Shuqaiq 2 IWPP: Difference between revisions
Wavelength (talk | contribs) revising letter case—MOS:HEAD |
Removing geodata: {{coord missing|Saudi Arabia}} |
||
(48 intermediate revisions by 22 users not shown) | |||
Line 1: | Line 1: | ||
{{Multiple issues|{{more citations needed|date=June 2014}}{{one source|date=June 2014}}}} |
|||
{{Infobox power station |
{{Infobox power station |
||
| name = Shuqaiq 2 IWPP |
| name = Shuqaiq 2 IWPP |
||
| name_official = |
| name_official = |
||
| image = |
| image = |
||
| |
| image_caption = |
||
| |
| image_alt = |
||
| coordinates = <!-- {{coord| | |region:SA_type:landmark|display=inline,title}} --> |
|||
⚫ | |||
| |
| country = [[Saudi Arabia]] |
||
| location = Shuqaiq, [[Jizan Region|Jizan]] |
|||
| location_map_size = |
|||
⚫ | |||
| location_map_caption = |
|||
⚫ | |||
| location_map_alt = |
|||
⚫ | |||
| lat_d = |
|||
| |
| decommissioned = |
||
| |
| cost = $1,830 million |
||
⚫ | |||
| lat_NS = |
|||
| |
| operator = NOMAC |
||
| th_fuel_primary = Arabian Heavy Crude Oil |
|||
| long_m = |
|||
| |
| th_fuel_secondary = |
||
| |
| th_fuel_tertiary = |
||
| ps_units_operational = 3 [[Mitsubishi Heavy Industries|MHI]] [[Steam turbine#Steam supply and exhaust conditions|STG]]<br>3 MHI [[Boiler (power generation)#Steam generator .28component of prime mover.29|Boiler]]<br>16 MHI [[Reverse Osmosis#Desalination|RO]] Trains |
|||
| coordinates_type = type:landmark |
|||
⚫ | |||
| coordinates_display = inline,title |
|||
| |
| ps_units_uc = |
||
| |
| ps_units_planned = |
||
⚫ | |||
| status = Operational |
|||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
| |
| ps_annual_generation = |
||
| |
| ps_cogeneration = |
||
⚫ | |||
⚫ | |||
| |
| website = |
||
| |
| extra = |
||
| ps_fuel_secondary = |
|||
| ps_fuel_tertiary = |
|||
| ps_units_operational = |
|||
⚫ | |||
| ps_units_uc = 3 [[Mitsubishi Heavy Industries|MHI]] STGs<br />3 MHI Boilers<br />16 MHI [[Reverse Osmosis|RO]] Trains |
|||
| ps_units_planned = |
|||
⚫ | |||
⚫ | |||
⚫ | |||
| ps_thermal_capacity = |
|||
| ps_annual_generation = |
|||
| ps_cogeneration = |
|||
⚫ | |||
| website = |
|||
| extra = |
|||
}} |
}} |
||
'''Shuqaiq 2 IWPP (Independent Water and Power Project)''' is an integrated water and power plant project in Shuqaiq, [[Saudi Arabia]]. Construction of Shuqaiq 2 IWPP began in 2007 and achieved commercial operation in 2010. The |
'''Shuqaiq 2 IWPP (Independent Water and Power Project)''' is an integrated water and power plant project in Shuqaiq, [[Saudi Arabia]]. Construction of Shuqaiq 2 IWPP began in 2007 and achieved commercial operation in 2010. The project's power and desalination units are located adjacent to the existing Shuqaiq 1 power and desalination complex, 105 km south of Abha and 140 km north of [[Jizan]], on the south-western ([[Red Sea]]) coast of Saudi Arabia. |
||
The electricity and water produced at the plant is supplying power to southern grid and water to [[Abha]], [[Jizan]] and other southern cities. The plant is currently on full production. |
The electricity and water produced at the plant is supplying power to southern grid and water to [[Abha]], [[Jizan]] and other southern cities. The plant is currently on full production. |
||
The Project is based on BOO (Build |
The Project is based on BOO ([[Build Own Operate#BOO .28build.E2.80.93own.E2.80.93operate.29|Build Own Operate]]) basis, under a 20-year PWPA (Power and Water Purchase Agreement) for the design, construction, commissioning, testing, ownership, operation and maintenance of a new 850 MW Arabian Heavy Crude Oil fired power and 216,000 m<sup>3</sup>/day (48 MIGD) desalination plant and associated facilities.<ref name=acwa1>{{cite web | url=http://www.acwapower.com/project/5/shuqaiq-water-and-electricity-company.html | title=Shuqaiq Water and Electricity Company | publisher=ACWA News Feed | work=News | accessdate=22 April 2014 | url-status=dead | archiveurl=https://web.archive.org/web/20140322111044/http://www.acwapower.com/project/5/shuqaiq-water-and-electricity-company.html | archivedate=22 March 2014 }}</ref> |
||
==Shareholders== |
==Shareholders== |
||
The plant is owned by SqWEC (Shuqaiq Water & Electricity Company) and shareholders are:<ref name = acwa1/><ref>{{cite web | url=http://www.acwapower.com/news/post/51/acwa-power-increases-its-ownership-in-shuqaiq-sqwec.html | title=ACWA Power Increases its Ownership in Shuqaiq (SqWEC) | publisher=ACWA News Feed | work=News | accessdate=22 April 2014 | url-status=dead | archiveurl=https://web.archive.org/web/20140819211232/http://www.acwapower.com/news/post/51/acwa-power-increases-its-ownership-in-shuqaiq-sqwec.html | archivedate=19 August 2014 }}</ref> |
|||
The plant is owned by SqWEC (Shuqaiq Water & Electricity Company) and shareholders are: |
|||
⚫ | |||
* Public Investment Fund: 32% |
|||
⚫ | |||
* Gulf Investment Council: 20% |
|||
⚫ | |||
Gulf Investment Council: 20% <br/> |
|||
⚫ | |||
==Project schedule== |
==Project schedule== |
||
Line 68: | Line 53: | ||
! Milestone !! Date |
! Milestone !! Date |
||
|- |
|- |
||
| Signature of Agreements LLA, PWPA, EPC |
| Signature of Agreements LLA, PWPA, EPC and O&M || 28-Feb-2007 |
||
|- |
|- |
||
| Financial Close || 27-Mar-2007 |
| Financial Close || 27-Mar-2007 |
||
|- |
|- |
||
| |
| ICOD || 01-May-2010 |
||
|- |
|- |
||
| |
| PCOD || 01-Dec-2010 |
||
|} |
|} |
||
- LLA: Land Lease Agreement<br/> |
|||
- PWPA: Power and Water Purchase Agreement<br/> |
|||
- EPC: Engineering, Procurement, Construction<br/> |
|||
- O&M: Operations and Maintenance<br/> |
|||
- ICOD: Initial Commercial Operation Date<br/> |
|||
- PCOD: Project Commercial Operation Date |
|||
==Plant configuration== |
==Plant configuration== |
||
The Shuqaiq 2 IWPP comprises |
The Shuqaiq 2 IWPP comprises three (3) units of Arabian heavy crude oil fired [[Boiler (power generation)#Steam generator .28component of prime mover.29|boilers]], (3) [[Steam turbine#Steam supply and exhaust conditions|condensing steam turbines]] and one [[Reverse Osmosis#Desalination|reverse osmosis]] water unit comprising 16 trains. The construction of power and desalination plant was carried out by MHI ([[Mitsubishi Heavy Industries]]). |
||
Electricity is fed to the National Grid, SA via 380kV GIS [[Electrical substation| |
Electricity is fed to the National Grid, SA via a 380kV GIS [[Electrical substation|Substation]], which was constructed by [[Areva]], now [[Alstom]]. |
||
== See also == |
|||
{{Portal|Saudi Arabia|Energy}} |
|||
* [[Qurayyah IPP]] |
|||
* [[Rabigh 2 IPP]] |
|||
* [[List of largest power stations in the world]] |
|||
* [[List of power stations in Saudi Arabia]] |
|||
== References == |
|||
{{Reflist}} |
|||
[[Category:Fossil fuel power stations in Saudi Arabia]] |
|||
[[Category:Oil-fired power stations in Saudi Arabia]] |
|||
[[Category:Power stations in Saudi Arabia]] |
[[Category:Power stations in Saudi Arabia]] |
||
[[Category:Integrated water and power plants]] |
|||
{{Powerstation-stub}} |
Latest revision as of 19:52, 12 February 2021
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
|
Shuqaiq 2 IWPP | |
---|---|
Country | Saudi Arabia |
Location | Shuqaiq, Jizan |
Coordinates | 17°39′36″N 42°04′34″E / 17.6599°N 42.0761°E |
Status | Operational |
Construction began | February 28, 2007 |
Commission date | December 1, 2010 |
Construction cost | $1,830 million |
Owners | Shuqaiq Water and Electricity Company |
Operator | NOMAC |
Thermal power station | |
Primary fuel | Arabian Heavy Crude Oil |
IWPP? | Yes |
Power generation | |
Units operational | 3 MHI STG 3 MHI Boiler 16 MHI RO Trains |
Nameplate capacity | 850 MW |
External links | |
Website | www |
Shuqaiq 2 IWPP (Independent Water and Power Project) is an integrated water and power plant project in Shuqaiq, Saudi Arabia. Construction of Shuqaiq 2 IWPP began in 2007 and achieved commercial operation in 2010. The project's power and desalination units are located adjacent to the existing Shuqaiq 1 power and desalination complex, 105 km south of Abha and 140 km north of Jizan, on the south-western (Red Sea) coast of Saudi Arabia.
The electricity and water produced at the plant is supplying power to southern grid and water to Abha, Jizan and other southern cities. The plant is currently on full production.
The Project is based on BOO (Build Own Operate) basis, under a 20-year PWPA (Power and Water Purchase Agreement) for the design, construction, commissioning, testing, ownership, operation and maintenance of a new 850 MW Arabian Heavy Crude Oil fired power and 216,000 m3/day (48 MIGD) desalination plant and associated facilities.[1]
Shareholders
[edit]The plant is owned by SqWEC (Shuqaiq Water & Electricity Company) and shareholders are:[1][2]
- ACWA Power: 40%
- Public Investment Fund: 32%
- Gulf Investment Council: 20%
- Saudi Electricity Company: 8%
Project schedule
[edit]Milestone | Date |
---|---|
Signature of Agreements LLA, PWPA, EPC and O&M | 28-Feb-2007 |
Financial Close | 27-Mar-2007 |
ICOD | 01-May-2010 |
PCOD | 01-Dec-2010 |
- LLA: Land Lease Agreement
- PWPA: Power and Water Purchase Agreement
- EPC: Engineering, Procurement, Construction
- O&M: Operations and Maintenance
- ICOD: Initial Commercial Operation Date
- PCOD: Project Commercial Operation Date
Plant configuration
[edit]The Shuqaiq 2 IWPP comprises three (3) units of Arabian heavy crude oil fired boilers, (3) condensing steam turbines and one reverse osmosis water unit comprising 16 trains. The construction of power and desalination plant was carried out by MHI (Mitsubishi Heavy Industries).
Electricity is fed to the National Grid, SA via a 380kV GIS Substation, which was constructed by Areva, now Alstom.
See also
[edit]- Qurayyah IPP
- Rabigh 2 IPP
- List of largest power stations in the world
- List of power stations in Saudi Arabia
References
[edit]- ^ a b "Shuqaiq Water and Electricity Company". News. ACWA News Feed. Archived from the original on 22 March 2014. Retrieved 22 April 2014.
- ^ "ACWA Power Increases its Ownership in Shuqaiq (SqWEC)". News. ACWA News Feed. Archived from the original on 19 August 2014. Retrieved 22 April 2014.