湾区地铁开通以来,曾多次延长线路,扩充服务。

目前已经完成的计划有科马和匹兹堡/湾角延长线(1996)、都柏林/幸福屯延长线(1997)、旧金山机场/密尔布瑞延长线(2003)、<ref name="40Years">{{Cite web|url=http://www.bart.gov/sites/default/files/40thFactsheet_v1.pdf|title=Celebrating 40 Years of Service 1972 • 2012 Forty BART Achievements Over the Years|accessdate=2014-12-02|year=2012|format=pdf|publisher=Bay Area Rapid Transit (BART)}}</ref> 连接主线和奥克兰机场的自动导轨系统(2014)、<ref name="OAK-open">{{Cite web|url=http://www.bart.gov/news/articles/2014/news20141121-0|title=New BART service to Oakland International Airport now open|accessdate=2014-12-02|date=November 21, 2014|publisher=Bay Area Rapid Transit (BART)}}</ref> 温泉延长线(2017)以及刚刚完成的[[eBART]](2018)

{{旧金山湾区捷运系统边栏}}
{{旧金山湾区捷运系统边栏}}
[[舊金山]]'''[[舊金山灣區捷運系統|灣區捷運系統]]'''(BART)开通以来,曾多次'''延长'''线路,扩充服务。


目前已经完成的计划有科马和匹兹堡/湾角延长线(1996年)、都柏林/幸福屯延长线(1997年)、旧金山机场/密尔布瑞延长线(2003年)、<ref name="40Years">{{Cite web|url=http://www.bart.gov/sites/default/files/40thFactsheet_v1.pdf|title=Celebrating 40 Years of Service 1972 • 2012 Forty BART Achievements Over the Years|accessdate=2014-12-02|year=2012|format=pdf|publisher=Bay Area Rapid Transit (BART)|archive-date=2013-12-03|archive-url=https://web.archive.org/web/20131203001649/http://www.bart.gov/sites/default/files/40thFactsheet_v1.pdf|dead-url=no}}</ref> 连接主线和奥克兰机场的自动导轨系统(2014年)、<ref name="OAK-open">{{Cite web|url=http://www.bart.gov/news/articles/2014/news20141121-0|title=New BART service to Oakland International Airport now open|accessdate=2014-12-02|date=November 21, 2014|publisher=Bay Area Rapid Transit (BART)|archive-date=2021-02-22|archive-url=https://web.archive.org/web/20210222095134/https://www.bart.gov/news/articles/2014/news20141121-0|dead-url=no}}</ref> 温泉延长线(2017年)以及刚刚完成的[[eBART]](2018年)
== 正在进行的项目 ==


== 正在进行的项目 ==
=== 硅谷延长线 ===
=== 硅谷延长线 ===
{{Main|{{tsl|en|Silicon Valley BART extension|湾区捷运硅谷延长线}}}}
{{Main|{{tsl|en|Silicon Valley BART extension|湾区捷运硅谷延长线}}}}
[[File:BART-SJ-extension-map.png|右|缩略图|250x250像素|湾区捷运圣何塞市内延长线]]
[[file:Berryessa station under construction, March 2018.JPG|右|缩略图|250x250像素|施工贝里耶莎站,摄于2018年3月]]
[[File:BART-SJ-extension-map.png|右|缩略图|250x250像素|湾区捷运在圣何塞市内的延长线,其中1期为紫色,2期为蓝色]]
延长线从温泉站到圣何塞的贝里耶莎站,将湾区捷运和[[圣克拉拉轻轨]]连接起来。联邦交通运输曾在2012年项目刚启动时拨款9亿美元。<ref>{{Cite news|url=http://www.mercurynews.com/milpitas/ci_29830059/milpitas-council-receives-bart-extension-update|title=Milpitas council receives BART extension update|last=Mohammed|first=Aliyah|date=April 29, 2016|publisher=Digital First Media|accessdate=2016-05-10|agency=The Mercury News}}</ref> 目前此项目还在建设中,预计将在2018年投入运营。<ref>{{Cite web|url=http://www.mercurynews.com/2016/12/12/watch-the-progress-of-the-berryessa-and-milpitas-bart-stations/|title=Construction of the Berryessa and Milpitas BART stations}}</ref> 计划包括了2期工程:第一期是增加米尔皮塔斯站和贝里耶莎/圣荷西北站,而第二阶段则是增加阿郎姆岩/28街站、圣何塞中心站、狄里登站和圣克拉拉站。


硅谷延长线从温泉站到圣何塞的{{Translink|en|Berryessa/North San José station|贝里耶莎/圣何塞北}},将湾区捷运和[[圣克拉拉轻轨]]连接起来。{{Translink|en|Federal Transit Administration|联邦运输局}}曾在2012年项目刚启动时拨款9亿美元。<ref>{{Cite news|url=http://www.mercurynews.com/milpitas/ci_29830059/milpitas-council-receives-bart-extension-update|title=Milpitas council receives BART extension update|last=Mohammed|first=Aliyah|date=April 29, 2016|publisher=Digital First Media|accessdate=2016-05-10|agency=The Mercury News|archive-date=2016-08-29|archive-url=https://web.archive.org/web/20160829001917/http://www.mercurynews.com/milpitas/ci_29830059/milpitas-council-receives-bart-extension-update|dead-url=no}}</ref> 目前此项目还在建设中,预计将在2018年投入运营。<ref>{{Cite web|url=http://www.mercurynews.com/2016/12/12/watch-the-progress-of-the-berryessa-and-milpitas-bart-stations/|title=Construction of the Berryessa and Milpitas BART stations|access-date=2018-06-21|archive-date=2019-12-02|archive-url=https://web.archive.org/web/20191202083951/https://www.mercurynews.com/2016/12/12/watch-the-progress-of-the-berryessa-and-milpitas-bart-stations/|dead-url=no}}</ref> 计划包括了2期工程:第一期是增加[[米尔皮塔斯站]]和贝里耶莎/圣荷西北站,而第二则是增加{{Translink|en|Alum Rock station|阿郎姆岩站}}{{Tsl|en|Downtown San Jose station|圣何塞下城}}[[聖何塞狄里登站]][[克拉拉站]]
==== 贝里耶莎段(阶段1) ====

米尔皮塔斯站将位于既有[[圣克拉拉轻轨]]的同名车站处<ref>{{Cite web|url=http://www.vta.org/bart/milpitas|title=VTA's BART Silicon Valley Extension - Milpitas Station|accessdate=2018-04-13}}</ref>,而贝里耶莎/圣荷西北站将位于圣何塞跳蚤市场附近。<ref>{{Cite web|url=http://www.vta.org/bart/berryessa|title=VTA's BART Silicon Valley Extension - Berryessa/North San José Station|accessdate=2018-04-13}}</ref>之后,列车将以贝里耶莎/圣荷西北站作为总站,直到2期工程完工。
==== 贝里耶莎段({{Translink|en|Silicon Valley BART extension#Berryessa Extension|4=阶段1}}) ====
米尔皮塔斯站将位于既有[[圣克拉拉轻轨]]的同名车站处<ref>{{Cite web|url=http://www.vta.org/bart/milpitas|title=VTA's BART Silicon Valley Extension - Milpitas Station|accessdate=2018-04-13|archive-date=2019-07-09|archive-url=https://web.archive.org/web/20190709120512/http://www.vta.org/bart/milpitas|dead-url=no}}</ref>,而贝里耶莎/圣荷西北站将位于圣何塞跳蚤市场附近。<ref>{{Cite web|url=http://www.vta.org/bart/berryessa|title=VTA's BART Silicon Valley Extension - Berryessa/North San José Station|accessdate=2018-04-13|archive-date=2019-07-06|archive-url=https://web.archive.org/web/20190706062453/http://www.vta.org/bart/berryessa|dead-url=no}}</ref>之后,列车将以贝里耶莎/圣荷西北站作为总站,直到2期工程完工。


== 计划中 ==
== 计划中 ==
=== 圣何塞段({{Translink|en|Silicon Valley BART extension#Downtown San Jose/Santa Clara extension|4=阶段2}}) ===
最初的计划中,圣何塞延长线是在1期线路之后,继续以地下段进入圣何塞市区和圣克拉拉。然而在2009年2月,由于低于预期的税收,圣克拉拉市交委只好截短延长计划,将圣何塞市中心的地下段单独列为2期工程,并推迟开工。最初的完整延长线估计的成本是61亿美元,而圣市交委则估计,单独完成1期工程将只耗费23亿美元 。<ref>{{Cite news|url=http://www.vta.org/sfc/servlet.shepherd/document/download/069A0000001H7HJIA0|title=VTA and FTA Seal the Deal for BART Silicon Valley|last=Childress|first=Brandi|date=March 12, 2012|work=VTA News|access-date=April 13, 2018|archive-url=https://web.archive.org/web/20171019072758/http://www.vta.org/sfc/servlet.shepherd/document/download/069A0000001H7HJIA0|archive-date=2017-10-19|dead-url=yes}}</ref><ref>{{cite news|url=http://www.mercurynews.com/ci_11803158|title=BART to Berryessa: Sales tax projections force VTA to scale back plans|date=February 27, 2009|newspaper=[[San Jose Mercury News]]|accessdate=2009-02-27|archive-date=2014-07-20|archive-url=https://web.archive.org/web/20140720074926/http://www.mercurynews.com/ci_11803158|dead-url=no}}</ref>


市区的地下段起始于[[101号美国国道加利福尼亚州段|101号国道加州段]],阿郎姆岩/28街站将会在28街北、朱利安街和圣克拉拉街之间,圣何塞市中心站将会在圣克拉拉街地下、第3街和市场街之间,由市民广场/圣何塞州立大学站和市场街站在2005年的计划里合并而来。<ref>{{cite web|url=http://www.vta.org/inside/boards/committee_pab/svrtc/agendas_minutes/2005/06_jun/svrtc_062205_m.html|title=Minutes of Silicon Valley Rapid Transit Corridor BART Extension Policy Advisory Board Meeting|accessdate=2007-08-27|date=June 22, 2005|publisher=[[Santa Clara Valley Transportation Authority]] (VTA)|archiveurl=https://web.archive.org/web/20070930190249/http://www.vta.org/inside/boards/committee_pab/svrtc/agendas_minutes/2005/06_jun/svrtc_062205_m.html|archivedate=2007-09-30|deadurl=yes}}</ref>另外,狄里登站将位于[[聖荷西SAP中心|圣荷西SAP中心]]和[[圣荷西站|圣荷西火车站]]之间。
=== 圣何塞段(阶段2) ===
最初的计划中,圣何塞延长线是完整的一部分,线路在1期之后,继续以地下段进入圣何塞市区和圣克拉拉。然而在2009年2月,由于低于预期的税收,圣克拉拉市交委只好截短延长计划,将圣何塞市中心的地下段单独列为2期工程,并推迟开工。最初的完整延长线估计的成本是61亿美元,而圣市交委则估计,单独完成1期工程将只耗费23亿美元 。<ref>{{Cite news|url=http://www.vta.org/sfc/servlet.shepherd/document/download/069A0000001H7HJIA0|title=VTA and FTA Seal the Deal for BART Silicon Valley|last=Childress|first=Brandi|date=March 12, 2012|work=VTA News|access-date=April 13, 2018|archive-url=|archive-date=|dead-url=}}</ref><ref>{{cite news|url=http://www.mercurynews.com/ci_11803158|title=BART to Berryessa: Sales tax projections force VTA to scale back plans|date=February 27, 2009|newspaper=[[San Jose Mercury News]]|accessdate=2009-02-27}}</ref>


随后,地铁线路将向北转进,沿着既有的[[加州火車]]线路,在[[880號州際公路]]附近钻出地面,并在现有的加铁[[圣塔克拉拉站|圣克拉拉站]]设站。另外,[[诺曼·峰田圣何塞国际机场|圣何塞机场]]也规划了一条从机场到圣克拉拉站或狄里登站的短途列车<ref>{{Cite web|url=http://www.sanjoseca.gov/index.aspx?NID=3706|title=San Jose, CA - Official Website - Automated Transit Network|language=en|website=www.sanjoseca.gov|access-date=2018-04-13|archive-url=https://web.archive.org/web/20180414091746/http://www.sanjoseca.gov/index.aspx?NID=3706|archive-date=2018-04-14|dead-url=yes}}</ref>。
市区的地下段起始于[[101号美国国道加利福尼亚州段|101号国道加州段]],阿郎姆岩/28街站将会在28街北、朱利安街和圣克拉拉街之间,圣何塞市中心站将会在圣克拉拉街地下、第3街和市场街之间,由市民广场/圣何塞州立大学站和市场街站在2005年的计划里合并而来。<ref>{{cite web|url=http://www.vta.org/inside/boards/committee_pab/svrtc/agendas_minutes/2005/06_jun/svrtc_062205_m.html|title=Minutes of Silicon Valley Rapid Transit Corridor BART Extension Policy Advisory Board Meeting|accessdate=2007-08-27|date=June 22, 2005|publisher=[[Santa Clara Valley Transportation Authority]] (VTA)|archiveurl=https://web.archive.org/web/20070930190249/http://www.vta.org/inside/boards/committee_pab/svrtc/agendas_minutes/2005/06_jun/svrtc_062205_m.html|archivedate=2007-09-30 <!--DASHBot-->|deadurl=no}}</ref>另外,狄里登站将位于[[聖荷西SAP中心|圣荷西SAP中心]]和[[圣荷西站|圣荷西火车站]]之间。


圣克拉拉郡交委计划用一台[[隧道掘進機|盾构机]]开凿圣何塞市的大部分地下隧道,只有站台部分会使用[[明挖法]],<ref>{{cite web|url=http://www.communicationsmgr.com/projects/VTA/docs/Tunnel%20Fact%20Sheet.pdf|title=Downtown San Jose Subway Fact Sheet|accessdate=2007-08-27|date=May 14, 2002|format=PDF|publisher=[[Santa Clara Valley Transportation Authority]] (VTA)|archiveurl=https://web.archive.org/web/20070927055123/http://www.communicationsmgr.com/projects/VTA/docs/Tunnel%20Fact%20Sheet.pdf|archivedate=2007-09-27 <!--DASHBot-->|deadurl=no}}</ref> 以减少对市区的影响。<ref name="subway">{{cite news|url=http://www.bizjournals.com/sanjose/news/2017/01/23/are-you-ready-for-a-subway-digging-for-bart-begins.html|title=Are you ready for a subway? Digging for BART begins in two years|first1=Jody|date=January 23, 2017|work=Silicon Valley Business Journal|accessdate=2017-02-15|last1=Meacham|archive-date=2020-12-02|archive-url=https://web.archive.org/web/20201202195359/https://www.bizjournals.com/sanjose/news/2017/01/23/are-you-ready-for-a-subway-digging-for-bart-begins.html|dead-url=no}}</ref> 在市中心范围进行明挖将短暂大范围的影响,包括封闭部分圣克拉拉街、截断[[圣克拉拉轻轨]]。如果资金条件允许<!-- contigent
随后,地铁线路将向北转进,沿着既有的[[加州火車]]线路,在[[880號州際公路]]附近钻出地面,并在现有的加铁[[圣塔克拉拉站|圣克拉拉站]]设站。另外,[[诺曼·峰田圣何塞国际机场|圣何塞机场]]也规划了一条从机场到圣克拉拉站或狄里登站的短途列车<ref>{{Cite web|url=http://www.sanjoseca.gov/index.aspx?NID=3706|title=San Jose, CA - Official Website - Automated Transit Network|language=en|website=www.sanjoseca.gov|access-date=2018-04-13}}</ref>。
depend on ... to happen/exist -->,延长线将在2026年开通。<ref>{{cite news|url=http://abclocal.go.com/kgo/story?section=resources/traffic&id=6802932|title=South Bay BART initiatives move forward|date=May 8, 2009|newspaper=[[KGO-TV]] ABC San Francisco|accessdate=2010-09-17|archive-url=https://web.archive.org/web/20110629041321/http://abclocal.go.com/kgo/story?section=resources%2Ftraffic&id=6802932|archive-date=2011-06-29|dead-url=yes}}</ref>截止2018年4月,计划在圣克拉拉街地下规划了了一条单洞隧道和 一个明挖的车站。<ref>{{Cite web|url=http://www.vta.org/News-and-Media/Connect-with-VTA/VTA-Board-Approves-Staff-Recommendation-for-BART-Silicon-Valley-Phase-II-Project#.WtETki7waUl|title=VTA Board Approves Staff Recommendation for BART Silicon Valley Phase II Project|language=en|website=www.vta.org|access-date=2018-04-13|archive-date=2019-06-20|archive-url=https://web.archive.org/web/20190620005834/http://www.vta.org/News-and-Media/Connect-with-VTA/VTA-Board-Approves-Staff-Recommendation-for-BART-Silicon-Valley-Phase-II-Project#.WtETki7waUl|dead-url=no}}</ref>圣郡交委希望能在2019年开始这一期工程。<ref>{{Cite web|url=http://www.vta.org/bart/timeline|title=VTA's BART Silicon Valley Extension - Timeline|website=www.vta.org|access-date=2018-04-13|archive-date=2019-06-18|archive-url=https://web.archive.org/web/20190618084616/http://www.vta.org/bart/timeline|dead-url=no}}</ref>


==== 筹资和投票过程(2000-2008年 ====
圣克拉拉郡交委计划用一台[[隧道掘進機|盾构机]]开凿圣何塞市的大部分地下隧道,只有站台部分会使用[[明挖法]],<ref>{{cite web|url=http://www.communicationsmgr.com/projects/VTA/docs/Tunnel%20Fact%20Sheet.pdf|title=Downtown San Jose Subway Fact Sheet|accessdate=2007-08-27|date=May 14, 2002|format=PDF|publisher=[[Santa Clara Valley Transportation Authority]] (VTA)|archiveurl=https://web.archive.org/web/20070927055123/http://www.communicationsmgr.com/projects/VTA/docs/Tunnel%20Fact%20Sheet.pdf|archivedate=2007-09-27 <!--DASHBot-->|deadurl=no}}</ref> 以减少对市区的影响。<ref name="subway">{{cite news|url=http://www.bizjournals.com/sanjose/news/2017/01/23/are-you-ready-for-a-subway-digging-for-bart-begins.html|title=Are you ready for a subway? Digging for BART begins in two years|first1=Jody|date=January 23, 2017|work=Silicon Valley Business Journal|accessdate=2017-02-15|last1=Meacham}}</ref> 在市中心范围进行明挖将短暂但是大范围的影响,包括封闭部分圣克拉拉街、截断[[圣克拉拉轻轨]]。如果资金条件允许<!-- contigent
由于圣克拉拉郡在一开始就没有参与捷運管理局,这一延长线是由{{Translink|en|Santa Clara Valley Transportation Authority|圣克拉拉郡交通局|郡交通局}}负责建设的。交委调集了初步的资金,这些资金由2000年公投的营业税收<!-- proceed=revenue -->形成。2002年12月,交委[[联合太平洋铁路]]以8,000万美元的价格买下了一条货运铁路的路权,作为延长线的主要区间。<ref>{{cite news|url=http://www.bizjournals.com/sanjose/stories/2002/12/09/daily51.html|title=Union Pacific closes land and track sale to VTA|date=December 2002|publisher=|newspaper=Silicon Valley/San Jose Business Journal|accessdate=2007-08-27|archive-date=2014-07-24|archive-url=https://web.archive.org/web/20140724010711/http://www.bizjournals.com/sanjose/stories/2002/12/09/daily51.html|dead-url=no}}</ref>
depend on ... to happen/exist -->,延长线将在2026年开通。<ref>{{cite news|url=http://abclocal.go.com/kgo/story?section=resources/traffic&id=6802932|title=South Bay BART initiatives move forward|date=May 8, 2009|newspaper=[[KGO-TV]] ABC San Francisco|accessdate=2010-09-17}}</ref>截止2018年4月,计划在圣克拉拉街地下规划了了一条单洞隧道和 一个明挖的车站。<ref>{{Cite web|url=http://www.vta.org/News-and-Media/Connect-with-VTA/VTA-Board-Approves-Staff-Recommendation-for-BART-Silicon-Valley-Phase-II-Project#.WtETki7waUl|title=VTA Board Approves Staff Recommendation for BART Silicon Valley Phase II Project|language=en|website=www.vta.org|access-date=2018-04-13}}</ref>圣郡交委希望能在2019年开始这一期工程。<ref>{{Cite web|url=http://www.vta.org/bart/timeline|title=VTA's BART Silicon Valley Extension - Timeline|website=www.vta.org|access-date=2018-04-13}}</ref>


2004年,联邦交通部担心湾区捷運没有足够的资金来运营延长线,暂缓了对计划的拨款。<ref>{{cite web|url=http://apps.mtc.ca.gov/meeting_packet_documents/agenda_448/6c_Bulger.doc|title=February 2005 Monthly Report for MTC|accessdate=2014-07-15|date=February 24, 2005|last=Tom|first=Bulger|format=DOC|publisher=Government Relations Inc.|archive-date=2016-12-29|archive-url=https://web.archive.org/web/20161229165400/http://apps.mtc.ca.gov/meeting_packet_documents/agenda_448/6c_Bulger.doc|dead-url=no}}</ref> 不仅如此,此计划还被评级为“不推荐”,进一步减少了来自联邦的资金。<ref>{{cite news|url=http://www.mercurynews.com/News/ci_5162648/History-of-BART-to-the-South|title=History of BART to the South Bay|author=|date=January 8, 2005|newspaper=[[San Jose Mercury News]]|accessdate=2014-07-15|archive-date=2014-07-20|archive-url=https://web.archive.org/web/20140720072319/http://www.mercurynews.com/News/ci_5162648/History-of-BART-to-the-South|dead-url=no}}</ref>
==== 筹资和选举过程(2000-2008年) ====
由于圣克拉拉郡在一开始就没有参与地铁管理局,这一延长线是由郡交负责建设的。交委调集了初步的资金,这些资金由2000年公投的营业税收<!-- proceed=revenue -->形成。2002年12月,交委[[联合太平洋铁路]]8000万美元的价格买下了一条货运铁路的路权,作为延长线的主要区间。<ref>{{cite news|url=http://www.bizjournals.com/sanjose/stories/2002/12/09/daily51.html|title=Union Pacific closes land and track sale to VTA|date=December 2002|publisher=|newspaper=Silicon Valley/San Jose Business Journal|accessdate=2007-08-27}}</ref>


圣克拉拉郡选举人在2008年通过了“方案B”,将营业税提高了⅛美分。<ref>{{cite web|url=http://www.sccgov.org/SCC/docs/Registrar%20of%20Voters%20(DEP)/attachments/November%204%202008%20List%20of%20Local%20Measures.pdf|title=LIST OF LOCAL MEASURES PRESIDENTIAL GENERAL ELECTION|date=November 4, 2008|format=PDF|publisher=COUNTY OF SANTA CLARA 2/3 Vote|archive-url=https://wayback.archive-it.org/all/20081219062633/http://www.sccgov.org/SCC/docs/Registrar%20of%20Voters%20(DEP)/attachments/November%204%202008%20List%20of%20Local%20Measures.pdf|dead-url=yes|archive-date=December 19, 2008|df=}}</ref>一位联邦交通部推荐的独立分析师认为,提高税收不仅可以保障延长线的运营和维护,还能产生盈余。<ref>{{cite web|url=http://www.vta.org/sfc/servlet.shepherd/version/download/068A0000001Fche|title=BOARD OF DIRECTORS MEETING - AGENDA|accessdate=2014-07-15|date=August 7, 2008|format=PDF|publisher=[[Santa Clara Valley Transportation Authority]] (VTA)|page=|archive-url=https://web.archive.org/web/20140719210423/http://www.vta.org/sfc/servlet.shepherd/version/download/068A0000001Fche|archive-date=2014-07-19|dead-url=yes}}</ref><ref>{{cite news|url=http://www.mercurynews.com/ci_11007805|title=Measure B reaches two-thirds approval in late vote counting|date=November 17, 2008|newspaper=[[San Jose Mercury News]]|accessdate=2008-11-17|archive-date=2016-03-03|archive-url=https://web.archive.org/web/20160303214443/http://www.mercurynews.com/ci_11007805|dead-url=no}}</ref><ref>{{cite news|url=http://www.mercurynews.com/news/ci_11045734|title=BART backers pop open champagne, celebrate vision for San Jose's Grand Central Station|date=November 21, 2008|newspaper=[[San Jose Mercury News]]|accessdate=2008-11-21|archive-date=2016-03-03|archive-url=https://web.archive.org/web/20160303223110/http://www.mercurynews.com/news/ci_11045734|dead-url=no}}</ref><ref>{{cite web|url=http://www.sccgov.org/elections/results/nov2008/#78|title=November 4 Presidential Primary Election SUMMARY RESULTS - MEASURE B|accessdate=2008-11-21|author=|date=November 21, 2008|publisher=Santa Clara County Government|archiveurl=https://web.archive.org/web/20081116222044/http://www.sccgov.org/elections/results/nov2008/|archivedate=2008-11-16 <!--DASHBot-->|deadurl=no}}</ref>随后,圣何塞市的选举人在2016年同意了此方案。<ref>{{cite news|url=http://www.latimes.com/nation/politics/trailguide/la-na-election-aftermath-updates-trail-bay-area-voters-backing-bart-renovation-1478688849-htmlstory.html|title=Bay Area voters supporting BART renovation and extension to downtown San Jose|first1=Rong-Gong|date=November 9, 2016|publisher=Los Angeles Times|accessdate=2017-02-15|last1=Lin II|archive-date=2018-06-21|archive-url=https://web.archive.org/web/20180621221340/http://www.latimes.com/nation/politics/trailguide/la-na-election-aftermath-updates-trail-bay-area-voters-backing-bart-renovation-1478688849-htmlstory.html|dead-url=no}}</ref><ref name="subway2">{{cite news|url=http://www.bizjournals.com/sanjose/news/2017/01/23/are-you-ready-for-a-subway-digging-for-bart-begins.html|title=Are you ready for a subway? Digging for BART begins in two years|first1=Jody|date=January 23, 2017|work=Silicon Valley Business Journal|accessdate=2017-02-15|last1=Meacham|archive-date=2020-12-02|archive-url=https://web.archive.org/web/20201202195359/https://www.bizjournals.com/sanjose/news/2017/01/23/are-you-ready-for-a-subway-digging-for-bart-begins.html|dead-url=no}}</ref>
2004年,联邦交通部担心湾区地铁没有足够的资金来运营延长线,暂缓了对计划的拨款。<ref>{{cite web|url=http://apps.mtc.ca.gov/meeting_packet_documents/agenda_448/6c_Bulger.doc|title=February 2005 Monthly Report for MTC|accessdate=2014-07-15|date=February 24, 2005|last=Tom|first=Bulger|format=DOC|publisher=Government Relations Inc.}}</ref> 不仅如此,此计划还被评级为“不推荐”,进一步减少了来自联邦的资金。<ref>{{cite news|url=http://www.mercurynews.com/News/ci_5162648/History-of-BART-to-the-South|title=History of BART to the South Bay|author=|date=January 8, 2005|newspaper=[[San Jose Mercury News]]|accessdate=2014-07-15}}</ref>


=== 利佛摩延长线:[[580號州際公路 (加利福尼亞州)|580公路]]/三谷地区通道 ===
圣克拉拉郡选举人在2008年通过了“方案B”,将营业税提高了⅛美分。<ref>{{cite web|url=http://www.sccgov.org/SCC/docs/Registrar%20of%20Voters%20(DEP)/attachments/November%204%202008%20List%20of%20Local%20Measures.pdf|title=LIST OF LOCAL MEASURES PRESIDENTIAL GENERAL ELECTION|date=November 4, 2008|format=PDF|publisher=COUNTY OF SANTA CLARA 2/3 Vote|archive-url=https://wayback.archive-it.org/all/20081219062633/http://www.sccgov.org/SCC/docs/Registrar%20of%20Voters%20(DEP)/attachments/November%204%202008%20List%20of%20Local%20Measures.pdf|dead-url=yes|archive-date=December 19, 2008|df=}}</ref>一位联邦交通部推荐的独立分析师认为,提高税收不仅可以保障延长线的运营和维护,还能产生盈余。<ref>{{cite web|url=http://www.vta.org/sfc/servlet.shepherd/version/download/068A0000001Fche|title=BOARD OF DIRECTORS MEETING - AGENDA|accessdate=2014-07-15|date=August 7, 2008|format=PDF|publisher=[[Santa Clara Valley Transportation Authority]] (VTA)|page=}}</ref><ref>{{cite news|url=http://www.mercurynews.com/ci_11007805|title=Measure B reaches two-thirds approval in late vote counting|date=November 17, 2008|newspaper=[[San Jose Mercury News]]|accessdate=2008-11-17}}</ref><ref>{{cite news|url=http://www.mercurynews.com/news/ci_11045734|title=BART backers pop open champagne, celebrate vision for San Jose's Grand Central Station|date=November 21, 2008|newspaper=[[San Jose Mercury News]]|accessdate=2008-11-21}}</ref><ref>{{cite web|url=http://www.sccgov.org/elections/results/nov2008/#78|title=November 4 Presidential Primary Election SUMMARY RESULTS - MEASURE B|accessdate=2008-11-21|author=|date=November 21, 2008|publisher=Santa Clara County Government|archiveurl=https://web.archive.org/web/20081116222044/http://www.sccgov.org/elections/results/nov2008/|archivedate=2008-11-16 <!--DASHBot-->|deadurl=no}}</ref>随后,圣何塞市的选举人在2016年同意了此方案。<ref>{{cite news|url=http://www.latimes.com/nation/politics/trailguide/la-na-election-aftermath-updates-trail-bay-area-voters-backing-bart-renovation-1478688849-htmlstory.html|title=Bay Area voters supporting BART renovation and extension to downtown San Jose|first1=Rong-Gong|date=November 9, 2016|publisher=Los Angeles Times|accessdate=2017-02-15|last1=Lin II}}</ref><ref name="subway2">{{cite news|url=http://www.bizjournals.com/sanjose/news/2017/01/23/are-you-ready-for-a-subway-digging-for-bart-begins.html|title=Are you ready for a subway? Digging for BART begins in two years|first1=Jody|date=January 23, 2017|work=Silicon Valley Business Journal|accessdate=2017-02-15|last1=Meacham}}</ref>
{{anchor|Livermore}} 该延长线将延申[[都柏林/普莱森顿-戴利城线|都柏林/普莱森顿线]]的服务至[[利佛摩 (加利福尼亞州)|利佛摩]],可能的方案有继续延长蓝线、建造类似于[[EBART]]的[[柴聯車]]支线<ref>{{cite web|url=http://www.bart.gov/about/projects/liv/|title=Livermore Extension|accessdate=2013-07-26|date=January 23, 2013|publisher=BART|archive-date=2021-03-09|archive-url=https://web.archive.org/web/20210309212707/https://www.bart.gov/about/projects/liv|dead-url=no}}</ref><ref name="CloserToTracy2">{{cite news|url=http://www.goldenstatenewspapers.com/tracy_press/news/closer-to-a-bart-connection/article_5d034ce6-2bad-11e7-bfba-7ba7e05fa8d0.html|title=Closer to a BART connection|first1=Sam|date=28 April 2017|accessdate=2 June 2017|agency=Tracy Press|last1=Matthews|archive-date=2019-08-19|archive-url=https://web.archive.org/web/20190819160437/http://www.goldenstatenewspapers.com/tracy_press/news/closer-to-a-bart-connection/article_5d034ce6-2bad-11e7-bfba-7ba7e05fa8d0.html|dead-url=no}}</ref> 、或者提高接驳巴士的频率。<ref name="Dublin">{{cite news|url=http://www.independentnews.com/news/bart-pauses-planning-for-dublin-parking-garage/article_2a4c396c-f3c6-11e6-b3b1-bf671dbbe3ef.html|title=BART Pauses Planning for Dublin Parking Garage|date=16 February 2017|publisher=The Independent|accessdate=2017-02-16|archive-date=2019-12-01|archive-url=https://web.archive.org/web/20191201053656/https://www.independentnews.com/news/bart-pauses-planning-for-dublin-parking-garage/article_2a4c396c-f3c6-11e6-b3b1-bf671dbbe3ef.html|dead-url=no}}</ref>之后,此线可能继续穿过{{Tsl|en|Altamont Pass|阿拉蒙特关口}}进入[[特雷西 (加利福尼亚州)|特雷西]] 、沿着[[580號州際公路 (加利福尼亞州)|580號公路]]进入[[中央谷地]]、并且/或者依次经过[[都伯林 (加利福尼亞州)|都伯林]]、[[圣拉蒙 (加利福尼亚州)|圣拉蒙]]、[[丹维尔 (加利福尼亚州)|丹维尔]]和[[阿拉莫 (加利福尼亚州)|阿拉莫]]并通过[[680號州際公路 (加利福尼亞州)|680號公路]]到达现有的[[核桃溪 (加利福尼亚州)|核桃溪]]{{Translink|en|Walnut Creek station|核桃溪站|站}}。


目前利佛摩已经有一条[[通勤铁路]]——{{Translink|en|Altamont Corridor Express|阿拉蒙特走廊快线}}(ACE)。虽然ACE和湾区捷运没有直接的换乘,但是还是有免费的接驳巴士来往于{{Translink|en|Pleasanton station|普雷森顿站}}和{{Translink|en|Dublin/Pleasanton station|都柏林/普莱森顿站}}。<ref>{{cite web|url=http://www.acerail.com/mapsstations/pleasantonstation.aspx|title=Pleasanton Station &#124; ACE Rail Stations|accessdate=2010-08-10|author=|date=|publisher=Altamont Commuter Express|archiveurl=https://web.archive.org/web/20100703012446/http://www.acerail.com/mapsstations/pleasantonstation.aspx|archivedate=2010-07-03|deadurl=yes}}</ref><ref>{{cite web|url=http://www.lavta.org/schedules/route54.html|title=Wheels - Timetables - Route 54 - Pleasanaton Fairgrounds ACE Shuttle|accessdate=2010-08-10|author=|date=|publisher=Livermore Amador Valley Transit Authority|archive-date=2011-04-19|archive-url=https://web.archive.org/web/20110419204748/http://www.lavta.org/schedules/route54.html|dead-url=no}}</ref><ref>{{cite web|url=http://www.lavta.org/fares/index.html|title=Wheels - Fares and Sales|accessdate=2010-08-10|author=|date=|publisher=Livermore Amador Valley Transit Authority|archiveurl=https://web.archive.org/web/20100801092008/http://www.lavta.org/fares/index.html|archivedate=2010-08-01 <!--DASHBot-->|deadurl=no}}</ref>
=== 利弗莫尔延长线:I-580/Tri-Valley走廊 ===

在2010年7月1日,一份可观的方案被提出,并得到了利市议会的支持。此方案包括了建造利佛摩中心站、在凡斯科路上、邻近[[勞倫斯利佛摩國家實驗室|勞倫斯實驗室]]和[[桑迪亚国家实验室|桑迪亚实验室]]的车站。两车站都会有来往ACE的接驳。<ref>{{cite web|url=http://transbayblog.com/2010/07/01/bart-board-selects-alignment-for-livermore-extension/|title=BART Board selects alignment for Livermore extension|accessdate=2008-11-17|website=Transbayblog.com|archive-date=2020-11-26|archive-url=https://web.archive.org/web/20201126040926/https://transbayblog.com/2010/07/01/bart-board-selects-alignment-for-livermore-extension/|dead-url=no}}</ref> 然而在一年后,利市议会因为市民的抗议, 而不再支持此方案,转而要求线路沿着[[580號州際公路 (加利福尼亞州)|580號公路]]发展,并在格林维尔路和伊莎贝拉大道的路口设站。<ref>{{cite news|url=http://livermore.patch.com/articles/city-council-forgoes-election-approves-initative-advocating-to-keep-bart-on-i-580|title=City Council OKs Initiative to Keep BART on I-580|last=Courtney|first=Jennifer|date=July 12, 2011|newspaper=Livermore Patch|accessdate=2013-01-08|deadurl=yes|archiveurl=https://web.archive.org/web/20110910032450/http://livermore.patch.com/articles/city-council-forgoes-election-approves-initative-advocating-to-keep-bart-on-i-580|archivedate=September 10, 2011|df=}}</ref> 随后,湾区捷运在2012年9月发表了准备阶段的环境评估报告,其中提及了在580号公路和伊莎贝拉大道的路口设站,在580号公路和格林维尔路的路口建造停车场,并以接驳巴士连接{{Translink|en|Vasco Road station|凡斯科路站}}。<ref>{{cite web|url=http://www.bart.gov/about/projects/liv|title=BART to Livermore Extension Project|accessdate=2014-07-16|date=June 12, 2014|publisher=[[Bay Area Rapid Transit]] (BART)|archive-date=2021-03-09|archive-url=https://web.archive.org/web/20210309212707/https://www.bart.gov/about/projects/liv|dead-url=no}}</ref>土地征用的研究在2015年9月由利佛摩市完成,预计此线能在2026年完成。<ref name="Dublin2">{{cite news|url=http://www.independentnews.com/news/bart-pauses-planning-for-dublin-parking-garage/article_2a4c396c-f3c6-11e6-b3b1-bf671dbbe3ef.html|title=BART Pauses Planning for Dublin Parking Garage|date=16 February 2017|publisher=The Independent|accessdate=2017-02-16|archive-date=2019-12-01|archive-url=https://web.archive.org/web/20191201053656/https://www.independentnews.com/news/bart-pauses-planning-for-dublin-parking-garage/article_2a4c396c-f3c6-11e6-b3b1-bf671dbbe3ef.html|dead-url=no}}</ref><ref name="Richards2015Dec">{{cite news|url=http://www.insidebayarea.com/mr-roadshow/ci_29258642/roadshow-bart-down-i-680-not-consideration|title=Roadshow: BART down I-680 not a consideration|author=Gary Richards|date=December 18, 2015|newspaper=[[San Jose Mercury News]]|accessdate=2016-03-09|archive-date=2016-03-12|archive-url=https://web.archive.org/web/20160312073335/http://www.insidebayarea.com/mr-roadshow/ci_29258642/roadshow-bart-down-i-680-not-consideration|dead-url=no}}</ref><ref>{{cite news|url=http://www.independentnews.com/news/isabel-bart-station-plans-in-the-works/article_937fb3b0-5ce0-11e5-84ac-ff8883328cce.html|title=Isabel BART Station Plans in the Works|date=September 17, 2015|work=The Independent|accessdate=2015-11-01|archive-date=2019-11-30|archive-url=https://web.archive.org/web/20191130101215/https://www.independentnews.com/news/isabel-bart-station-plans-in-the-works/article_937fb3b0-5ce0-11e5-84ac-ff8883328cce.html|dead-url=no}}</ref>额外的筹资也已在2016年底完成。<ref>{{cite news|url=http://www.sfchronicle.com/bayarea/matier-ross/article/Politicians-look-for-way-to-link-BART-to-Central-9537342.php|title=Politicians look for way to link BART to Central Valley|first1=Phil|date=October 3, 2016|work=San Francisco Chronicle|last2=Ross|first2=Andy|accessdate=2016-10-04|last1=Matier|archive-date=2020-11-08|archive-url=https://web.archive.org/web/20201108120351/https://www.sfchronicle.com/bayarea/matier-ross/article/Politicians-look-for-way-to-link-BART-to-Central-9537342.php|dead-url=no}}</ref>

2017年,由于对湾区捷运的计划缺乏兴趣,利市议会提出了建立新的机构来负责延长线的规划和建造。<ref>{{cite news|url=http://www.timesheraldonline.com/article/NH/20170411/SPORTS/170419966|title=Livermore says BART board doesn’t care, wants local control|first1=Angela Ruggiero|date=11 April 2017|accessdate=23 May 2017|agency=Vallejo Times-Herald|last1=Angela Ruggiero|archive-date=2018-06-26|archive-url=https://web.archive.org/web/20180626082942/http://www.timesheraldonline.com/article/NH/20170411/SPORTS/170419966|dead-url=no}}</ref> 此方案同时也得到了[[加利福尼亚州众议院|州众议院]]运输委员会的推荐。<ref name="CloserToTracy">{{cite news|url=http://www.goldenstatenewspapers.com/tracy_press/news/closer-to-a-bart-connection/article_5d034ce6-2bad-11e7-bfba-7ba7e05fa8d0.html|title=Closer to a BART connection|first1=Sam|date=28 April 2017|accessdate=2 June 2017|agency=Tracy Press|last1=Matthews|archive-date=2019-08-19|archive-url=https://web.archive.org/web/20190819160437/http://www.goldenstatenewspapers.com/tracy_press/news/closer-to-a-bart-connection/article_5d034ce6-2bad-11e7-bfba-7ba7e05fa8d0.html|dead-url=no}}</ref>新建立的机构叫{{Translink|en|Tri-Valley-San Joaquin Valley Regional Rail Authority||三谷-圣华金谷区域铁路局}},负责“在三谷地区内,规划和发展经济实惠的、连接湾区捷运和ACE的线路。”<ref>{{cite web|url=https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=201720180AB758|title=AB-758 Transportation: Tri-Valley-San Joaquin Valley Regional Rail Authority.|accessdate=17 October 2017|archive-date=2020-11-24|archive-url=https://web.archive.org/web/20201124121108/https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=201720180AB758|dead-url=no}}</ref>


=== 轻轨化趋势 ===
=== 轻轨化趋势 ===
轻轨化趋势(英语:''BART Metro Vision'')是湾区捷运未来展望里重要的一部分<!-- 原文:Key components of the overall vision for BART's future -->。这个设想包括增加车站密度,提高列车班次,<!-- increased train frequency to allow for "show up and go" service at stations within the system's operational core
这一段我不会翻译... --> ,以及保证服务稳定性。最近一份轻轨化趋势的报告指出,为了保障系统长期的发展潜力,需要进行车辆的更新、海沃德综合基地的修建、和列车控制系统的现代化。<ref name="Vision">{{cite web|url=http://www.transformca.org/sites/default/files/bart_metro_vision_update_0.pdf|title=BART Metro Vision Update|accessdate=2014-07-15|date=April 25, 2013|format=PDF|publisher=[[Bay Area Rapid Transit]] (BART)|archiveurl=https://web.archive.org/web/20140719152429/http://www.transformca.org/sites/default/files/bart_metro_vision_update_0.pdf|archivedate=2014-07-19|deadurl=yes|df=}}</ref>
[[File:BART system map effective May 2018.png|链接=https://zh.wikipedia.org/wiki/File:BART%20system%20map%20effective%20May%202018.png|缩略图|现时的湾区捷运地图。可以看见右上角、安条克站东部还有灰色的虚线,代表计划中的延长线。]]


=== 第二条海湾隧道 ===
=== 第二条海湾隧道 ===
{{Main|跨灣隧道#未来发展}}


=== eBART延长计划 ===
=== eBART延长计划 ===

此线可能继续向东延申至[[奥克利 (加利福尼亚州)|奥克利]]、[[拜伦 (加利福尼亚州)|拜伦]]<ref name="thepress">{{cite news|url=http://www.thepress.net/news/ebart-extension-to-brentwood-still-a-distant-idea/article_475ae892-d342-11e4-bba6-13c2415a5c92.html|title=eBART extension to Brentwood still a distant idea|first1=Kyle|work=The Press|publisher=Brentwood Press & Publishing|accessdate=May 27, 2016|location=[[Brentwood, California]]|last1=Szymanski|archive-date=2019-11-30|archive-url=https://web.archive.org/web/20191130183105/https://www.thepress.net/news/ebart-extension-to-brentwood-still-a-distant-idea/article_475ae892-d342-11e4-bba6-13c2415a5c92.html|dead-url=no}}</ref><ref>{{cite web|url=http://www.bart.gov/sites/default/files/docs/eBART%20Next%20Segment%20Final_013015_2.pdf|title=eBART Next Segment Study|accessdate=January 19, 2016|author=CDM Smith|format=pdf|publisher=[[Bay Area Rapid Transit]] (BART)|archive-date=2017-02-10|archive-url=https://web.archive.org/web/20170210032936/http://www.bart.gov/sites/default/files/docs/eBART%20Next%20Segment%20Final_013015_2.pdf|dead-url=no}}</ref>或[[布伦特伍德 (加利福尼亚州)|布伦特伍德]]。<ref>{{cite news|url=http://www.mercurynews.com/2017/05/12/bart-board-vote-brings-commuter-rail-closer-to-brentwood/|title=BART: Board vote brings commuter rail closer to Brentwood|date=12 May 2017|accessdate=15 May 2017|agency=The Mercury News|archive-date=2018-06-12|archive-url=https://web.archive.org/web/20180612162901/https://www.mercurynews.com/2017/05/12/bart-board-vote-brings-commuter-rail-closer-to-brentwood/|dead-url=no}}</ref>


=== 吉里街线路 ===
=== 吉里街线路 ===
[[File:A Plan for Rapid Transit in San Francisco Consonant with the Bay Area Rapid Transit System (1960) (4007760726).jpg|thumb|300px|right|1960年的湾区轨道交通规划图,其中左上角的"richmond route"则是计划中的吉里大道区间]]
此线路是湾区捷运的初始计划的一部分,在[[马林县 (加利福尼亚州)|马林县]]退出湾区捷运管理局后被搁置。线路沿着{{Translink|en|Geary Boulevard|吉里大道}}向西发展,随后向北转向[[金門大橋 (舊金山)|金门大桥]]。目前此方案还在研究中,可能随着上文的第二条海湾隧道一并开通。<ref name="50thLookAhead2">{{cite news|url=http://www.sfgate.com/bayarea/article/BART-S-NEW-VISION-MORE-BIGGER-FASTER-2584901.php|title=BART's New Vision: More, Bigger, Faster|last=Cabanatuan|first=Michael|date=June 22, 2007|newspaper=[[San Francisco Chronicle]]|accessdate=May 27, 2017|page=A1|archive-date=2018-06-19|archive-url=https://web.archive.org/web/20180619062952/https://www.sfgate.com/bayarea/article/BART-S-NEW-VISION-MORE-BIGGER-FASTER-2584901.php|dead-url=no}}</ref>


=== wBART ===
=== wBART ===
自开通以来,只有里奇蒙区间从来没有延长。在1983年、<ref>{{cite web|url=http://www.zakharymallettbart.com/1983Study.pdf|title=West Contra Costa Extension Study Final Report|accessdate=2017-02-15|publisher=Wilbur Smith and Associates|archiveurl=https://web.archive.org/web/20161013221608/http://www.zakharymallettbart.com/1983Study.pdf|archivedate=13 October 2016|last1=Drake|first1=Gerard}}</ref>1992年、<ref>{{cite web|url=http://www.zakharymallettbart.com/1992Study.pdf|title=West Contra Costa Extension Alignment Study|accessdate=2017-02-15|publisher=Korve Engineering, Inc.|archiveurl=https://web.archive.org/web/20150913152032/http://www.zakharymallettbart.com/1992Study.pdf|archivedate=13 September 2015}}</ref> 和2017年<ref>{{cite web|url=http://westcountytransitstudy.com/wp-content/uploads/2015/08/Jun-2017-WCCTAC-Final-Report.pdf|title=West Contra Costa High-Capacity Transit Study|accessdate=9 August 2017|publisher=West Contra Costa Transportation Advisory Committee|website=West County High-Capacity Transit Study|archive-url=https://web.archive.org/web/20170809130332/http://westcountytransitstudy.com/wp-content/uploads/2015/08/Jun-2017-WCCTAC-Final-Report.pdf|archive-date=2017-08-09|dead-url=yes}}</ref>都有北里奇蒙延长线的方案提出,其中延长现有的捷运线路和使用既有的货运铁路轨道都有考虑过。延长线可能的站点有{{Translink|en|The Shops at Hilltop|山顶商场}}、[[皮诺尔 (加利福尼亚州)|皮诺尔]]、和[[赫拉克勒斯 (加利福尼亚州)|赫拉克勒斯]]{{Translink|en|Hercules Transit Center|赫拉克勒斯枢纽|枢纽}}。2017年发表的评估指出,如果这条延长线在2040年的客流量达到2.2万人次,使用捷运主线的技术(即第三轨供电和“印度”宽轨)建造将耗资36亿美元。<ref>{{cite news|url=http://www.eastbaytimes.com/2017/03/28/west-contra-costa-studying-i-80-corridor-gridlock-solutions/|title=West Contra Costa studying I-80 corridor gridlock solutions|first1=Rick|date=28 March 2017|publisher=East Bay Times|accessdate=9 April 2017|last1=Radin|archive-date=2020-10-27|archive-url=https://web.archive.org/web/20201027064011/https://www.eastbaytimes.com/2017/03/28/west-contra-costa-studying-i-80-corridor-gridlock-solutions/|dead-url=no}}</ref> 然而,此计划却因为湾区捷运董事长和里奇蒙市政府的不和而无法确定:湾区捷运的董事长扎卡里·马利特希望延长线直接从{{Translink|en|El Cerrito del Norte station|艾尔赛里托北站}}开始,而里奇蒙市政府却强烈反对此方案。同时,赫拉克勒斯市政府,由于发展{{Translink|en|Hercules Station & Terminal|赫拉克勒斯枢纽}}的计划,也不支持此延长线。<ref>{{Cite web |url=http://richmondstandard.com/2016/07/29/bart-extension-to-hercules-still-being-studied-and-sorely-needed-director-says/ |title=存档副本 |access-date=2018-06-25 |archive-url=https://web.archive.org/web/20180329083745/http://richmondstandard.com/2016/07/29/bart-extension-to-hercules-still-being-studied-and-sorely-needed-director-says/ |archive-date=2018-03-29 |dead-url=yes }}</ref><ref>{{Cite web |url=http://www.mercurynews.com/2013/05/13/bart-extension-to-hercules-raises-questions-about-housing-density-and-station-location/ |title=存档副本 |access-date=2018-06-25 |archive-date=2019-12-02 |archive-url=https://web.archive.org/web/20191202235501/https://www.mercurynews.com/2013/05/13/bart-extension-to-hercules-raises-questions-about-housing-density-and-station-location/ |dead-url=no }}</ref><ref>{{Cite web |url=http://www.eastbaytimes.com/2013/05/16/hercules-says-no-to-bart-extension-study/ |title=存档副本 |access-date=2018-06-25 |archive-date=2019-12-04 |archive-url=https://web.archive.org/web/20191204150956/https://www.eastbaytimes.com/2013/05/16/hercules-says-no-to-bart-extension-study/ |dead-url=no }}</ref><ref>{{Cite web |url=https://patch.com/california/pinole-hercules/should-bart-extend-to-pinole-and-hercules |title=存档副本 |access-date=2018-06-25 |archive-date=2019-08-16 |archive-url=https://web.archive.org/web/20190816193501/https://patch.com/california/pinole-hercules/should-bart-extend-to-pinole-and-hercules |dead-url=no }}</ref>


=== I-680走廊 ===
=== 680公路通道 ===
在湾区捷运开通50周年时,地铁的设计师提出了一条新的路线。此线将从{{Translink|en|Warm Springs/South Fremont station|温泉/费利蒙南站}},沿着[[680號州際公路 (加利福尼亞州)|680號公路]],依次经过都柏林/普雷森顿站和核桃溪站,并终于[[首府走廊號]]的{{Translink|en|Martinez station|马丁内斯站}}。<ref name="50thLookAhead">{{cite news|url=http://www.sfgate.com/bayarea/article/BART-S-NEW-VISION-MORE-BIGGER-FASTER-2584901.php|title=BART's New Vision: More, Bigger, Faster|last=Cabanatuan|first=Michael|date=June 22, 2007|newspaper=[[San Francisco Chronicle]]|accessdate=May 27, 2017|page=A1|archive-date=2018-06-19|archive-url=https://web.archive.org/web/20180619062952/https://www.sfgate.com/bayarea/article/BART-S-NEW-VISION-MORE-BIGGER-FASTER-2584901.php|dead-url=no}}</ref>


=== <font style="background-color: rgb(254, 246, 231);">门罗公园延长线</font> ===
=== 门罗公园延长线(已撤消) ===
此计划是一个短命计划,在1999年由[[聖馬刁郡 (加利福尼亞州)|聖馬刁郡]]经济发展协会提出。计划的路线是从[[密爾布瑞站]]出发,沿着[[加州火車]]线路到达[[伯灵格姆 (加利福尼亚州)|伯灵格姆]]的[[百老汇站]],接着沿着{{Translink|en|Bayshore Freeway|4=沿岸高速}}并止步于[[门洛帕克 (加利福尼亚州)|門洛公園]],沿途在圣马刁、[[贝尔蒙特 (加利福尼亚州)|贝尔蒙特]]/[[圣卡洛斯 (加利福尼亚州)|圣卡洛斯]]、[[紅木城]]和门罗帕克设站。当时估计的成本是{{US$|2500000000|1999|round=-7}},由圣马刁县增加0.5美分的营业税来征集。<ref>{{cite web|url=http://www.bayrailalliance.org/newsletter/1999/samceda-bart.html|title=SAMCEDA 1999 proposal for BART via 101 to Menlo Park|accessdate=2016-03-15|author=<!--Staff Writer(s); no by-line.-->|date=27 June 2004|website=Bay Rail Alliance|archive-date=2017-05-10|archive-url=https://web.archive.org/web/20170510093519/http://www.bayrailalliance.org/newsletter/1999/samceda-bart.html|dead-url=no}}</ref> 湾区捷运的管理层表示,往圣马刁县南部发展不合时宜,而圣县经发协会也在1999年夏撤回了这一提案。<ref>{{cite news|url=http://www.almanacnews.com/morgue/1999/1999_07_21.bart.html|title=Plan dumped to extend BART down Bayshore Freeway to Menlo Park|author=Softky, Marion|date=July 21, 1999|newspaper=The Almanac News|accessdate=2016-03-15|location=Menlo Park|archive-date=2019-11-02|archive-url=https://web.archive.org/web/20191102062053/https://www.almanacnews.com/morgue/1999/1999_07_21.bart.html|dead-url=no}}</ref>


== 嵌入站 ==
== 嵌入站 ==
目前已经开通的嵌入站只有[[內河碼頭站]]和{{Translink|en|West Dublin/Pleasanton station|西都柏林/普雷森顿站}}。而[[競技場-奧克蘭國際機場線]]上的{{Translink|en|Doolittle Maintenance and Storage Facility|杜立特维护基地}}也会在不久后作为客运车站开通。

目前计划中的嵌入站有奥尔巴尼、卡拉威拉斯、欧文顿和30街/使命街这四个站。<ref name="Vision2">{{cite web|url=http://www.transformca.org/sites/default/files/bart_metro_vision_update_0.pdf|title=BART Metro Vision Update|accessdate=2014-07-15|date=April 25, 2013|format=PDF|publisher=[[Bay Area Rapid Transit]] (BART)|archiveurl=https://web.archive.org/web/20140719152429/http://www.transformca.org/sites/default/files/bart_metro_vision_update_0.pdf|archivedate=2014-07-19|deadurl=yes|df=}}</ref>其中,在现有的24街和葛连公园站之间建造30街站的成本是5亿美元(2003年估计)。<ref name="30str">{{cite web|url=http://www.bart.gov/sites/default/files/docs/30th.c.pdf|title=San Francisco County Planning: 30th Street Infill Station Study|accessdate=2014-07-16|author=John T. Warren and Associates, Inc.|date=May 2003|format=PDF|publisher=[[Bay Area Rapid Transit]] (BART)|page=64|via=http://www.bart.gov/about/planning/sanfrancisco|archive-date=2019-10-29|archive-url=https://web.archive.org/web/20191029150435/https://www.bart.gov/sites/default/files/docs/30th.c.pdf|dead-url=no}}</ref><ref>{{cite news|url=http://www.noevalleyvoice.com/2002/May/bart.html|title=A 30th Street BART Station Would Cost Half a Billion and Take 7 Years to Get Here|first1=Karen|date=May 2002|accessdate=15 August 2017|agency=The Noe Valley Voice|last1=Topakian|archive-date=2020-02-24|archive-url=https://web.archive.org/web/20200224215742/http://www.noevalleyvoice.com/2002/May/bart.html|dead-url=no}}</ref>杰克伦敦广场站,由于不符合[[奥克兰三角线]]的结构被搁置,改用其他方式连接百老汇大道附近。<ref name="alamedaExpan">{{cite web|url=http://www.bart.gov/sites/default/files/docs/JLSFeasibility1.pdf|title=The Jack London BART Feasibility Study|accessdate=2014-07-16|date=December 2004|format=PDF|publisher=[[Bay Area Rapid Transit]] (BART)|pages=17–31|via=http://www.bart.gov/about/planning/alameda|archive-date=2020-11-25|archive-url=https://web.archive.org/web/20201125025058/http://www.bart.gov/sites/default/files/docs/JLSFeasibility1.pdf|dead-url=no}}</ref>欧文顿站则在2017年通过了环评,预计在2024年开通。


== 参考文献 ==
== 参考文献 ==

2024年12月2日 (一) 09:43的最新版本

舊金山灣區捷運系統(BART)开通以来,曾多次延长线路,扩充服务。

目前已经完成的计划有科马和匹兹堡/湾角延长线(1996年)、都柏林/幸福屯延长线(1997年)、旧金山机场/密尔布瑞延长线(2003年)、[1] 连接主线和奥克兰机场的自动导轨系统(2014年)、[2] 温泉延长线(2017年)以及刚刚完成的eBART(2018年)。

正在进行的项目

[编辑]

硅谷延长线

[编辑]
正在施工的贝里耶莎站,摄于2018年3月
湾区捷运在圣何塞市内的延长线,其中1期为紫色,2期为蓝色

硅谷延长线从温泉站到圣何塞的贝里耶莎/圣何塞北站英语Berryessa/North San José station,将湾区捷运和圣克拉拉轻轨连接起来。联邦运输局英语Federal Transit Administration曾在2012年项目刚启动时拨款9亿美元。[3] 目前此项目还在建设中,预计将在2018年投入运营。[4] 计划包括了2期工程:第一期是增加米尔皮塔斯站和贝里耶莎/圣荷西北站,而第二期则是增加阿郎姆岩站英语Alum Rock station圣何塞下城站英语Downtown San Jose station聖何塞狄里登站圣塔克拉拉站

米尔皮塔斯站将位于既有圣克拉拉轻轨的同名车站处[5],而贝里耶莎/圣荷西北站将位于圣何塞跳蚤市场附近。[6]之后,列车将以贝里耶莎/圣荷西北站作为总站,直到2期工程完工。

计划中

[编辑]

最初的计划中,圣何塞延长线是在1期线路之后,继续以地下段进入圣何塞市区和圣克拉拉。然而在2009年2月,由于低于预期的税收,圣克拉拉市交委只好截短延长计划,将圣何塞市中心的地下段单独列为2期工程,并推迟开工。最初的完整延长线估计的成本是61亿美元,而圣市交委则估计,单独完成1期工程将只耗费23亿美元 。[7][8]

市区的地下段起始于101号国道加州段,阿郎姆岩/28街站将会在28街北、朱利安街和圣克拉拉街之间,圣何塞市中心站将会在圣克拉拉街地下、第3街和市场街之间,由市民广场/圣何塞州立大学站和市场街站在2005年的计划里合并而来。[9]另外,狄里登站将位于圣荷西SAP中心圣荷西火车站之间。

随后,地铁线路将向北转进,沿着既有的加州火車线路,在880號州際公路附近钻出地面,并在现有的加铁圣克拉拉站设站。另外,圣何塞机场也规划了一条从机场到圣克拉拉站或狄里登站的短途列车[10]

圣克拉拉郡交委计划用一台盾构机开凿圣何塞市的大部分地下隧道,只有站台部分会使用明挖法[11] 以减少对市区的影响。[12] 在市中心范围进行明挖将是短暂而大范围的影响,包括封闭部分圣克拉拉街、截断圣克拉拉轻轨。如果资金条件允许,延长线将在2026年开通。[13]截止2018年4月,计划在圣克拉拉街地下规划了了一条单洞隧道和 一个明挖的车站。[14]圣郡交委希望能在2019年开始这一期工程。[15]

筹资和投票过程(2000-2008年)

[编辑]

由于圣克拉拉郡在一开始就没有参与捷運管理局,这一延长线是由郡交通局英语Santa Clara Valley Transportation Authority负责建设的。交委调集了初步的资金,这些资金由2000年公投的营业税收形成。2002年12月,交委向联合太平洋铁路以8,000万美元的价格买下了一条货运铁路的路权,作为延长线的主要区间。[16]

2004年,联邦交通部担心湾区捷運没有足够的资金来运营延长线,暂缓了对计划的拨款。[17] 不仅如此,此计划还被评级为“不推荐”,进一步减少了来自联邦的资金。[18]

圣克拉拉郡选举人在2008年通过了“方案B”,将营业税提高了⅛美分。[19]一位联邦交通部推荐的独立分析师认为,提高税收不仅可以保障延长线的运营和维护,还能产生盈余。[20][21][22][23]随后,圣何塞市的选举人在2016年同意了此方案。[24][25]

利佛摩延长线:580公路/三谷地区通道

[编辑]

该延长线将延申都柏林/普莱森顿线的服务至利佛摩,可能的方案有继续延长蓝线、建造类似于EBART柴聯車支线[26][27] 、或者提高接驳巴士的频率。[28]之后,此线可能继续穿过阿拉蒙特关口英语Altamont Pass进入特雷西 、沿着580號公路进入中央谷地、并且/或者依次经过都伯林圣拉蒙丹维尔阿拉莫并通过680號公路到达现有的核桃溪英语Walnut Creek station

目前利佛摩已经有一条通勤铁路——阿拉蒙特走廊快线英语Altamont Corridor Express(ACE)。虽然ACE和湾区捷运没有直接的换乘,但是还是有免费的接驳巴士来往于普雷森顿站英语Pleasanton station都柏林/普莱森顿站英语Dublin/Pleasanton station[29][30][31]

在2010年7月1日,一份可观的方案被提出,并得到了利市议会的支持。此方案包括了建造利佛摩中心站、在凡斯科路上、邻近勞倫斯實驗室桑迪亚实验室的车站。两车站都会有来往ACE的接驳。[32] 然而在一年后,利市议会因为市民的抗议, 而不再支持此方案,转而要求线路沿着580號公路发展,并在格林维尔路和伊莎贝拉大道的路口设站。[33] 随后,湾区捷运在2012年9月发表了准备阶段的环境评估报告,其中提及了在580号公路和伊莎贝拉大道的路口设站,在580号公路和格林维尔路的路口建造停车场,并以接驳巴士连接凡斯科路站英语Vasco Road station[34]土地征用的研究在2015年9月由利佛摩市完成,预计此线能在2026年完成。[35][36][37]额外的筹资也已在2016年底完成。[38]

2017年,由于对湾区捷运的计划缺乏兴趣,利市议会提出了建立新的机构来负责延长线的规划和建造。[39] 此方案同时也得到了州众议院运输委员会的推荐。[40]新建立的机构叫三谷-圣华金谷区域铁路局英语Tri-Valley-San Joaquin Valley Regional Rail Authority,负责“在三谷地区内,规划和发展经济实惠的、连接湾区捷运和ACE的线路。”[41]

轻轨化趋势

[编辑]

轻轨化趋势(英语:BART Metro Vision)是湾区捷运未来展望里重要的一部分。这个设想包括增加车站密度,提高列车班次, ,以及保证服务稳定性。最近一份轻轨化趋势的报告指出,为了保障系统长期的发展潜力,需要进行车辆的更新、海沃德综合基地的修建、和列车控制系统的现代化。[42]

现时的湾区捷运地图。可以看见右上角、安条克站东部还有灰色的虚线,代表计划中的延长线。

第二条海湾隧道

[编辑]

eBART延长计划

[编辑]

此线可能继续向东延申至奥克利拜伦[43][44]布伦特伍德[45]

吉里街线路

[编辑]
1960年的湾区轨道交通规划图,其中左上角的"richmond route"则是计划中的吉里大道区间

此线路是湾区捷运的初始计划的一部分,在马林县退出湾区捷运管理局后被搁置。线路沿着吉里大道英语Geary Boulevard向西发展,随后向北转向金门大桥。目前此方案还在研究中,可能随着上文的第二条海湾隧道一并开通。[46]

wBART

[编辑]

自开通以来,只有里奇蒙区间从来没有延长。在1983年、[47]1992年、[48] 和2017年[49]都有北里奇蒙延长线的方案提出,其中延长现有的捷运线路和使用既有的货运铁路轨道都有考虑过。延长线可能的站点有山顶商场英语The Shops at Hilltop皮诺尔、和赫拉克勒斯枢纽英语Hercules Transit Center。2017年发表的评估指出,如果这条延长线在2040年的客流量达到2.2万人次,使用捷运主线的技术(即第三轨供电和“印度”宽轨)建造将耗资36亿美元。[50] 然而,此计划却因为湾区捷运董事长和里奇蒙市政府的不和而无法确定:湾区捷运的董事长扎卡里·马利特希望延长线直接从艾尔赛里托北站英语El Cerrito del Norte station开始,而里奇蒙市政府却强烈反对此方案。同时,赫拉克勒斯市政府,由于发展赫拉克勒斯枢纽英语Hercules Station & Terminal的计划,也不支持此延长线。[51][52][53][54]

680公路通道

[编辑]

在湾区捷运开通50周年时,地铁的设计师提出了一条新的路线。此线将从温泉/费利蒙南站英语Warm Springs/South Fremont station,沿着680號公路,依次经过都柏林/普雷森顿站和核桃溪站,并终于首府走廊號马丁内斯站英语Martinez station[55]

门罗公园延长线(已撤消)

[编辑]

此计划是一个短命计划,在1999年由聖馬刁郡经济发展协会提出。计划的路线是从密爾布瑞站出发,沿着加州火車线路到达伯灵格姆百老汇站,接着沿着沿岸高速英语Bayshore Freeway并止步于門洛公園,沿途在圣马刁、贝尔蒙特/圣卡洛斯紅木城和门罗帕克设站。当时估计的成本是2,500,000,000美元(相等於2023年的4,570,000,000美元),由圣马刁县增加0.5美分的营业税来征集。[56] 湾区捷运的管理层表示,往圣马刁县南部发展不合时宜,而圣县经发协会也在1999年夏撤回了这一提案。[57]

嵌入站

[编辑]

目前已经开通的嵌入站只有內河碼頭站西都柏林/普雷森顿站英语West Dublin/Pleasanton station。而競技場-奧克蘭國際機場線上的杜立特维护基地英语Doolittle Maintenance and Storage Facility也会在不久后作为客运车站开通。

目前计划中的嵌入站有奥尔巴尼、卡拉威拉斯、欧文顿和30街/使命街这四个站。[58]其中,在现有的24街和葛连公园站之间建造30街站的成本是5亿美元(2003年估计)。[59][60]杰克伦敦广场站,由于不符合奥克兰三角线的结构被搁置,改用其他方式连接百老汇大道附近。[61]欧文顿站则在2017年通过了环评,预计在2024年开通。

参考文献

[编辑]
  1. ^ Celebrating 40 Years of Service 1972 • 2012 Forty BART Achievements Over the Years (pdf). Bay Area Rapid Transit (BART). 2012 [2014-12-02]. (原始内容存档 (PDF)于2013-12-03). 
  2. ^ New BART service to Oakland International Airport now open. Bay Area Rapid Transit (BART). November 21, 2014 [2014-12-02]. (原始内容存档于2021-02-22). 
  3. ^ Mohammed, Aliyah. Milpitas council receives BART extension update. Digital First Media. The Mercury News. April 29, 2016 [2016-05-10]. (原始内容存档于2016-08-29). 
  4. ^ Construction of the Berryessa and Milpitas BART stations. [2018-06-21]. (原始内容存档于2019-12-02). 
  5. ^ VTA's BART Silicon Valley Extension - Milpitas Station. [2018-04-13]. (原始内容存档于2019-07-09). 
  6. ^ VTA's BART Silicon Valley Extension - Berryessa/North San José Station. [2018-04-13]. (原始内容存档于2019-07-06). 
  7. ^ Childress, Brandi. VTA and FTA Seal the Deal for BART Silicon Valley. VTA News. March 12, 2012 [April 13, 2018]. (原始内容存档于2017-10-19). 
  8. ^ BART to Berryessa: Sales tax projections force VTA to scale back plans. San Jose Mercury News. February 27, 2009 [2009-02-27]. (原始内容存档于2014-07-20). 
  9. ^ Minutes of Silicon Valley Rapid Transit Corridor BART Extension Policy Advisory Board Meeting. Santa Clara Valley Transportation Authority (VTA). June 22, 2005 [2007-08-27]. (原始内容存档于2007-09-30). 
  10. ^ San Jose, CA - Official Website - Automated Transit Network. www.sanjoseca.gov. [2018-04-13]. (原始内容存档于2018-04-14) (英语). 
  11. ^ Downtown San Jose Subway Fact Sheet (PDF). Santa Clara Valley Transportation Authority (VTA). May 14, 2002 [2007-08-27]. (原始内容存档 (PDF)于2007-09-27). 
  12. ^ Meacham, Jody. Are you ready for a subway? Digging for BART begins in two years. Silicon Valley Business Journal. January 23, 2017 [2017-02-15]. (原始内容存档于2020-12-02). 
  13. ^ South Bay BART initiatives move forward. KGO-TV ABC San Francisco. May 8, 2009 [2010-09-17]. (原始内容存档于2011-06-29). 
  14. ^ VTA Board Approves Staff Recommendation for BART Silicon Valley Phase II Project. www.vta.org. [2018-04-13]. (原始内容存档于2019-06-20) (英语). 
  15. ^ VTA's BART Silicon Valley Extension - Timeline. www.vta.org. [2018-04-13]. (原始内容存档于2019-06-18). 
  16. ^ Union Pacific closes land and track sale to VTA. Silicon Valley/San Jose Business Journal. December 2002 [2007-08-27]. (原始内容存档于2014-07-24). 
  17. ^ Tom, Bulger. February 2005 Monthly Report for MTC (DOC). Government Relations Inc. February 24, 2005 [2014-07-15]. (原始内容存档于2016-12-29). 
  18. ^ History of BART to the South Bay. San Jose Mercury News. January 8, 2005 [2014-07-15]. (原始内容存档于2014-07-20). 
  19. ^ LIST OF LOCAL MEASURES PRESIDENTIAL GENERAL ELECTION (PDF). COUNTY OF SANTA CLARA 2/3 Vote. November 4, 2008. (原始内容 (PDF)存档于December 19, 2008). 
  20. ^ BOARD OF DIRECTORS MEETING - AGENDA. Santa Clara Valley Transportation Authority (VTA). August 7, 2008 [2014-07-15]. (原始内容 (PDF)存档于2014-07-19). 
  21. ^ Measure B reaches two-thirds approval in late vote counting. San Jose Mercury News. November 17, 2008 [2008-11-17]. (原始内容存档于2016-03-03). 
  22. ^ BART backers pop open champagne, celebrate vision for San Jose's Grand Central Station. San Jose Mercury News. November 21, 2008 [2008-11-21]. (原始内容存档于2016-03-03). 
  23. ^ November 4 Presidential Primary Election SUMMARY RESULTS - MEASURE B. Santa Clara County Government. November 21, 2008 [2008-11-21]. (原始内容存档于2008-11-16). 
  24. ^ Lin II, Rong-Gong. Bay Area voters supporting BART renovation and extension to downtown San Jose. Los Angeles Times. November 9, 2016 [2017-02-15]. (原始内容存档于2018-06-21). 
  25. ^ Meacham, Jody. Are you ready for a subway? Digging for BART begins in two years. Silicon Valley Business Journal. January 23, 2017 [2017-02-15]. (原始内容存档于2020-12-02). 
  26. ^ Livermore Extension. BART. January 23, 2013 [2013-07-26]. (原始内容存档于2021-03-09). 
  27. ^ Matthews, Sam. Closer to a BART connection. Tracy Press. 28 April 2017 [2 June 2017]. (原始内容存档于2019-08-19). 
  28. ^ BART Pauses Planning for Dublin Parking Garage. The Independent. 16 February 2017 [2017-02-16]. (原始内容存档于2019-12-01). 
  29. ^ Pleasanton Station | ACE Rail Stations. Altamont Commuter Express. [2010-08-10]. (原始内容存档于2010-07-03). 
  30. ^ Wheels - Timetables - Route 54 - Pleasanaton Fairgrounds ACE Shuttle. Livermore Amador Valley Transit Authority. [2010-08-10]. (原始内容存档于2011-04-19). 
  31. ^ Wheels - Fares and Sales. Livermore Amador Valley Transit Authority. [2010-08-10]. (原始内容存档于2010-08-01). 
  32. ^ BART Board selects alignment for Livermore extension. Transbayblog.com. [2008-11-17]. (原始内容存档于2020-11-26). 
  33. ^ Courtney, Jennifer. City Council OKs Initiative to Keep BART on I-580. Livermore Patch. July 12, 2011 [2013-01-08]. (原始内容存档于September 10, 2011). 
  34. ^ BART to Livermore Extension Project. Bay Area Rapid Transit (BART). June 12, 2014 [2014-07-16]. (原始内容存档于2021-03-09). 
  35. ^ BART Pauses Planning for Dublin Parking Garage. The Independent. 16 February 2017 [2017-02-16]. (原始内容存档于2019-12-01). 
  36. ^ Gary Richards. Roadshow: BART down I-680 not a consideration. San Jose Mercury News. December 18, 2015 [2016-03-09]. (原始内容存档于2016-03-12). 
  37. ^ Isabel BART Station Plans in the Works. The Independent. September 17, 2015 [2015-11-01]. (原始内容存档于2019-11-30). 
  38. ^ Matier, Phil; Ross, Andy. Politicians look for way to link BART to Central Valley. San Francisco Chronicle. October 3, 2016 [2016-10-04]. (原始内容存档于2020-11-08). 
  39. ^ Angela Ruggiero, Angela Ruggiero. Livermore says BART board doesn’t care, wants local control. Vallejo Times-Herald. 11 April 2017 [23 May 2017]. (原始内容存档于2018-06-26). 
  40. ^ Matthews, Sam. Closer to a BART connection. Tracy Press. 28 April 2017 [2 June 2017]. (原始内容存档于2019-08-19). 
  41. ^ AB-758 Transportation: Tri-Valley-San Joaquin Valley Regional Rail Authority.. [17 October 2017]. (原始内容存档于2020-11-24). 
  42. ^ BART Metro Vision Update (PDF). Bay Area Rapid Transit (BART). April 25, 2013 [2014-07-15]. (原始内容 (PDF)存档于2014-07-19). 
  43. ^ Szymanski, Kyle. eBART extension to Brentwood still a distant idea. The Press (Brentwood, California: Brentwood Press & Publishing). [May 27, 2016]. (原始内容存档于2019-11-30). 
  44. ^ CDM Smith. eBART Next Segment Study (pdf). Bay Area Rapid Transit (BART). [January 19, 2016]. (原始内容存档 (PDF)于2017-02-10). 
  45. ^ BART: Board vote brings commuter rail closer to Brentwood. The Mercury News. 12 May 2017 [15 May 2017]. (原始内容存档于2018-06-12). 
  46. ^ Cabanatuan, Michael. BART's New Vision: More, Bigger, Faster. San Francisco Chronicle. June 22, 2007: A1 [May 27, 2017]. (原始内容存档于2018-06-19). 
  47. ^ Drake, Gerard. West Contra Costa Extension Study Final Report (PDF). Wilbur Smith and Associates. [2017-02-15]. (原始内容 (PDF)存档于13 October 2016). 
  48. ^ West Contra Costa Extension Alignment Study (PDF). Korve Engineering, Inc. [2017-02-15]. (原始内容 (PDF)存档于13 September 2015). 
  49. ^ West Contra Costa High-Capacity Transit Study (PDF). West County High-Capacity Transit Study. West Contra Costa Transportation Advisory Committee. [9 August 2017]. (原始内容 (PDF)存档于2017-08-09). 
  50. ^ Radin, Rick. West Contra Costa studying I-80 corridor gridlock solutions. East Bay Times. 28 March 2017 [9 April 2017]. (原始内容存档于2020-10-27). 
  51. ^ 存档副本. [2018-06-25]. (原始内容存档于2018-03-29). 
  52. ^ 存档副本. [2018-06-25]. (原始内容存档于2019-12-02). 
  53. ^ 存档副本. [2018-06-25]. (原始内容存档于2019-12-04). 
  54. ^ 存档副本. [2018-06-25]. (原始内容存档于2019-08-16). 
  55. ^ Cabanatuan, Michael. BART's New Vision: More, Bigger, Faster. San Francisco Chronicle. June 22, 2007: A1 [May 27, 2017]. (原始内容存档于2018-06-19). 
  56. ^ SAMCEDA 1999 proposal for BART via 101 to Menlo Park. Bay Rail Alliance. 27 June 2004 [2016-03-15]. (原始内容存档于2017-05-10). 
  57. ^ Softky, Marion. Plan dumped to extend BART down Bayshore Freeway to Menlo Park. The Almanac News (Menlo Park). July 21, 1999 [2016-03-15]. (原始内容存档于2019-11-02). 
  58. ^ BART Metro Vision Update (PDF). Bay Area Rapid Transit (BART). April 25, 2013 [2014-07-15]. (原始内容 (PDF)存档于2014-07-19). 
  59. ^ John T. Warren and Associates, Inc. San Francisco County Planning: 30th Street Infill Station Study (PDF). Bay Area Rapid Transit (BART): 64. May 2003 [2014-07-16]. (原始内容存档 (PDF)于2019-10-29) –通过http://www.bart.gov/about/planning/sanfrancisco. 
  60. ^ Topakian, Karen. A 30th Street BART Station Would Cost Half a Billion and Take 7 Years to Get Here. The Noe Valley Voice. May 2002 [15 August 2017]. (原始内容存档于2020-02-24). 
  61. ^ The Jack London BART Feasibility Study (PDF). Bay Area Rapid Transit (BART): 17–31. December 2004 [2014-07-16]. (原始内容存档 (PDF)于2020-11-25) –通过http://www.bart.gov/about/planning/alameda. 