Jump to content

Examine individual changes

This page allows you to examine the variables generated by the Edit Filter for an individual change.

Variables generated for this change

VariableValue
Name of the user account (user_name)
'Gzorz'
Page ID (page_id)
'7651976'
Page namespace (page_namespace)
0
Page title without namespace (page_title)
'Temelín Nuclear Power Station'
Full page title (page_prefixedtitle)
'Temelín Nuclear Power Station'
Action (action)
'edit'
Edit summary/reason (summary)
'[[WP:UNDO|Undid]] revision 309666361 by [[Special:Contributions/Gzorz|Gzorz]] ([[User talk:Gzorz|talk]])'
Whether or not the edit is marked as minor (no longer in use) (minor_edit)
false
Old page wikitext, before the edit (old_wikitext)
'{{Infobox Nuclear power plant |name = Temelín Nuclear Power Station |image = Temelin-Nuclear Power Station.jpg |caption = |country = [[Czech Republic]] |location = |coords = {{coord|49|10|48|N|14|22|34|E |region:CZ_type:landmark |display=inline,title}} |owner = |operator = [[ČEZ|ČEZ, a. s.]] |built = 1981 |start = [[June 10]], 2002 |end = |r_supplier = |r_type = [[VVER]] 1000/320 [[pressurized water reactor|PWR]]s |r_active = 2 |r_active_mw = 1,805 |r_shutdown = |r_shutdown_mw = |r_construction = |r_construction_mw = |r_canceled = |r_canceled_mw = |r_planned = |r_planned_mw = |capacity = <!--(MW)--> |generation = 11,377 |for_year = 2006 |av_annual_gen = &nbsp; 8,884 |net_gen = 51,518 |status = O |generators = |architect = |cost = |constructors = |expires = |website = |as_of = July 22, 2007 }} '''Temelín Nuclear Power Station''' is located near [[Temelín]], a village in the [[Czech Republic]]. Temelín NPP is owned by the state-owned company [[ČEZ]], which employs 1000 workers at this site. The adjacent castle [[Vysoký Hrádek]] serves as an information centre. ==History== First plans for a power station were drafted in the late 1970s, the final project was submitted in 1985 and construction of operating units began in 1987. After the [[Velvet revolution]] in 1989 a decision was made to build only two reactors instead of the previously planned four. The first reactor was commissioned in 2000 and the second in 2002.<ref> [http://ekolist.cz/nazor.shtml?x=238126 Ekolist]</ref> In the 1990s alterations to the original design were made by [[Westinghouse]] in conjunction with [[SUJB]] and the IAEA to bring reliability and safety levels into conformance with Western European standards. The standards audit was carried out by [[Halliburton|Halliburton NUS]]. As part of the alterations information and control systems were added, electrical modifications carried out, and cabling, reactor core and fuel elements were replaced.<ref name=wnstat> {{cite news | url=http://www.world-nuclear.org/sym/2000/hezoucky.htm | title= Temelin NPP Status: The Challenge of Safety Improvements | publisher= The Uranium Institute | date=2000-12-31 | accessdate=2009-08-03}} </ref> In September and October 2000 [[anti-nuclear]] Austrian protesters demonstrated against the Temelin Nuclear Power Plant and at one stage temporarily blocked all 26 border crossings between Austria and the Czech Republic.<ref>[http://news.bbc.co.uk/2/hi/europe/926434.stm Anti-nuclear protest on Czech border]</ref><ref>[http://news.bbc.co.uk/2/hi/europe/963826.stm Austrian anti-nuclear protests continue]</ref> ==Technical data== [[Image:Model JETE.jpg|left|thumb|Model of the plant at the information center. The light green area was originally intended for the two unbuilt reactors.]] {| class="wikitable" !Station||Reactor type||Net capacity||Initial criticality||Grid date||Exp. shutdown |- |Temelín 1||[[VVER]] 1000/320||980&nbsp;[[MWe]]||Dec 2000||Jun 2002||2042 |- |Temelín 2||VVER 1000/320||1020 &nbsp;MWe||Dec 2002||Apr 2003||2043 |} The plant has four cooling towers with a height of {{convert|150|m|ft|-1}}. The diameter of each amounts to {{convert|130|m|ft|-1}}, the external wall has a surface of {{convert|44000|m2|sqft}}. The reactor vessel contains 163&nbsp;fuel assemblies, each with 313&nbsp;fuel rods. There are 61 control rods. == == New réacteurs Plans pour construire quatre réacteurs de l'original ont été rouvertes en 2005. En 2006, l'extension de l'usine a été de nouveau suspendues en raison d'un nouveau gouvernement de coalition une décidé de ne pas promouvoir l'énergie nucléaire. Toutefois, en Juillet 2008 un ČEZ demandé au ministère de l'Environnement de mener une évaluation de l'impact environnemental de deux autres réacteurs. < /ref> <ref Name=wnn1> ((citer nouvelles | Url = http://www.world-nuclear-news.org/NN-CEZ_requests_EIA_for_expansion_of_Temelin-1407084.html | Titre = CEZ EIE demandes d'expansion à la centrale de Temelin | Travail = [[World Nuclear Nouvelles]] | Date = 2008-07-14 | Accessdate = 2008-08-09)) </ Ref> En 2009 régionales approbation a été accordée pour les nouvelles constructions. CEZ envisage de commencer la construction en 2013, avec l'achèvement du premier bloc en 2020. <ref> [Http: / / praguemonitor.com/2009/04/08/south-bohemia-reps-nod-completion-temel% C3% ET Bohême du Sud-nuke nod représentants à l'extension de Temelín nuke] </ ref> En août 2009, CEZ a demandé une des offres pour les deux [[réacteur à eau pressurisée]] s (REP). <ref> ((Cite nouvelles | Url = http://www.world-nuclear-news.org/NN-Tender_launched_for_Temelin_expansion-0308094.html | Titre = offres lancé pour l'expansion de Temelin | Date = 03 août 2009 | travail = World Nuclear Nouvelles | éditeur = | Accessdate = 2009-08-03)) </ ref> <gallery> Image: JE Temelin1.jpg | centrale nucléaire de Temelin en hiver Image: Jeté-chladici veze.jpg | [[Tours de refroidissement]] </ Gallery> == Voir aussi == * [[Centrale nucléaire de Dukovany]] - une autre centrale nucléaire dans la [[République tchèque]] ==References== {{Reflist}} ==External links== {{CommonsCat|Temelín Nuclear Power Station}} * [http://www.cez.cz/presentation/eng/instance_view.jsp?instance_id=76699 Official info on website of ČEZ] * [http://www.prague360.com/fs.html?loc=locations/landmark-life/temelin-nuclear-power-plant.p36 360 Panorama of Temelin Nuclear Power Plant] [[Category:Nuclear power stations in the Czech Republic]] [[Category:České Budějovice District]] [[Category:Anti-nuclear protests]] [[cs:Jaderná elektrárna Temelín]] [[de:Kernkraftwerk Temelín]] [[eo:Nuklea elektrejo Temelín]] [[fr:Centrale nucléaire de Temelín]] [[no:Temelín kjernekraftverk]] [[pl:Elektrownia Jądrowa Temelín]] [[ru:АЭС Темелин]] [[sr:Темелин нуклеарна електрана]]'
New page wikitext, after the edit (new_wikitext)
'((Infobox centrale nucléaire | nom = centrale nucléaire de Temelin | image =-nucléaire de Temelin Station.jpg | légende = | pays = [[République tchèque]] | location = | coords = ((coord | 49 | 10 | 48 | N | 14 | 22 | 34 | E | région: CZ_type: landmark | display = inline, title)) | propriétaire = | exploitant = [[ČEZ | ČEZ, a. s.]] | construction = 1981 | start = [[Juin 10]], 2002 | end = | r_supplier = | r_type = [[VVER]] 1000/320 [[réacteur à eau pressurisée | PWR]] s | r_active = 2 | r_active_mw = 1805 | r_shutdown = | r_shutdown_mw = | r_construction = | r_construction_mw = | r_canceled = | r_canceled_mw = | r_planned = | r_planned_mw = | capacité = <!--( MW) -> | génération = 11377 | for_year = 2006 | av_annual_gen = 8884 | net_gen = 51518 | status = O | générateurs = | architecte = | coût = | constructeurs = | expires = | site web = | as_of = Juillet 22, 2007 )) '' 'Centrale nucléaire de Temelin''' est situé près de [[Temelín]], un village de la [[République tchèque]]. La centrale nucléaire de Temelin est la propriété de la société d'État [[ČEZ]], qui emploie 1000 salariés à ce site. Le château voisin [[Vysoký Hrádek]] sert de centre d'information. == Histoire == Tout d'abord des plans pour une centrale électrique ont été rédigés à la fin des années 1970, le projet final a été présenté en 1985 et la construction des unités d'exploitation a commencé en 1987. Après la [[Révolution de velours]] en 1989, une décision a été prise de construire deux réacteurs au lieu des quatre prévus précédemment. Le premier réacteur a été commandé en 2000 et la seconde en 2002. <ref> [Http://ekolist.cz/nazor.shtml?x=238126 Ekolist] </ ref> Dans les années 1990, des modifications à la conception originale a été faite par [[Westinghouse]] en collaboration avec [[SUJB]] et à l'AIEA de mettre la fiabilité et les niveaux de sécurité en conformité avec les normes de l'Europe occidentale. Les normes de vérification a été effectuée par [[Halliburton | Halliburton NUS]]. Dans le cadre de la modification des informations et des systèmes de contrôle ont été ajoutés, des modifications électriques effectuées, et le câblage, du coeur du réacteur et des éléments combustibles ont été remplacés. <ref Name=wnstat> ((cite nouvelles   | Url = http://www.world-nuclear.org/sym/2000/hezoucky.htm   | Title = centrale nucléaire de Temelin Situation: Le défi de l'Amélioration de la sécurité   | Publisher = The Uranium Institute   | Date = 2000-12-31   | Accessdate = 2009-08-03)) </ ref> En Septembre et Octobre 2000 [[anti-nucléaire]] autrichien protestataires ont manifesté contre la centrale nucléaire de Temelin et à un moment bloqué temporairement l'ensemble des 26 postes frontaliers entre l'Autriche et la République tchèque. <ref> [Http://news.bbc. co.uk/2/hi/europe/926434.stm protestation anti-nucléaire sur la frontière tchèque] </ ref> <ref> [http://news.bbc.co.uk/2/hi/europe/963826.stm anti-nucléaires autrichiens protestations continuer] </ ref> == Fiche technique == [[Image: Modèle JETE.jpg | left | thumb | Modèle de la plante à un centre d'information. La lumière verte a été initialement prévu pour les deux réacteurs unbuilt.]] (| Class = "wikitable" ! Station | | réacteur de type | | Capacité | | criticité initiale | | Date de Grid | | Exp. shutdown | -- | Temelín 1 | | [[VVER]] 1000/320 | | 980 [[MW]] | | déc 2000 | | Juin 2002 | | 2042 | -- | Temelín 2 | | VVER 1000/320 | | 1020 MWe | | déc 2002 | | avril 2003 | | 2043 |) L'usine a quatre tours de refroidissement, d'une hauteur de ((convertir | 150 | m | p | -1)). Le diamètre de chacun des montants à convertir ((| 130 | m | p | -1)), la paroi extérieure a une superficie de ((convertir | 44.000 | m2 | sqft)). De la cuve du réacteur contient 163 assemblages de combustible, avec 313 crayons de combustible. Il ya 61 barres de contrôle.   == == New réacteurs    Plans pour construire quatre réacteurs de l'original ont été rouvertes en 2005. En 2006, l'extension de l'usine a été de nouveau suspendues en raison d'un nouveau gouvernement de coalition une décidé de ne pas promouvoir l'énergie nucléaire. Toutefois, en Juillet 2008 un ČEZ demandé au ministère de l'Environnement de mener une évaluation de l'impact environnemental de deux autres réacteurs. <ref Name=wnn1>    ((citer nouvelles   | Url = http://www.world-nuclear-news.org/NN-CEZ_requests_EIA_for_expansion_of_Temelin-1407084.html   | Titre = CEZ EIE demandes d'expansion à la centrale de Temelin   | Travail = [[World Nuclear Nouvelles]]   | Date = 2008-07-14   | Accessdate = 2008-08-09))    </ Ref> En 2009 régionales approbation a été accordée pour les nouvelles constructions. CEZ envisage de commencer la construction en 2013, avec l'achèvement du premier bloc en 2020. <ref> [Http: / / praguemonitor.com/2009/04/08/south-bohemia-reps-nod-completion-temel% C3% ET Bohême du Sud-nuke nod représentants à l'extension de Temelín nuke] </ ref>    En août 2009, demandé une CEZ une des offres pour les deux [[réacteur à eau pressurisée]] s (REP). <ref> ((Cite nouvelles   | Url = http://www.world-nuclear-news.org/NN-Tender_launched_for_Temelin_expansion-0308094.html   | Titre = offres lancé pour l'expansion de Temelin   | Date = 03 août 2009 | travail = World Nuclear Nouvelles | éditeur =   | Accessdate = 2009-08-03)) </ ref>    <gallery>   Image: JE Temelin1.jpg | centrale nucléaire de Temelin en hiver   Image: Jeté-chladici veze.jpg | [[Tours de refroidissement]]    </ Galerie>   == Voir aussi ==   * [[Centrale nucléaire de Dukovany]] - une autre centrale nucléaire dans la [[République tchèque]] == Références == (()) Reflist == Liens externes == ((CommonsCat | centrale nucléaire de Temelin)) * [Http://www.cez.cz/presentation/eng/instance_view.jsp?instance_id=76699 infos sur le site officiel de ČEZ] * [Http://www.prague360.com/fs.html?loc=locations/landmark-life/temelin-nuclear-power-plant.p36 360 Panorama de la centrale nucléaire de Temelin] [[Catégorie: Les centrales nucléaires de la République tchèque]] [[Catégorie: District České Budějovice]] [[Catégorie: Anti-nucléaire protestations]] [[cs: Jaderná elektrárna Temelín]] [[de: Kernkraftwerk Temelín]] [[eo: Nuklea elektrejo Temelin]] [[fr: Centrale nucléaire de Temelin]] [[no: Temelín kjernekraftverk]] [[pl: Elektrownia Jądrowa Temelín]] [[ru: АЭС Темелин]] [[sr: Темелин нуклеарна електрана]]'
Whether or not the change was made through a Tor exit node (tor_exit_node)
0
Unix timestamp of change (timestamp)
1251063481