]
** [[Pink Line (Namma Metro)|Pink Line]]
** [[Blue Line (Namma Metro)|Blue Line]]
** [[Orange Line (Namma Metro)|Orange Line]]
** [[List of Namma Metro stations|List of Namma Metro Stations]]
* [[Rapid transit in India]]
* [[List of metro systems]]
* [[Raggigudda-Silk Board Flyover]]
==References==
{{reflist}}
{{Namma Metro|yellow line=yes}}
[[Category:Namma Metro lines]]' |
New page wikitext, after the edit (new_wikitext ) | '{{Short description|Line of Bengaluru's Namma Metro}}
{{Use dmy dates|date=January 2019}}
{{Use Indian English|date=January 2019}}
{{Infobox rail line
| box_width = 600
| name = Yellow Line
| other_name =
| native_name =
| native_name_lang =
| color = {{rcr|Namma Metro|Yellow}}
| logo =
| logo_width = 150
| logo_alt =
| image =
| image_width = 300px
| image_alt =
| caption = The trainsets for this metro line under [[Namma Metro]] which was launched under [[CRRC Nanjing Puzhen]]
| type = [[Rapid transit|Metro]]
| system = [[Namma Metro]]
| status =
| locale = [[Bangalore]], [[Karnataka]], India
| start = [[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]]
| end = [[Bommasandra metro station|Bommasandra]]
| stations = 16
| routes =
| daily_ridership =
| ridership2 = |planopen
February 2024
| planopen = {{Start date and age|May 2024|df=y}}
| open =
| year commenced = <!--{{Start date|YYYY|MM|DD|df=y}}-->
| year completed = <!--{{Start date|YYYY|MM|DD|df=y}}-->
| close = <!--{{Start date|YYYY|MM|DD|df=y}}-->
| event1label =
| event1 =
| event2label =
| event2 =
| event3label =
| event3 =
| owner = Bangalore Metro Rail Corporation Limited (BMRCL)
| character = Elevated
| depot = Hebbagodi
| stock =
| linelength_km = 18.82
| linelength =
| tracklength_km =
| tracklength =
| tracks = 2
| gauge = {{RailGauge|sg|allk=on}}
| load_gauge =
| minradius =
| racksystem =
| routenumber =
| linenumber =
| electrification = 750 [[Volt|V]] [[Direct current|DC]] [[third rail]]
| speed_km/h =
| speed_mph =
| speed =
| signalling =
| elevation_m =
| elevation_ft =
| elevation =
| website = [https://english.bmrc.co.in/ bmrc.co.in]
| map = {{BMR Yellow Line}}
| map_name = Yellow Line Map (TBC)
| map_state = collapsed
}}
The '''Yellow Line''' of [[Namma Metro]] is under construction and will form part of the [[rapid transit|metro]] rail network for the city of [[Bangalore]], [[Karnataka]], [[India]]. The {{Cvt|18.82|km}} line connects R.V. Road with Bommasandra and is fully elevated with 16 stations.<ref name="DPRPhase2">bmrc.co.in/pdf/phase2/phase2forweb.pdf</ref> R.V. Road station is the terminal station on the city side where an interchange is being provided with the [[Green Line (Namma Metro)|Green Line]]. [[Jayadeva Hospital metro station|Jayadeva Hospital station]] will, in the future serve as another elevated interchange station with the [[Pink Line (Namma Metro)|Pink Line]]<ref name = "Hindu1">{{cite news|title=Know the location of new Red Line metro stations|url=https://www.thehindu.com/news/cities/bangalore/know-the-location-of-new-red-line-metro-stations/article19284362.ece|date=15 July 2017|newspaper=The Hindu|access-date=19 January 2019|language=en}}</ref> that is also under construction in Phase ll of Namma Metro's expansion. Upon its opening, Jayadeva Station will be the tallest and largest metro station in Bengaluru, with 5 levels of transport, including the metro lines. [[Central Silk Board metro station|Central Silk Board]] station will be another interchange station between the Yellow Line and [[Blue Line (Namma Metro)|Blue Line]]. The other end of the Yellow Line will terminate at [[Bommasandra metro station|Bommasandra]].<ref>{{Cite web |title=Karnataka approves plan to extend metro rail from Bommasandra to Hosur |url=https://www.newindianexpress.com/states/tamil-nadu/2022/jun/09/karnataka-approves-plan-to-extend-metro-rail-from-bommasandra-to-hosur-2463540.html |access-date=2022-06-10 |website=The New Indian Express}}</ref> The line was scheduled to open in June 2023, but due to construction delays, it was scheduled around April 2024.<ref>{{Cite web |title=RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah |url=https://www.newindianexpress.com/cities/bengaluru/2023/oct/21/rv-road-bommasandra-metro-stretch-to-open-by-april-cmsiddaramaiah-2625902.html |access-date=2023-11-11 |website=The New Indian Express}}</ref><ref>{{Cite news |date=2023-10-21 |title=Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah |work=The Times of India |url=https://timesofindia.indiatimes.com/city/bengaluru/metro-yellow-line-to-e-city-extended-green-line-to-open-by-april-2024-cm/articleshow/104596905.cms |access-date=2023-11-11 |issn=0971-8257}}</ref> But now as per latest reports, the Yellow Line will once again face delays in operations due to the general elections which will be held between April and May 2024. With this, it is slated to become operational post May 2024.<ref>{{Cite web |last=DHNS |title=Bengaluru metro's Yellow Line to start only after general elections |url=https://www.deccanherald.com/india/karnataka/bengaluru/metro-s-yellow-line-to-start-only-after-general-elections-2810119 |access-date=2023-12-14 |website=Deccan Herald |language=en}}</ref>
==Planning==
[[File:NammaMetro-YellowLine.png|frameless|500x500px]]
Namma Metro's Phase ll includes forty-five new lines - Yellow and [[Pink Line (Namma Metro)|Pink]] Lines, as well as extensions of [[Purple Line (Namma Metro)|Purple Line]] and [[Green Line (Namma Metro)|Green Line]].<ref name="DPRPhase2" /> Phase II spans a length of {{Cvt|72.095|km}} ({{Cvt|13.79|km}} underground, {{Cvt|0.48|km}} at grade and {{Cvt|57.825|km}} elevated) and adds 61 stations to the network of which 12 are underground.<ref>{{cite web|url=http://www.deccanchronicle.com/130604/news-current-affairs/article/metro-gets-poll-push-phase-ii|title=Metro gets poll push for Phase II|date=4 June 2013|publisher=Deccan Chronicle|access-date=28 September 2013}}</ref>
Tenders for the construction of the Yellow Line (between R V Road and Bommasandra) were floated in 3 packages.<ref>{{cite web|title=Tender for Electronics City metro reach issued – Bangalore Mirror -|url=http://bangaloremirror.indiatimes.com/bangalore/others/tender-for-electronics-city-metro-reach-issued/articleshow/55900447.cms|website=Bangalore Mirror|access-date=7 March 2017}}</ref> On 9 December 2016, BMRC floated tenders for the construction of {{Cvt|6.418|km}} stretch from Bommasandra to Hosa Road station. The work involves the construction of a viaduct with five stations and includes the construction of the depot entry line leading to Hebbagodi depot.<ref>{{cite web|title=Metro floats tenders for Electronics City route|url=http://www.newindianexpress.com/cities/bengaluru/2016/dec/10/metro-floats-tenders-for-electronics-city-route-1547548.html|website=The New Indian Express|access-date=11 December 2016}}</ref> Tenders for the {{Cvt|6.385|km}} stretch from Hosa Road to Bommanahalli (previously HSR Layout) were floated the next day.<ref>{{cite web|author=Staff Reporter|title=Electronics City inches closer to being on metro map|url=http://www.thehindu.com/news/cities/bangalore/Electronics-City-inches-closer-to-being-on-metro-map/article16791346.ece|website=The Hindu|access-date=11 December 2016}}</ref> Both packages were awarded to Thai-based ITD Cementation India in May 2017 for ₹511.35 and 485.52 crores (US$140 mil totally).<ref>{{cite web|title=Thai company ITD will build stations on e-city line in Bengaluru|url=http://economictimes.indiatimes.com/news/industry/transportation/railways/thai-company-itd-will-build-stations-on-e-city-line-in-bengaluru/articleshow/58606213.cms|website=The Economic Times|access-date=11 May 2017}}</ref> Civil works began in November 2017.
The third tender for construction of the {{Cvt|6.34|km}} elevated section and 5 stations was awarded to a joint venture between Hindustan Construction Company (HCC) and URC Construction Pvt Ltd. on 3 July 2017 for {{INRConvert|797.29|c}}.
{| class="wikitable"
! colspan="6" align="center" style="background:#{{rcr|Namma Metro|Yellow}};" | <span style="color:BLACK;">'''Yellow Line'''</span>
|-
!Section
!Length
(km)
!Contract cost
!Contractor(s)
!Expected completion
|-
|Bommasandra - Rastriya Vidhylaaya Road
|18.82
(6.418+6.385+6.340)
|₹797.27 crores
(US$110 mil)
|HCC-URC JV
|February 2024<ref name="opening">{{cite web|url=https://www.businesstoday.in/latest/trends/story/bengaluru-metros-yellow-line-to-be-opened-in-one-go-from-december-2023-382166-2023-05-21|title=Bengaluru Metro's Yellow Line to be opened in one go from December 2023|date=21 May 2023}}</ref>
|}
==Funding==
For Phase-2 of Namma Metro, the Central and State Governments will fund around ₹15,000 crore. The State and Central Governments will bear 30% and 20% of the project cost respectively. The remaining will be obtained through senior term loans. BMRCL is permitted to raise up to ₹9,000 crore through loans.
Indian firms [[Biocon]] and [[Infosys]] announced that they would provide funding construction of the Hebbagodi and Konappana Agrahara metro stations respectively on the Yellow Line. Each firm will contribute {{INRConvert|100|c}} towards the project. Biocon CMD [[Kiran Mazumdar Shaw]] stated that the company wanted to fund the project because it would help de-congest the city. Both Biocon and Infosys have offices located near the stations.<ref>{{cite web|title=Biocon, Infy to Adopt Two Metro Stations – ETtech|url=http://tech.economictimes.indiatimes.com/news/technology/biocon-infy-to-adopt-two-metro-stations/58727080|website=ETtech.com|access-date=18 May 2017|language=en}}</ref>
==Infrastructure==
===Rolling stock===
BMRC plans to operate driverless trains on the Yellow Line with [[Communication Based Train Control]] (CBTC) signaling system.<ref>{{cite web |last1=Shah |first1=Narendra |title=First Driverless trains likely to run on the Namma Metro's Yellow line by 2021 |url=https://www.metrorailnews.in/first-driverless-trains-likely-to-run-on-the-namma-metros-yellow-line-by-2021/ |website=Metro Rail News |access-date=4 May 2019 |date=13 April 2019}}</ref> On 2 December 2019, BMRC awarded a contract for supplying 90 coaches (15 rakes) to CRRC Nanjing Puzhen Co.Ltd with CBTC signaling for the Yellow Line.<ref>{{Cite web|title=BMRCL Tenders|url=http://tenderb.bmrc.co.in/|access-date=8 September 2020|website=tenderb.bmrc.co.in}}</ref> One set of trains is built and will be shipped from [[China]] to [[Chennai Port]], by sea on November 20. After [[Indian Customs services|customs]] clearance, the train will arrive by road in [[Bangalore|Bengaluru]] on December 20.<ref>{{Cite web |title=First driverless train from China on its way |url=https://www.newindianexpress.com/states/karnataka/2023/nov/10/1st-driverless-train-from-china-on-its-way-2631685.html |access-date=2023-11-11 |website=The New Indian Express}}</ref><ref>{{Cite web |date=November 4, 2023 |first=Sridhar |last=Vivan |title=Chinese rakes for Namma Metro soon |url=https://bangaloremirror.indiatimes.com/bangalore/others/chinese-rakes-for-namma-metro-soon/articleshow/104951954.cms |access-date=2023-11-11 |website=Bangalore Mirror |language=en}}</ref><ref>{{Cite news |date=2023-10-31 |title=BMRCL officials visit China to inspect Bengaluru metro Yellow Line coaches |language=en-IN |work=The Hindu |url=https://www.thehindu.com/news/cities/bangalore/bmrcl-officials-visit-china-to-inspect-bengaluru-metro-yellow-line-coaches/article67480595.ece |access-date=2023-11-11 |issn=0971-751X}}</ref>
The contract for the construction of the Hebbagodi depot was awarded to Parnika Commercial & Estates(P) Ltd in July 2019.<ref name="indiatimes">{{cite web|url=https://timesofindia.indiatimes.com/city/bengaluru/bengaluru-metro-work-to-begin-soon-at-hebbagodi/articleshow/70413910.cms|title=Delhi-based firm gets Namma Metro’s Hebbagodi depot contract | Bengaluru News|website=Times of India|access-date=19 December 2020}}</ref>
==Stations==
The Yellow Line is fully elevated and will have 16 stations.
{|class="wikitable" style="text-align: center;" width="65%"
|-
! colspan="5" align="center" style="background:#{{rcr|Namma Metro|Yellow}};" | <span style="color:BLACK;">'''Yellow Line'''</span>
|-
! rowspan="2"|#
! colspan="2"|Station Name
! rowspan="2"|Connections
! rowspan="2"|Alignment
|-
! [[English language|English]]||[[Kannada language|Kannada]]
|-
|1
|[[Rashtreeya Vidyalaya Road metro station|'''Rashtreeya Vidyalaya Road''']]
|'''ರಾಷ್ಟ್ರೀಯ ವಿದ್ಯಾಲಯ ರಸ್ತೆ'''
|{{rint|bengaluru|metro}} {{rcb|Namma Metro|Green|croute}}
|Elevated
|-
|2
|'''{{stl|Namma Metro|Ragigudda}}'''
|'''ರಾಗಿಗುಡ್ಡ'''
|
|Elevated
|-
|3
|'''{{stl|Namma Metro|Jayadeva Hospital}}'''
|'''ಜಯದೇವ ಆಸ್ಪತ್ರೆ'''
|{{rint|bengaluru|metro}} {{rcb|Namma Metro|Pink|croute}} (''<small>Under Construction</small>'')
|Elevated
|-
|4
|'''{{stl|Namma Metro|BTM Layout}}'''
|'''ಬಿ ಟಿ ಎಂ ಬಡಾವಣೆ'''
|
|Elevated
|-
|5
|'''{{stl|Namma Metro|Central Silk Board}}'''
|'''ಕೇಂದ್ರ ರೇಷ್ಮೆ ಮಂಡಳಿ'''
|{{rint|bengaluru|metro}} {{rcb|Namma Metro|Blue|croute}} (<small>''Under Construction''</small>)
|Elevated
|-
|6
|'''[[Bommanahalli metro station|Bommanahalli (Roopena Agrahara)]]'''
|'''ಬೊಮ್ಮನಹಳ್ಳಿ (ರೂಪೇನ ಅಗ್ರಹಾರ)'''
|
|Elevated
|-
|7
|'''[[Hongasandra metro station|Hongasandra (Garvebhavi Palya)]]'''
|'''ಹೊಂಗಸಂದ್ರ (ಗಾರ್ವೇಬಾವಿ ಪಲ್ಯ)'''
|
|Elevated
|-
|8
|'''{{stl|Namma Metro|Kudlu Gate}}'''
|''' ಕೂಡ್ಲು ದ್ವಾರ'''
|
|Elevated
|-
|9
|'''{{stl|Namma Metro|Singasandra}}'''
|'''ಸಿಂಗಸಂದ್ರ'''
|
|Elevated
|-
|10
|'''{{stl|Namma Metro|Hosa Road}}'''
|'''ಹೊಸ ರಸ್ತೆ'''
|
|Elevated
|-
|11
|'''{{stl|Namma Metro|Beratena Agrahara}}'''
|'''ಬೆರಟೇನ ಅಗ್ರಹಾರ'''
|
|Elevated
|-
|12
|'''{{stl|Namma Metro|Konappana Agrahara}}'''
|''' ಕೋನಪ್ಪನ ಅಗ್ರಹಾರ'''
|
|Elevated
|-
|13
|'''{{stl|Namma Metro|Electronic City}}'''
|'''ವಿದ್ಯುನ್ಮಾನ ನಗರ'''
|
|Elevated
|-
|14
|'''[[Huskur Road metro station|Huskur Road (Veerasandra)]]'''
|'''ಹುಸ್ಕೂರು ರಸ್ತೆ (ವೀರಸಂದ್ರ)'''
|
|Elevated
|-
|15
|'''{{stl|Namma Metro|Hebbagodi}}'''
|'''ಹೆಬ್ಬಗೋಡಿ'''
|
|Elevated
|-
|16
|'''{{stl|Namma Metro|Bommasandra}}'''
|'''ಬೊಮ್ಮಸಂದ್ರ'''
|
|Elevated
|}
== See also ==
* '''[[Namma Metro]]'''
** [[Purple Line (Namma Metro)|Purple Line]]
** [[Green Line (Namma Metro)|Green Line]]
** [[Pink Line (Namma Metro)|Pink Line]]
** [[Blue Line (Namma Metro)|Blue Line]]
** [[Orange Line (Namma Metro)|Orange Line]]
** [[List of Namma Metro stations|List of Namma Metro Stations]]
* [[Rapid transit in India]]
* [[List of metro systems]]
* [[Raggigudda-Silk Board Flyover]]
==References==
{{reflist}}
{{Namma Metro|yellow line=yes}}
[[Category:Namma Metro lines]]' |
Unified diff of changes made by edit (edit_diff ) | '@@ -67,5 +67,5 @@
}}
-The '''Yellow Line''' of [[Namma Metro]] is under construction and will form part of the [[rapid transit|metro]] rail network for the city of [[Bangalore]], [[Karnataka]], [[India]]. The {{Cvt|18.82|km}} line connects R.V. Road with Bommasandra and is fully elevated with 16 stations.<ref name="DPRPhase2">bmrc.co.in/pdf/phase2/phase2forweb.pdf</ref> R.V. Road station is the terminal station on the city side where an interchange is being provided with the [[Green Line (Namma Metro)|Green Line]]. [[Jayadeva Hospital metro station|Jayadeva Hospital station]] will, in the future serve as another elevated interchange station with the [[Pink Line (Namma Metro)|Pink Line]]<ref name = "Hindu1">{{cite news|title=Know the location of new Red Line metro stations|url=https://www.thehindu.com/news/cities/bangalore/know-the-location-of-new-red-line-metro-stations/article19284362.ece|date=15 July 2017|newspaper=The Hindu|access-date=19 January 2019|language=en}}</ref> that is also under construction in Phase ll of Namma Metro's expansion. Upon its opening, Jayadeva Station will be the tallest and largest metro station in Bengaluru, with 5 levels of transport, including the metro lines. [[Central Silk Board metro station|Central Silk Board]] station will be another interchange station between the Yellow Line and [[Blue Line (Namma Metro)|Blue Line]]. The other end of the Yellow Line will terminate at [[Bommasandra metro station|Bommasandra]].<ref>{{Cite web |title=Karnataka approves plan to extend metro rail from Bommasandra to Hosur |url=https://www.newindianexpress.com/states/tamil-nadu/2022/jun/09/karnataka-approves-plan-to-extend-metro-rail-from-bommasandra-to-hosur-2463540.html |access-date=2022-06-10 |website=The New Indian Express}}</ref> The line was scheduled to open in June 2023, but due to construction delays, it was scheduled around December 2023, and finally, after an inspection by [[Member of Parliament, Lok Sabha|MP]] [[Tejasvi Surya]], the line will be open around April 2024.<ref>{{Cite web |title=RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah |url=https://www.newindianexpress.com/cities/bengaluru/2023/oct/21/rv-road-bommasandra-metro-stretch-to-open-by-april-cmsiddaramaiah-2625902.html |access-date=2023-11-11 |website=The New Indian Express}}</ref><ref>{{Cite news |date=2023-10-21 |title=Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah |work=The Times of India |url=https://timesofindia.indiatimes.com/city/bengaluru/metro-yellow-line-to-e-city-extended-green-line-to-open-by-april-2024-cm/articleshow/104596905.cms |access-date=2023-11-11 |issn=0971-8257}}</ref><ref>{{Cite web |date=2023-10-06 |title=Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya |url=https://www.hindustantimes.com/cities/bengaluru-news/bengaluru-metros-yellow-line-connecting-bommasandra-to-silk-board-to-open-by-february-2024-says-mp-tejasvi-surya-101696567296928.html |access-date=2023-11-11 |website=Hindustan Times |language=en}}</ref> But now as per latest reports, the Yellow Line will once again face delays in operations due to the general elections which will be held between April and May 2024. With this, it is slated to become operational post May 2024.<ref>{{Cite web |last=DHNS |title=Bengaluru metro's Yellow Line to start only after general elections |url=https://www.deccanherald.com/india/karnataka/bengaluru/metro-s-yellow-line-to-start-only-after-general-elections-2810119 |access-date=2023-12-14 |website=Deccan Herald |language=en}}</ref>
+The '''Yellow Line''' of [[Namma Metro]] is under construction and will form part of the [[rapid transit|metro]] rail network for the city of [[Bangalore]], [[Karnataka]], [[India]]. The {{Cvt|18.82|km}} line connects R.V. Road with Bommasandra and is fully elevated with 16 stations.<ref name="DPRPhase2">bmrc.co.in/pdf/phase2/phase2forweb.pdf</ref> R.V. Road station is the terminal station on the city side where an interchange is being provided with the [[Green Line (Namma Metro)|Green Line]]. [[Jayadeva Hospital metro station|Jayadeva Hospital station]] will, in the future serve as another elevated interchange station with the [[Pink Line (Namma Metro)|Pink Line]]<ref name = "Hindu1">{{cite news|title=Know the location of new Red Line metro stations|url=https://www.thehindu.com/news/cities/bangalore/know-the-location-of-new-red-line-metro-stations/article19284362.ece|date=15 July 2017|newspaper=The Hindu|access-date=19 January 2019|language=en}}</ref> that is also under construction in Phase ll of Namma Metro's expansion. Upon its opening, Jayadeva Station will be the tallest and largest metro station in Bengaluru, with 5 levels of transport, including the metro lines. [[Central Silk Board metro station|Central Silk Board]] station will be another interchange station between the Yellow Line and [[Blue Line (Namma Metro)|Blue Line]]. The other end of the Yellow Line will terminate at [[Bommasandra metro station|Bommasandra]].<ref>{{Cite web |title=Karnataka approves plan to extend metro rail from Bommasandra to Hosur |url=https://www.newindianexpress.com/states/tamil-nadu/2022/jun/09/karnataka-approves-plan-to-extend-metro-rail-from-bommasandra-to-hosur-2463540.html |access-date=2022-06-10 |website=The New Indian Express}}</ref> The line was scheduled to open in June 2023, but due to construction delays, it was scheduled around April 2024.<ref>{{Cite web |title=RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah |url=https://www.newindianexpress.com/cities/bengaluru/2023/oct/21/rv-road-bommasandra-metro-stretch-to-open-by-april-cmsiddaramaiah-2625902.html |access-date=2023-11-11 |website=The New Indian Express}}</ref><ref>{{Cite news |date=2023-10-21 |title=Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah |work=The Times of India |url=https://timesofindia.indiatimes.com/city/bengaluru/metro-yellow-line-to-e-city-extended-green-line-to-open-by-april-2024-cm/articleshow/104596905.cms |access-date=2023-11-11 |issn=0971-8257}}</ref> But now as per latest reports, the Yellow Line will once again face delays in operations due to the general elections which will be held between April and May 2024. With this, it is slated to become operational post May 2024.<ref>{{Cite web |last=DHNS |title=Bengaluru metro's Yellow Line to start only after general elections |url=https://www.deccanherald.com/india/karnataka/bengaluru/metro-s-yellow-line-to-start-only-after-general-elections-2810119 |access-date=2023-12-14 |website=Deccan Herald |language=en}}</ref>
==Planning==
' |
New page size (new_size ) | 16100 |
Old page size (old_size ) | 16654 |
Size change in edit (edit_delta ) | -554 |
Lines added in edit (added_lines ) | [
0 => 'The '''Yellow Line''' of [[Namma Metro]] is under construction and will form part of the [[rapid transit|metro]] rail network for the city of [[Bangalore]], [[Karnataka]], [[India]]. The {{Cvt|18.82|km}} line connects R.V. Road with Bommasandra and is fully elevated with 16 stations.<ref name="DPRPhase2">bmrc.co.in/pdf/phase2/phase2forweb.pdf</ref> R.V. Road station is the terminal station on the city side where an interchange is being provided with the [[Green Line (Namma Metro)|Green Line]]. [[Jayadeva Hospital metro station|Jayadeva Hospital station]] will, in the future serve as another elevated interchange station with the [[Pink Line (Namma Metro)|Pink Line]]<ref name = "Hindu1">{{cite news|title=Know the location of new Red Line metro stations|url=https://www.thehindu.com/news/cities/bangalore/know-the-location-of-new-red-line-metro-stations/article19284362.ece|date=15 July 2017|newspaper=The Hindu|access-date=19 January 2019|language=en}}</ref> that is also under construction in Phase ll of Namma Metro's expansion. Upon its opening, Jayadeva Station will be the tallest and largest metro station in Bengaluru, with 5 levels of transport, including the metro lines. [[Central Silk Board metro station|Central Silk Board]] station will be another interchange station between the Yellow Line and [[Blue Line (Namma Metro)|Blue Line]]. The other end of the Yellow Line will terminate at [[Bommasandra metro station|Bommasandra]].<ref>{{Cite web |title=Karnataka approves plan to extend metro rail from Bommasandra to Hosur |url=https://www.newindianexpress.com/states/tamil-nadu/2022/jun/09/karnataka-approves-plan-to-extend-metro-rail-from-bommasandra-to-hosur-2463540.html |access-date=2022-06-10 |website=The New Indian Express}}</ref> The line was scheduled to open in June 2023, but due to construction delays, it was scheduled around April 2024.<ref>{{Cite web |title=RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah |url=https://www.newindianexpress.com/cities/bengaluru/2023/oct/21/rv-road-bommasandra-metro-stretch-to-open-by-april-cmsiddaramaiah-2625902.html |access-date=2023-11-11 |website=The New Indian Express}}</ref><ref>{{Cite news |date=2023-10-21 |title=Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah |work=The Times of India |url=https://timesofindia.indiatimes.com/city/bengaluru/metro-yellow-line-to-e-city-extended-green-line-to-open-by-april-2024-cm/articleshow/104596905.cms |access-date=2023-11-11 |issn=0971-8257}}</ref> But now as per latest reports, the Yellow Line will once again face delays in operations due to the general elections which will be held between April and May 2024. With this, it is slated to become operational post May 2024.<ref>{{Cite web |last=DHNS |title=Bengaluru metro's Yellow Line to start only after general elections |url=https://www.deccanherald.com/india/karnataka/bengaluru/metro-s-yellow-line-to-start-only-after-general-elections-2810119 |access-date=2023-12-14 |website=Deccan Herald |language=en}}</ref>'
] |
Lines removed in edit (removed_lines ) | [
0 => 'The '''Yellow Line''' of [[Namma Metro]] is under construction and will form part of the [[rapid transit|metro]] rail network for the city of [[Bangalore]], [[Karnataka]], [[India]]. The {{Cvt|18.82|km}} line connects R.V. Road with Bommasandra and is fully elevated with 16 stations.<ref name="DPRPhase2">bmrc.co.in/pdf/phase2/phase2forweb.pdf</ref> R.V. Road station is the terminal station on the city side where an interchange is being provided with the [[Green Line (Namma Metro)|Green Line]]. [[Jayadeva Hospital metro station|Jayadeva Hospital station]] will, in the future serve as another elevated interchange station with the [[Pink Line (Namma Metro)|Pink Line]]<ref name = "Hindu1">{{cite news|title=Know the location of new Red Line metro stations|url=https://www.thehindu.com/news/cities/bangalore/know-the-location-of-new-red-line-metro-stations/article19284362.ece|date=15 July 2017|newspaper=The Hindu|access-date=19 January 2019|language=en}}</ref> that is also under construction in Phase ll of Namma Metro's expansion. Upon its opening, Jayadeva Station will be the tallest and largest metro station in Bengaluru, with 5 levels of transport, including the metro lines. [[Central Silk Board metro station|Central Silk Board]] station will be another interchange station between the Yellow Line and [[Blue Line (Namma Metro)|Blue Line]]. The other end of the Yellow Line will terminate at [[Bommasandra metro station|Bommasandra]].<ref>{{Cite web |title=Karnataka approves plan to extend metro rail from Bommasandra to Hosur |url=https://www.newindianexpress.com/states/tamil-nadu/2022/jun/09/karnataka-approves-plan-to-extend-metro-rail-from-bommasandra-to-hosur-2463540.html |access-date=2022-06-10 |website=The New Indian Express}}</ref> The line was scheduled to open in June 2023, but due to construction delays, it was scheduled around December 2023, and finally, after an inspection by [[Member of Parliament, Lok Sabha|MP]] [[Tejasvi Surya]], the line will be open around April 2024.<ref>{{Cite web |title=RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah |url=https://www.newindianexpress.com/cities/bengaluru/2023/oct/21/rv-road-bommasandra-metro-stretch-to-open-by-april-cmsiddaramaiah-2625902.html |access-date=2023-11-11 |website=The New Indian Express}}</ref><ref>{{Cite news |date=2023-10-21 |title=Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah |work=The Times of India |url=https://timesofindia.indiatimes.com/city/bengaluru/metro-yellow-line-to-e-city-extended-green-line-to-open-by-april-2024-cm/articleshow/104596905.cms |access-date=2023-11-11 |issn=0971-8257}}</ref><ref>{{Cite web |date=2023-10-06 |title=Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya |url=https://www.hindustantimes.com/cities/bengaluru-news/bengaluru-metros-yellow-line-connecting-bommasandra-to-silk-board-to-open-by-february-2024-says-mp-tejasvi-surya-101696567296928.html |access-date=2023-11-11 |website=Hindustan Times |language=en}}</ref> But now as per latest reports, the Yellow Line will once again face delays in operations due to the general elections which will be held between April and May 2024. With this, it is slated to become operational post May 2024.<ref>{{Cite web |last=DHNS |title=Bengaluru metro's Yellow Line to start only after general elections |url=https://www.deccanherald.com/india/karnataka/bengaluru/metro-s-yellow-line-to-start-only-after-general-elections-2810119 |access-date=2023-12-14 |website=Deccan Herald |language=en}}</ref>'
] |
All external links added in the edit (added_links ) | [] |
All external links removed in the edit (removed_links ) | [
0 => 'https://www.hindustantimes.com/cities/bengaluru-news/bengaluru-metros-yellow-line-connecting-bommasandra-to-silk-board-to-open-by-february-2024-says-mp-tejasvi-surya-101696567296928.html'
] |
All external links in the new text (all_links ) | [
0 => 'https://www.thehindu.com/news/cities/bangalore/know-the-location-of-new-red-line-metro-stations/article19284362.ece',
1 => 'https://www.newindianexpress.com/states/tamil-nadu/2022/jun/09/karnataka-approves-plan-to-extend-metro-rail-from-bommasandra-to-hosur-2463540.html',
2 => 'https://www.newindianexpress.com/cities/bengaluru/2023/oct/21/rv-road-bommasandra-metro-stretch-to-open-by-april-cmsiddaramaiah-2625902.html',
3 => 'https://timesofindia.indiatimes.com/city/bengaluru/metro-yellow-line-to-e-city-extended-green-line-to-open-by-april-2024-cm/articleshow/104596905.cms',
4 => 'https://www.worldcat.org/issn/0971-8257',
5 => 'https://www.deccanherald.com/india/karnataka/bengaluru/metro-s-yellow-line-to-start-only-after-general-elections-2810119',
6 => 'http://www.deccanchronicle.com/130604/news-current-affairs/article/metro-gets-poll-push-phase-ii',
7 => 'http://bangaloremirror.indiatimes.com/bangalore/others/tender-for-electronics-city-metro-reach-issued/articleshow/55900447.cms',
8 => 'http://www.newindianexpress.com/cities/bengaluru/2016/dec/10/metro-floats-tenders-for-electronics-city-route-1547548.html',
9 => 'http://www.thehindu.com/news/cities/bangalore/Electronics-City-inches-closer-to-being-on-metro-map/article16791346.ece',
10 => 'http://economictimes.indiatimes.com/news/industry/transportation/railways/thai-company-itd-will-build-stations-on-e-city-line-in-bengaluru/articleshow/58606213.cms',
11 => 'https://www.businesstoday.in/latest/trends/story/bengaluru-metros-yellow-line-to-be-opened-in-one-go-from-december-2023-382166-2023-05-21',
12 => 'http://tech.economictimes.indiatimes.com/news/technology/biocon-infy-to-adopt-two-metro-stations/58727080',
13 => 'https://www.metrorailnews.in/first-driverless-trains-likely-to-run-on-the-namma-metros-yellow-line-by-2021/',
14 => 'http://tenderb.bmrc.co.in/',
15 => 'https://www.newindianexpress.com/states/karnataka/2023/nov/10/1st-driverless-train-from-china-on-its-way-2631685.html',
16 => 'https://bangaloremirror.indiatimes.com/bangalore/others/chinese-rakes-for-namma-metro-soon/articleshow/104951954.cms',
17 => 'https://www.thehindu.com/news/cities/bangalore/bmrcl-officials-visit-china-to-inspect-bengaluru-metro-yellow-line-coaches/article67480595.ece',
18 => 'https://www.worldcat.org/issn/0971-751X',
19 => 'https://timesofindia.indiatimes.com/city/bengaluru/bengaluru-metro-work-to-begin-soon-at-hebbagodi/articleshow/70413910.cms',
20 => 'https://english.bmrc.co.in/'
] |
Links in the page, before the edit (old_links ) | [
0 => 'http://www.deccanchronicle.com/130604/news-current-affairs/article/metro-gets-poll-push-phase-ii',
1 => 'http://bangaloremirror.indiatimes.com/bangalore/others/tender-for-electronics-city-metro-reach-issued/articleshow/55900447.cms',
2 => 'http://www.newindianexpress.com/cities/bengaluru/2016/dec/10/metro-floats-tenders-for-electronics-city-route-1547548.html',
3 => 'http://www.thehindu.com/news/cities/bangalore/Electronics-City-inches-closer-to-being-on-metro-map/article16791346.ece',
4 => 'http://economictimes.indiatimes.com/news/industry/transportation/railways/thai-company-itd-will-build-stations-on-e-city-line-in-bengaluru/articleshow/58606213.cms',
5 => 'https://www.thehindu.com/news/cities/bangalore/know-the-location-of-new-red-line-metro-stations/article19284362.ece',
6 => 'https://www.metrorailnews.in/first-driverless-trains-likely-to-run-on-the-namma-metros-yellow-line-by-2021/',
7 => 'https://english.bmrc.co.in/',
8 => 'http://tenderb.bmrc.co.in/',
9 => 'https://timesofindia.indiatimes.com/city/bengaluru/bengaluru-metro-work-to-begin-soon-at-hebbagodi/articleshow/70413910.cms',
10 => 'https://www.newindianexpress.com/states/tamil-nadu/2022/jun/09/karnataka-approves-plan-to-extend-metro-rail-from-bommasandra-to-hosur-2463540.html',
11 => 'http://tech.economictimes.indiatimes.com/news/technology/biocon-infy-to-adopt-two-metro-stations/58727080',
12 => 'https://www.businesstoday.in/latest/trends/story/bengaluru-metros-yellow-line-to-be-opened-in-one-go-from-december-2023-382166-2023-05-21',
13 => 'https://www.newindianexpress.com/cities/bengaluru/2023/oct/21/rv-road-bommasandra-metro-stretch-to-open-by-april-cmsiddaramaiah-2625902.html',
14 => 'https://timesofindia.indiatimes.com/city/bengaluru/metro-yellow-line-to-e-city-extended-green-line-to-open-by-april-2024-cm/articleshow/104596905.cms',
15 => 'https://www.worldcat.org/issn/0971-8257',
16 => 'https://www.hindustantimes.com/cities/bengaluru-news/bengaluru-metros-yellow-line-connecting-bommasandra-to-silk-board-to-open-by-february-2024-says-mp-tejasvi-surya-101696567296928.html',
17 => 'https://www.newindianexpress.com/states/karnataka/2023/nov/10/1st-driverless-train-from-china-on-its-way-2631685.html',
18 => 'https://bangaloremirror.indiatimes.com/bangalore/others/chinese-rakes-for-namma-metro-soon/articleshow/104951954.cms',
19 => 'https://www.thehindu.com/news/cities/bangalore/bmrcl-officials-visit-china-to-inspect-bengaluru-metro-yellow-line-coaches/article67480595.ece',
20 => 'https://www.worldcat.org/issn/0971-751X',
21 => 'https://www.deccanherald.com/india/karnataka/bengaluru/metro-s-yellow-line-to-start-only-after-general-elections-2810119'
] |
Whether or not the change was made through a Tor exit node (tor_exit_node ) | false |
Unix timestamp of change (timestamp ) | '1704261967' |