Jump to content

Remington Centre: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
m Undid revision 1209673512 by 185.48.248.183 (talk)
Tag: New redirect
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
#REDIRECT [[Market Village]]
{{Infobox shopping mall

| name = Remington Centre Mall
{{Rcat shell|
| image = Remington_Centre_Logo.png
{{R to related topic}}
| image_width = 160px
| caption =
| location = [[Markham, Ontario]], Canada
| address =
| coordinates = {{coord|43|49|31.8|N|79|18|12.6|W|type:landmark|display=inline,title}}
| opening_date =
| developer = Remington Group
| manager = Remington Group
| owner = Remington Group
| architect = Kohn Partnership Architects Inc. and Markham's Green Development
| number_of_stores = 700
| number_of_anchors =
| connected_landmarks =
| floor_area =
| floors = 3
| website = {{url|remingtoncentre.ca}}
| parking =
}}
}}
{{Chinese
|order=ts
|t=滙通廣場
|s=汇通广场
|p=Huì Tōng Guǎngchǎng
}}
'''Remington Centre''' ({{zh|first=t|t=滙通廣場}}) is an upcoming {{convert|800,000|sqft|adj=on}} Chinese-themed mall to be built at the corner of Kennedy Road and Steeles Avenue in [[Markham, Ontario]], Canada, on the site of the former [[Market Village]] mall which closed on March 1, 2018.<ref>{{Cite news|url=https://www.blogto.com/eat_drink/2018/02/market-village-closes-its-doors-good-today/|title=Market Village closes its doors|work=blogTO|access-date=2018-04-02|language=en}}</ref> It will be connected to [[Pacific Mall]] by an indoor walkway. [[Market Village]] was scheduled for demolition and construction of the new mall which should have begun in the third quarter of 2013,<ref name=blogto>{{Cite web|url=http://www.blogto.com/city/2012/07/the_remington_centre_will_not_be_a_strip_club/|title=The Remington Centre will not be a strip club}}</ref> but demolition began in October 2018.

The new mall will have a contemporary design and unique features, including light-filled hallways, indoor and outdoor public spaces and signature night market.<ref name="In the Loop">http://www.remingtoncentre.ca/pdf/newsletter_201211_en.pdf {{Bare URL PDF|date=March 2022}}</ref>

In 2009, plans were developed to demolish Market Village and replace it with a larger and modern complex called the Remington Centre. It will feature a two level structure with over {{convert|800000|sqft|m2}} of retail and commercial space and two condo towers (billed at '''The Grand Residences at Remington Centre''') located on the southeast end. The Remington Centre will aim for [[Leadership in Energy and Environmental Design|LEED]] status along with the installation of 1100&nbsp;tonnes of [[Geothermal heating|geothermal]] capacity.<ref>{{cite web|title = In the Loop, July 2011|url=http://www.remingtoncentre.ca/pdf/newsletter_201108_en.pdf|publisher=Remington Group|access-date=29 January 2012}}</ref> It is currently unknown when the mall will be constructed and completed due to several delays.

==Transportation access==

The new mall along with Pacific Mall are located at the major intersection of Steeles Avenue and Kennedy Road. They are served by both the [[Toronto Transit Commission|TTC]] (43 Kennedy and 53 Steeles East) and [[York Region Transit]] (8 Kennedy) buses, and located within walking distance from [[Milliken GO Station]]. The two entrance roads of the malls are Redlea Avenue and Clayton Drive. The railway crossing is being upgraded as an underpass which will eliminate traffic tieups along Steeles.

==References==
{{Reflist}}

==External links==
{{Commons category}}
*[http://www.remingtoncentre.ca// Official website]
{{Markham, Ontario}}
{{Shopping Malls in the Golden Horseshoe}}
{{Structures in Markham}}

[[Category:Shopping malls in the Regional Municipality of York]]
[[Category:Buildings and structures in Markham, Ontario]]
[[Category:Tourist attractions in Markham, Ontario]]

Latest revision as of 20:42, 19 March 2024

Redirect to: