Eastleigh Works: Difference between revisions
KolbertBot (talk | contribs) m Bot: HTTP→HTTPS |
Rescuing 2 sources and tagging 0 as dead. #IABot (v1.6.1) (Balon Greyjoy) |
||
Line 34: | Line 34: | ||
===Post privatisation=== |
===Post privatisation=== |
||
[[File:Eastleigh Works, inside panoramic 2014.jpg|thumb|1130px|A circular view from a central part of the sheds in November 2014.]] |
[[File:Eastleigh Works, inside panoramic 2014.jpg|thumb|1130px|A circular view from a central part of the sheds in November 2014.]] |
||
The plant was acquired from [[BREL]] through a management buyout becoming ''Wessex Traincare Ltd''; it was acquired by [[Alstom]] and renamed ''Alstom Wessex Traincare''.<ref>{{citation|url= http://www.railwaybritain.co.uk/british%20rail%20workshops.html| title = British Rail Workshops| work = railwaybritain.co.uk}}</ref><ref>{{citation|url = http://data.companieshouse.gov.uk/doc/company/02957753| title = ALSTOM WESSEX TRAINCARE (HOLDINGS) (02957753)| publisher = [[Companies House]]| work = data.companieshouse.gov.uk}}</ref> The site was used for carriage and multiple unit repairs. In 2004, the company announced it was to close the works due to lack of work,<ref>{{citation| url = https://www.independent.co.uk/news/business/news/alstom-closes-train-renovation-facility-6155708.html| title = Alstom closes train renovation facility| author = Michael Harrison| date = 18 December 2004|work=The Independent}}</ref> work at the site continued until March 2006.<ref name="knr">{{citation|url = http://www.rail-services.net/history.html| title = EASTLEIGH WORKS HISTORY| work = rail-services.net| publisher = Knights Rail Services}}</ref> |
The plant was acquired from [[BREL]] through a management buyout becoming ''Wessex Traincare Ltd''; it was acquired by [[Alstom]] and renamed ''Alstom Wessex Traincare''.<ref>{{citation|url= http://www.railwaybritain.co.uk/british%20rail%20workshops.html| title = British Rail Workshops| work = railwaybritain.co.uk}}</ref><ref>{{citation|url = http://data.companieshouse.gov.uk/doc/company/02957753| title = ALSTOM WESSEX TRAINCARE (HOLDINGS) (02957753)| publisher = [[Companies House]]| work = data.companieshouse.gov.uk}}</ref> The site was used for carriage and multiple unit repairs. In 2004, the company announced it was to close the works due to lack of work,<ref>{{citation| url = https://www.independent.co.uk/news/business/news/alstom-closes-train-renovation-facility-6155708.html| title = Alstom closes train renovation facility| author = Michael Harrison| date = 18 December 2004|work=The Independent}}</ref> work at the site continued until March 2006.<ref name="knr">{{citation| url = http://www.rail-services.net/history.html| title = EASTLEIGH WORKS HISTORY| work = rail-services.net| publisher = Knights Rail Services| deadurl = yes| archiveurl = https://web.archive.org/web/20130911070413/http://www.rail-services.net/history.html| archivedate = 11 September 2013| df = dmy-all}}</ref> |
||
The {{convert|42|acre|ha|adj=on}} site has been managed since 2002 by [[St. Modwen Properties]];<ref>{{citation|url = http://www.stmodwen.co.uk/development/results/32/31/default/38| accessdate =5 February 2012| work = stmodwen.co.uk|title = Eastleigh, Campbell Rd.| publisher = St. Modwen Properties Plc}}</ref> in 2007 [[Knights Rail Services]] (KRS) began operations on site, using it to store off lease rolling stock, as well as undertake repairs and refurbishments. {{As of|2010}}, the site's facilities include overhead cranes, third rail electricity supply, paint facility, and refuelling facility. Additionally [[Siemens Mobility|Siemens]] undertook maintenance of their [[British Rail Class 444|Class 444]] and [[British Rail Class 450|Class 450]] on site, and Network Rail [[British Rail MPV|MPV]]s were stored on site.<ref name="knr2">{{citation|url = http://www.rail-services.net/about.html| title = Company History| work = rail-services.net| publisher = Knights Rail Services| accessdate =22 January 2012}}</ref> Arlington Fleet Services Ltd. (maintenance, heavy repair, painting) performs maintenance from the site.<ref>{{citation|url = http://www.arlington-fleet.com/| title= Arlington Fleet| work = arlington-fleet.com| publisher = Arlington Fleet Ltd|quote = (''[home page]'') : Arlington also makes use of rail connected depots and facilities around the country and has exclusive access to some logistically favourable sites. Examples include Eastleigh Works and Barrow Hill , (''[paint shop]'') : Arlington has designed and built a new paint shop at Eastleigh Works. }}</ref> |
The {{convert|42|acre|ha|adj=on}} site has been managed since 2002 by [[St. Modwen Properties]];<ref>{{citation|url = http://www.stmodwen.co.uk/development/results/32/31/default/38| accessdate =5 February 2012| work = stmodwen.co.uk|title = Eastleigh, Campbell Rd.| publisher = St. Modwen Properties Plc}}</ref> in 2007 [[Knights Rail Services]] (KRS) began operations on site, using it to store off lease rolling stock, as well as undertake repairs and refurbishments. {{As of|2010}}, the site's facilities include overhead cranes, third rail electricity supply, paint facility, and refuelling facility. Additionally [[Siemens Mobility|Siemens]] undertook maintenance of their [[British Rail Class 444|Class 444]] and [[British Rail Class 450|Class 450]] on site, and Network Rail [[British Rail MPV|MPV]]s were stored on site.<ref name="knr2">{{citation| url = http://www.rail-services.net/about.html| title = Company History| work = rail-services.net| publisher = Knights Rail Services| accessdate = 22 January 2012| deadurl = yes| archiveurl = https://web.archive.org/web/20120226184012/http://www.rail-services.net/about.html| archivedate = 26 February 2012| df = dmy-all}}</ref> Arlington Fleet Services Ltd. (maintenance, heavy repair, painting) performs maintenance from the site.<ref>{{citation|url = http://www.arlington-fleet.com/| title= Arlington Fleet| work = arlington-fleet.com| publisher = Arlington Fleet Ltd|quote = (''[home page]'') : Arlington also makes use of rail connected depots and facilities around the country and has exclusive access to some logistically favourable sites. Examples include Eastleigh Works and Barrow Hill , (''[paint shop]'') : Arlington has designed and built a new paint shop at Eastleigh Works. }}</ref> |
||
In 2012, KRS acquired an extended lease on the site to 2016.<ref>{{citation|url= http://www.railwayherald.com/magazine/pdf/RHUK/Issue299.pdf| title = £3 million investment in Eastleigh Works| journal = Railway Herald| pages =3| issue = 299| date = 23 January 2012}}</ref> |
In 2012, KRS acquired an extended lease on the site to 2016.<ref>{{citation|url= http://www.railwayherald.com/magazine/pdf/RHUK/Issue299.pdf| title = £3 million investment in Eastleigh Works| journal = Railway Herald| pages =3| issue = 299| date = 23 January 2012}}</ref> |
Revision as of 22:27, 4 December 2017
50°57′40″N 1°20′51″W / 50.96124°N 1.34742°W
Eastleigh Works is a locomotive, carriage and wagon building and repair facility in the town of Eastleigh, in the county of Hampshire in England.
History
LSWR
The London and South Western Railway (LSWR) opened a carriage and wagon works at Eastleigh in 1891. In 1903, the Chief Mechanical Engineer, Dugald Drummond, oversaw the construction of a large motive power depot in the town; replacing the existing maintenance and repair shops at Northam, Southampton. In January 1910, locomotive building was likewise transferred to the new workshops at Eastleigh from Nine Elms in London.
Among the locomotives produced by the LSWR under Drummond at Eastleigh, were the S14 0-4-0 and M7 0-4-4 tank engines, the P14 and T14 4-6-0, and D15 4-4-0, classes. Following the appointment of Robert Urie as Chief Mechanical Engineer in 1912, the works were responsible for the construction of the H15, S15, and N15 (King Arthur) 4-6-0 classes, and the G16 4-8-0, and H16 4-6-0 tank engines.
Southern Railway
Following the merger of the LSWR and other railways in southern England to form the Southern Railway, as part of the Railways Act grouping of 1923, Eastleigh was to become the principal works for the new railway. The new Chief Mechanical Engineer, Richard Maunsell re-organised the works and directed the design and construction of various new classes.
Like most of the railway works, Eastleigh was heavily involved in the war effort, producing, in 1938, sets of parts to convert Blenheim bombers so that they could be used as fighters. The works was also part of a joint venture with other workshops, railway and private, to produce Horsa gliders for the D-Day airborne assault. With Lancing works, it turned out 200 tail units. It also produced 1,500 anti-tank gun barrels and, with Brighton railway works, 240 multiple rocket launchers, plus landing craft, fuel tenders and harbour launches.
Under the Southern Railway, the works were responsible for building the Maunsell SR Lord Nelson Class 4-6-0, the Schools 4-4-0, U1 2-6-0, W class 2-6-4 tanks, and Q class 0-6-0 locomotives. Under the regime of Oliver Bulleid, after 1937, Eastleigh works constructed all thirty of the SR Merchant Navy Class and six of the West Country 4-6-2. During the Second World War, Eastleigh works built 23 examples of the London Midland and Scottish Railway designed 8F 2-8-0s. By the end of 1947, the works had built 304 locomotives with a further 16 before steam locomotive building ceased in 1950.[1]
In 1945, the carriage works began constructing all-steel carriages, both electric and steam hauled. It pioneered the use of plastics and glass fibre reinforced resin for doors, seating and roof sections.
British Rail
In 1950, following the nationalisation of the Southern Railway to form the Southern Region of British Railways new steam locomotive building ceased at Eastleigh. However the works were kept fully occupied between 1956 and 1961 in rebuilding over 90 of the Bulleid 4-6-2 classes. Thereafter the works gradually changed over to steam and diesel repairs.
In 1962, the works was again reorganised with the carriage works site being sold, and carriage and electric multiple unit repairs transferred to the main locomotive works.
In 1962, Eastleigh Works built the first six electro-diesel locomotives of British Rail Class 73 but the remainder of the class were built at the Vulcan Foundry.
Post privatisation
The plant was acquired from BREL through a management buyout becoming Wessex Traincare Ltd; it was acquired by Alstom and renamed Alstom Wessex Traincare.[2][3] The site was used for carriage and multiple unit repairs. In 2004, the company announced it was to close the works due to lack of work,[4] work at the site continued until March 2006.[5]
The 42-acre (17 ha) site has been managed since 2002 by St. Modwen Properties;[6] in 2007 Knights Rail Services (KRS) began operations on site, using it to store off lease rolling stock, as well as undertake repairs and refurbishments. As of 2010[update], the site's facilities include overhead cranes, third rail electricity supply, paint facility, and refuelling facility. Additionally Siemens undertook maintenance of their Class 444 and Class 450 on site, and Network Rail MPVs were stored on site.[7] Arlington Fleet Services Ltd. (maintenance, heavy repair, painting) performs maintenance from the site.[8]
In 2012, KRS acquired an extended lease on the site to 2016.[9]
Locomotive Depot
Adjacent to the locomotive works was a very large 15-road engine shed which was opened in 1903 and closed in 1967.[10] This depot was one of the largest on the SR: in 1946 its allocation was 131 engines of extraordinary variety in age and origin:- 17 4-6-0, 31 4-4-0, 7 2-6-0, 19 0-6-0, 15 0-4-2, 1 0-8-0T, 13 0-6-0T, 23 0-4-4T and 5 0-4-0T. Although closed as a TMD, the site was used for scrapping engines as late as 2003.
References
- ^ Larkin (2008), p.19
- ^ "British Rail Workshops", railwaybritain.co.uk
- ^ "ALSTOM WESSEX TRAINCARE (HOLDINGS) (02957753)", data.companieshouse.gov.uk, Companies House
- ^ Michael Harrison (18 December 2004), "Alstom closes train renovation facility", The Independent
- ^ "EASTLEIGH WORKS HISTORY", rail-services.net, Knights Rail Services, archived from the original on 11 September 2013
{{citation}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help) - ^ "Eastleigh, Campbell Rd.", stmodwen.co.uk, St. Modwen Properties Plc, retrieved 5 February 2012
- ^ "Company History", rail-services.net, Knights Rail Services, archived from the original on 26 February 2012, retrieved 22 January 2012
{{citation}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help) - ^ "Arlington Fleet", arlington-fleet.com, Arlington Fleet Ltd,
([home page]) : Arlington also makes use of rail connected depots and facilities around the country and has exclusive access to some logistically favourable sites. Examples include Eastleigh Works and Barrow Hill , ([paint shop]) : Arlington has designed and built a new paint shop at Eastleigh Works.
- ^ "£3 million investment in Eastleigh Works" (PDF), Railway Herald (299): 3, 23 January 2012
- ^ Hawkins (1979), pp. 28–9.
Literature
- Aves, W.A.T., (2004) 'The locomotives built at the Southern Railway Works, 1- Eastleigh', Locomotives Illustrated, 255.
- Boocock, Colin and Stanton, Peter (2006) An illustrated history of Eastleigh Locomotive Works, Hersham: Oxford Publishing Co.
- Eagles, Barry J. (2002) Eastleigh: steam centre of the South Western, Settle: Waterfront
- Hawkins, Chris and Reeve, George (1979) An historical survey of Southern sheds, Oxford: Oxford Publishing Co.
- Larkin, E.J. and Larkin, J.G. (1988) The Railway Workshops of Great Britain 1823–1986, Macmillan Press
- Simmons, J., (1986) The Railway in Town and Country, Newton Abbot: David and Charles
- Winkworth, Bob (2007) Eastleigh: the railway, the town, the people, Southampton: Noodle Books
External links