Jump to content

Shuqaiq 2 IWPP: Difference between revisions

Coordinates: 17°39′36″N 42°04′34″E / 17.6599°N 42.0761°E / 17.6599; 42.0761
From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
Removing geodata: {{coord missing|Saudi Arabia}}
 
(41 intermediate revisions by 22 users not shown)
Line 1: Line 1:
{{Multiple issues|{{more citations needed|date=June 2014}}{{one source|date=June 2014}}}}
{{Infobox power station
{{Infobox power station
| name = Shuqaiq 2 IWPP
| name = Shuqaiq 2 IWPP
| name_official =
| name_official =
| image = Shuqaiq_IWPP.jpg
| image =
| image_size =
| image_caption =
| image_caption = Shuqaiq 2 IWPP
| image_alt =
| coordinates = <!-- {{coord| | |region:SA_type:landmark|display=inline,title}} -->
| image_alt =
| location_map = Saudi Arabia
| country = [[Saudi Arabia]]
| location = Shuqaiq, [[Jizan Region|Jizan]]
| location_map_size =
| status = Operational
| location_map_caption =
| construction_began = {{Start date|2007|02|28}}
| location_map_alt =
| commissioned = {{Start date|2010|12|01}}
| lat_d =
| lat_m =
| decommissioned =
| lat_s =
| cost = $1,830 million
| owner = Shuqaiq Water and Electricity Company
| lat_NS =
| long_d =
| operator = NOMAC
| th_fuel_primary = Arabian Heavy Crude Oil
| long_m =
| long_s =
| th_fuel_secondary =
| long_EW =
| th_fuel_tertiary =
| ps_units_operational = 3 [[Mitsubishi Heavy Industries|MHI]] [[Steam turbine#Steam supply and exhaust conditions|STG]]<br>3 MHI [[Boiler (power generation)#Steam generator .28component of prime mover.29|Boiler]]<br>16 MHI [[Reverse Osmosis#Desalination|RO]] Trains
| coordinates_type = type:landmark
| ps_units_manu_model =
| coordinates_display = inline,title
| country = [[Saudi Arabia]]
| ps_units_uc =
| location = Shuqaiq, [[Jizan Region|Jizan]]
| ps_units_planned =
| ps_units_decommissioned =
| status = Operational
| ps_electrical_capacity = 850 [[Megawatt|MW]]
| construction_began = {{Start date|2007|02|28}}
| ps_electrical_cap_fac =
| commissioned = {{Start date|2010|12|01}}
| decommissioned =
| ps_annual_generation =
| cost = $1,830 million
| ps_cogeneration =
| ps_combined_cycle =
| owner = Shuqaiq Water and Electricity Company
| operator = NOMAC
| website =
| ps_fuel_primary = Arabian Heavy Crude Oil
| extra =
| ps_fuel_secondary =
| ps_fuel_tertiary =
| ps_units_operational =
| ps_units_manu_model =
| ps_units_uc = 3 [[Mitsubishi Heavy Industries|MHI]] STGs<br />3 MHI Boilers<br />16 MHI [[Reverse Osmosis|RO]] Trains
| ps_units_planned =
| ps_units_decommissioned=
| ps_electrical_capacity = 850 [[Megawatt|MW]]
| ps_electrical_cap_fac =
| ps_thermal_capacity =
| ps_annual_generation =
| ps_cogeneration =
| ps_combined_cycle = No
| website =
| extra =
}}
}}


'''Shuqaiq 2 IWPP (Independent Water and Power Project)''' is an integrated water and power plant project in Shuqaiq, [[Saudi Arabia]]. Construction of Shuqaiq 2 IWPP began in 2007 and achieved commercial operation in 2010. The project’s power and desalination units are located adjacent to the existing Shuqaiq 1 power and desalination complex, 105 km south of Abha and 140 km north of [[Jizan]], on the south-western ([[Red Sea]]) coast of Saudi Arabia.
'''Shuqaiq 2 IWPP (Independent Water and Power Project)''' is an integrated water and power plant project in Shuqaiq, [[Saudi Arabia]]. Construction of Shuqaiq 2 IWPP began in 2007 and achieved commercial operation in 2010. The project's power and desalination units are located adjacent to the existing Shuqaiq 1 power and desalination complex, 105&nbsp;km south of Abha and 140&nbsp;km north of [[Jizan]], on the south-western ([[Red Sea]]) coast of Saudi Arabia.


The electricity and water produced at the plant is supplying power to southern grid and water to [[Abha]], [[Jizan]] and other southern cities. The plant is currently on full production.
The electricity and water produced at the plant is supplying power to southern grid and water to [[Abha]], [[Jizan]] and other southern cities. The plant is currently on full production.


The Project is based on BOO (Build, Own & Operate) basis under a 20 year PWPA (Power and Water Purchase Agreement) for the design, construction, commissioning, testing, ownership, operation and maintenance of a new 850 MW Arabian Heavy Crude Oil fired power and 212,000 m3/day (47 MIGD) desalination plant and associated facilities.
The Project is based on BOO ([[Build Own Operate#BOO .28build.E2.80.93own.E2.80.93operate.29|Build Own Operate]]) basis, under a 20-year PWPA (Power and Water Purchase Agreement) for the design, construction, commissioning, testing, ownership, operation and maintenance of a new 850 MW Arabian Heavy Crude Oil fired power and 216,000 m<sup>3</sup>/day (48 MIGD) desalination plant and associated facilities.<ref name=acwa1>{{cite web | url=http://www.acwapower.com/project/5/shuqaiq-water-and-electricity-company.html | title=Shuqaiq Water and Electricity Company | publisher=ACWA News Feed | work=News | accessdate=22 April 2014 | url-status=dead | archiveurl=https://web.archive.org/web/20140322111044/http://www.acwapower.com/project/5/shuqaiq-water-and-electricity-company.html | archivedate=22 March 2014 }}</ref>


==Shareholders==
==Shareholders==


The plant is owned by SqWEC (Shuqaiq Water & Electricity Company) and shareholders are:<ref name = acwa1/><ref>{{cite web | url=http://www.acwapower.com/news/post/51/acwa-power-increases-its-ownership-in-shuqaiq-sqwec.html | title=ACWA Power Increases its Ownership in Shuqaiq (SqWEC) | publisher=ACWA News Feed | work=News | accessdate=22 April 2014 | url-status=dead | archiveurl=https://web.archive.org/web/20140819211232/http://www.acwapower.com/news/post/51/acwa-power-increases-its-ownership-in-shuqaiq-sqwec.html | archivedate=19 August 2014 }}</ref>
The plant is owned by SqWEC (Shuqaiq Water & Electricity Company) and shareholders are:
* [[ACWA Power]]: 40%

* Public Investment Fund: 32%
ACWA Power: 40% <ref>{{cite web | url=http://www.arabnews.com/news/549746== | title=ACWA Power increases its ownership in Shuqaiq | publisher=Arab News| work=News | accessdate=22 April 2014}}</ref><br/>
Public Investment Fund: 32% <br/>
* Gulf Investment Council: 20%
* [[Saudi Electricity Company]]: 8%
Gulf Investment Council: 20% <br/>
Saudi Electricity Company: 8%


==Project schedule==
==Project schedule==
Line 68: Line 53:
! Milestone !! Date
! Milestone !! Date
|-
|-
| Signature of Agreements LLA, PWPA, EPC and O&M || 28- Feb -2007
| Signature of Agreements LLA, PWPA, EPC and O&M || 28-Feb-2007
|-
|-
| Financial Close || 27-Mar-2007
| Financial Close || 27-Mar-2007
Line 86: Line 71:
==Plant configuration==
==Plant configuration==


The Shuqaiq 2 IWPP comprises of three (3) units of Arabian Heavy Crude Oil fired [[boilers]], (3) condensing [[steam turbine|steam turbines]] and one [[Reverse Osmosis|RO]] water unit comprising 16 trains. Power and desalination plant construction was carried out by MHI ([[Mitsubishi Heavy Industries]]).
The Shuqaiq 2 IWPP comprises three (3) units of Arabian heavy crude oil fired [[Boiler (power generation)#Steam generator .28component of prime mover.29|boilers]], (3) [[Steam turbine#Steam supply and exhaust conditions|condensing steam turbines]] and one [[Reverse Osmosis#Desalination|reverse osmosis]] water unit comprising 16 trains. The construction of power and desalination plant was carried out by MHI ([[Mitsubishi Heavy Industries]]).


Electricity is fed to the National Grid, SA via 380kV GIS [[Electrical substation|ESF (Electrical Special Facility)]], which was constructed by [[Areva]], now [[Alstom]].
Electricity is fed to the National Grid, SA via a 380kV GIS [[Electrical substation|Substation]], which was constructed by [[Areva]], now [[Alstom]].


== See also ==
== See also ==
{{Portal|Saudi Arabia|Energy}}
* [[Qurayyah IPP]]
* [[Qurayyah IPP]]
* [[Rabigh 2 IPP]]
* [[Rabigh 2 IPP]]
Line 102: Line 88:
[[Category:Oil-fired power stations in Saudi Arabia]]
[[Category:Oil-fired power stations in Saudi Arabia]]
[[Category:Power stations in Saudi Arabia]]
[[Category:Power stations in Saudi Arabia]]
[[Category:Integrated water and power plants]]





Latest revision as of 19:52, 12 February 2021

Shuqaiq 2 IWPP
Map
CountrySaudi Arabia
LocationShuqaiq, Jizan
Coordinates17°39′36″N 42°04′34″E / 17.6599°N 42.0761°E / 17.6599; 42.0761
StatusOperational
Construction beganFebruary 28, 2007 (2007-02-28)
Commission dateDecember 1, 2010 (2010-12-01)
Construction cost$1,830 million
OwnersShuqaiq Water and Electricity Company
OperatorNOMAC
Thermal power station
Primary fuelArabian Heavy Crude Oil
IWPP?Yes
Power generation
Units operational3 MHI STG
3 MHI Boiler
16 MHI RO Trains
Nameplate capacity850 MW
External links
Websitewww.sqwec.com

Shuqaiq 2 IWPP (Independent Water and Power Project) is an integrated water and power plant project in Shuqaiq, Saudi Arabia. Construction of Shuqaiq 2 IWPP began in 2007 and achieved commercial operation in 2010. The project's power and desalination units are located adjacent to the existing Shuqaiq 1 power and desalination complex, 105 km south of Abha and 140 km north of Jizan, on the south-western (Red Sea) coast of Saudi Arabia.

The electricity and water produced at the plant is supplying power to southern grid and water to Abha, Jizan and other southern cities. The plant is currently on full production.

The Project is based on BOO (Build Own Operate) basis, under a 20-year PWPA (Power and Water Purchase Agreement) for the design, construction, commissioning, testing, ownership, operation and maintenance of a new 850 MW Arabian Heavy Crude Oil fired power and 216,000 m3/day (48 MIGD) desalination plant and associated facilities.[1]

Shareholders

[edit]

The plant is owned by SqWEC (Shuqaiq Water & Electricity Company) and shareholders are:[1][2]

Project schedule

[edit]
Milestone Date
Signature of Agreements LLA, PWPA, EPC and O&M 28-Feb-2007
Financial Close 27-Mar-2007
ICOD 01-May-2010
PCOD 01-Dec-2010

- LLA: Land Lease Agreement
- PWPA: Power and Water Purchase Agreement
- EPC: Engineering, Procurement, Construction
- O&M: Operations and Maintenance
- ICOD: Initial Commercial Operation Date
- PCOD: Project Commercial Operation Date

Plant configuration

[edit]

The Shuqaiq 2 IWPP comprises three (3) units of Arabian heavy crude oil fired boilers, (3) condensing steam turbines and one reverse osmosis water unit comprising 16 trains. The construction of power and desalination plant was carried out by MHI (Mitsubishi Heavy Industries).

Electricity is fed to the National Grid, SA via a 380kV GIS Substation, which was constructed by Areva, now Alstom.

See also

[edit]

References

[edit]
  1. ^ a b "Shuqaiq Water and Electricity Company". News. ACWA News Feed. Archived from the original on 22 March 2014. Retrieved 22 April 2014.
  2. ^ "ACWA Power Increases its Ownership in Shuqaiq (SqWEC)". News. ACWA News Feed. Archived from the original on 19 August 2014. Retrieved 22 April 2014.