Melbourne line: Difference between revisions
Adding geodata: {{coord missing|United Kingdom}} |
Afterbrunel (talk | contribs) m →Final years: typo |
||
(29 intermediate revisions by 21 users not shown) | |||
Line 1: | Line 1: | ||
{{Use dmy dates|date=April 2022}} |
|||
{{Infobox rail line |
{{Infobox rail line |
||
|box_width = auto |
|box_width = auto |
||
Line 5: | Line 6: | ||
|logo = |
|logo = |
||
|logo_width = |
|logo_width = |
||
|image = |
|image = Site of Melbourne, Derbyshire railway station in 2020.jpg |
||
|image_width = 250px |
|image_width = 250px |
||
|caption = |
|caption = |
||
Line 14: | Line 15: | ||
|start = |
|start = |
||
|end = |
|end = |
||
|stations = {{rws|Worthington}},<br>{{rws|Tonge and Breedon}},<br> |
|stations = {{rws|Worthington}},<br />{{rws|Tonge and Breedon}},<br />[[Melbourne railway station (United Kingdom)|Melbourne]] |
||
|routes = |
|routes = |
||
|ridership = |
|||
|open = 1868 ({{rws|Derby Midland}} – |
|open = 1868 ({{rws|Derby Midland}} – [[Melbourne railway station (United Kingdom)|Melbourne]]),<br />1874 ([[Melbourne railway station (United Kingdom)|Melbourne]] – {{rws|Ashby-de-la-Zouch}}),<br />1939 (as military railway) |
||
|close = 1945 (as military railway),<br>1980 (as civilian railway) |
|close = 1945 (as military railway),<br />1980 (as civilian railway) |
||
|owner = [[London, Midland and Scottish Railway|LMS]] (during military use) |
|owner = [[London, Midland and Scottish Railway|LMS]] (during military use) |
||
|operator = [[War Department (United Kingdom)|War Department]] |
|operator = [[War Department (United Kingdom)|War Department]] |
||
|character = |
|character = |
||
|depot = |
|depot = [[Melbourne railway station (United Kingdom)|Melbourne]] |
||
|stock = |
|stock = |
||
|linelength = |
|linelength = |
||
|tracklength = |
|tracklength = |
||
|notrack = |
|||
|gauge = {{RailGauge|sg}} |
|gauge = {{RailGauge|sg}} |
||
|speed = |
|speed = |
||
Line 38: | Line 39: | ||
==Location== |
==Location== |
||
The section used by the military was between junctions near {{rws|Ashby-de-la-Zouch}} in [[Leicestershire]] and {{rws|Chellaston and Swarkestone}} in Derbyshire. Its principal station was |
The section used by the military was between junctions near {{rws|Ashby-de-la-Zouch}} in [[Leicestershire]] and {{rws|Chellaston and Swarkestone}} in Derbyshire. Its principal station was [[Melbourne railway station (United Kingdom)|Melbourne]], which was actually at the hamlet of [[Kings Newton]]. Troops camped mainly at [[Weston-on-Trent]] from 1940. A suspension bridge linked the camp with Kings Newton over the Trent.<ref>Geoff and Celia Swainson, ''Footpaths and Bridleways of Weston-on-Trent'', 1990, at Derbyshire Records Office, Matlock, D3367/4/6.</ref> |
||
==Use as a military railway== |
==Use as a military railway== |
||
Line 44: | Line 45: | ||
In the early stages of the War it was soon realised that the military railway at [[Longmoor Military Railway|Longmoor]] would have to be expanded if the capacity to train the necessary railway personnel was to be met. |
In the early stages of the War it was soon realised that the military railway at [[Longmoor Military Railway|Longmoor]] would have to be expanded if the capacity to train the necessary railway personnel was to be met. |
||
A second training establishment was sought. {{rws|Derby Midland}} was a major railway centre |
A second training establishment was sought. {{rws|Derby Midland}} was a major railway centre and the [[London, Midland and Scottish Railway]] (LMS) staff college there was about to close and its Principal, Colonel Lionel Manton recommended the nearby rural freight line between Derby and Ashby de la Zouch be used as a training line. On 19 November 1939 the section of the line from Chellaston East Junction to the Smisby Road crossing, just north of Ashby, was handed over to the [[War Department (United Kingdom)|War Department]]. It was named the No. 2 Railway Training Centre (No. 1 being at Longmoor).<ref>Railway Magazine, March/April, 1947 - extract in David Birt materials in Melbourne Public library</ref> |
||
The line was named the Melbourne Military Railway after its principal station. Immediately south of [[Chellaston]] East Junction<ref>[http://www.derby-signalling.org.uk/ChellJn.htm Railway Signalling History in the Derby Area: Chellaston Junction]</ref> the railway established its headquarters, consisting of workshops, offices, and engine sheds for eight locomotives. After the war this area became a wagon repair depot. At Kings Newton miles of sidings were built. |
The line was named the Melbourne Military Railway after its principal station. Immediately south of [[Chellaston]] East Junction<ref>[http://www.derby-signalling.org.uk/ChellJn.htm Railway Signalling History in the Derby Area: Chellaston Junction]</ref> the railway established its headquarters, consisting of workshops, offices, and engine sheds for eight locomotives. After the war this area became a wagon repair depot. At Kings Newton miles of sidings were built. |
||
Six locomotives of [[Midland Railway]] origin, by then LMS [[Midland Railway 1377 Class|class 1F 0-6-0T]], were requisitioned by the War Department from 1940 to the end of 1944 to work all traffic on this branch - one being replaced during the war - and others were taken on loan for periods of time including one diesel shunter.<ref>Railway Magazine, January/February, 1946, pp. 53-54 - ″The Melbourne Military Railway"</ref> One of the 1F locomotives, LMS 1708, has been preserved as the only survivor of its class.<ref>[https://preservedbritishsteamlocomotives.com/41708-mr-1418-lms-1708-and-br-41708/ Preserved British Steam Locomotives: 41708 (MR 1418, LMS 1708 and BR 41708)]</ref> |
|||
Initially the railway was to be used for individual training but later it was used for training complete railway operating companies who would work the line for a week at a time. Two such companies were [[Canadian Army|Canadian]]. From July 1941 the Melbourne training regime was linked with that at Longmoor. Basic training took place in Hampshire before transfer to Melbourne where railway engineers undertook eight weeks training and construction engineers undertook 16 weeks training, which included eight weeks at the Kings Newton bridge building school. By the end of 1944 the additional facilities were no longer needed and the line was ready to hand back to the LMS. |
Initially the railway was to be used for individual training but later it was used for training complete railway operating companies who would work the line for a week at a time. Two such companies were [[Canadian Army|Canadian]]. From July 1941 the Melbourne training regime was linked with that at Longmoor. Basic training took place in Hampshire before transfer to Melbourne where railway engineers undertook eight weeks training and construction engineers undertook 16 weeks training, which included eight weeks at the Kings Newton bridge building school. By the end of 1944 the additional facilities were no longer needed and the line was ready to hand back to the LMS. |
||
On 11 July 1940 nine Royal Engineer [[sapper]]s training on the railway were killed by a German bomb dropped on their billet in Church Street, Melbourne. Eight of them are buried in Melbourne Cemetery.<ref>[http://www.cwgc.org/search/cemetery_photos.aspx?cemetery=37736&mode=1 Commonwealth War Graves Commission: Melbourne Cemetery]</ref> |
On 11 July 1940 nine Royal Engineer [[sapper]]s training on the railway were killed by a German bomb dropped on their billet in Church Street, Melbourne. Eight of them are buried in Melbourne Cemetery.<ref>[http://www.cwgc.org/search/cemetery_photos.aspx?cemetery=37736&mode=1 Commonwealth War Graves Commission: Melbourne Cemetery]</ref> The ninth soldier, Lance-Corporal William Wild was cremated at Rochdale Cemetery <ref>''Rochdale Observer'', July 1940</ref> |
||
===Operations=== |
===Operations=== |
||
Line 56: | Line 59: | ||
Major traffic on the line consisted of moving military stores to and from Kings Newton and Tonge, coal from the New [[Lount]] Colliery and lime from Cloud Hill, [[Worthington, Leicestershire|Worthington]]. |
Major traffic on the line consisted of moving military stores to and from Kings Newton and Tonge, coal from the New [[Lount]] Colliery and lime from Cloud Hill, [[Worthington, Leicestershire|Worthington]]. |
||
Eight or more locomotives were in steam daily but most were in very poor condition. They used water mainly pumped from the [[River Trent]] |
Eight or more locomotives were in steam daily but most were in very poor condition. They used water mainly pumped from the [[River Trent]]. |
||
==Final years== |
==Final years== |
||
The railway track was handed back to the LMS on 1 January 1945 who then submitted a bill of £25,265 to the War Department to restore the line |
The railway track was handed back to the LMS on 1 January 1945 who then submitted a bill of £25,265 to the War Department to restore the line but in 1954 the section through Ashby was closed. In 1958 steam power was replaced by diesel on many local lines and large numbers of redundant steam locomotives were stored at Chellaston quarry. In March 1966 [[British Rail]]ways closed Chellaston Quarry Signal Box and the sidings were lifted in 1967 when the line was returned to single track running. BR finally closed the line on 21 May 1980.<ref>{{cite web |url=http://www.derby-signalling.org.uk/ChellJn.htm |title=Focus on ... Chellaston Junction and surrounding area |access-date=18 July 2011}}</ref> In 1988 the track was lifted and the section between Chellaston East Junction and {{rws|Worthington}} was converted into part of [[National Cycle Route 6]].<ref>[http://www.sustrans.org.uk/sustrans-near-you/midlands/463 Sustrans: Derbyshire] {{webarchive|url=https://web.archive.org/web/20091004212705/http://www.sustrans.org.uk/sustrans-near-you/midlands/463 |date=2009-10-04 }}</ref> |
||
==Remains== |
|||
⚫ | |||
There are several remains of the railway: [[buffer stop]]s on the Isley Walton Road, pillars from bridge building in the Trent, the concrete bases of buildings, some derelict brick buildings and remains of engine sheds at Chellaston Quarry.<ref>http://www.flickr.com/photos/comradethompski/sets/72157604964255428/</ref> Additionally, Ashby Tunnel still survives and the eastern portal is accessible from a cutting in Tunnel Wood, although the western portal and its approach cutting have been infilled. |
|||
⚫ | |||
Two locomotives<ref>[[Rolling stock of the Kent & East Sussex Railway (heritage)]]</ref> and a coach<ref>[http://www.kesr.org.uk/stock-register/coaching-stock/lnwr.html Kent & East Sussex Railway: The 'Woolwich' Coach Brake Third (K&ESR No. 67)]</ref> that ran on the line are now owned by the [[Kent and East Sussex Railway]]. |
|||
==See also== |
==See also== |
||
Line 80: | Line 78: | ||
==External links== |
==External links== |
||
* [http://www.catalis.com/about/history/ Catalis] |
* [http://www.catalis.com/about/history/ Catalis] |
||
* [http://www.derbytelegraph.co.uk/Free-wheels-wagons-Laying-tracks-end-war-Europe/story-18577482-detail/story.html/ Derby Telegraph article about war-time Kings Newton and Weston - 01/04/2013] |
|||
{{coord|52.829|-1.415|region:GB|display=title}} |
|||
{{coord missing|United Kingdom}} |
|||
[[Category:Rail transport in Derbyshire]] |
[[Category:Rail transport in Derbyshire]] |
Latest revision as of 16:03, 5 July 2022
Melbourne Line | |
---|---|
Overview | |
Owner | LMS (during military use) |
Locale | Derbyshire, Leicestershire |
Stations | Worthington, Tonge and Breedon, Melbourne |
Service | |
Operator(s) | War Department |
Depot(s) | Melbourne |
History | |
Opened | 1868 (Derby Midland – Melbourne), 1874 (Melbourne – Ashby-de-la-Zouch), 1939 (as military railway) |
Closed | 1945 (as military railway), 1980 (as civilian railway) |
Technical | |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Melbourne line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Melbourne Line was a railway line which ran from Derby to Ashby de la Zouch. It was used by the British Army and Allied engineers during the Second World War from 1939 until late 1944 to prepare them for the invasion of mainland Europe. Engineers practised the demolition and rebuilding of railways and the running and maintenance of a railway line and its rolling stock. There was also a bridge building school at Kings Newton.
Location
[edit]The section used by the military was between junctions near Ashby-de-la-Zouch in Leicestershire and Chellaston and Swarkestone in Derbyshire. Its principal station was Melbourne, which was actually at the hamlet of Kings Newton. Troops camped mainly at Weston-on-Trent from 1940. A suspension bridge linked the camp with Kings Newton over the Trent.[1]
Use as a military railway
[edit]Background
[edit]In the early stages of the War it was soon realised that the military railway at Longmoor would have to be expanded if the capacity to train the necessary railway personnel was to be met.
A second training establishment was sought. Derby Midland was a major railway centre and the London, Midland and Scottish Railway (LMS) staff college there was about to close and its Principal, Colonel Lionel Manton recommended the nearby rural freight line between Derby and Ashby de la Zouch be used as a training line. On 19 November 1939 the section of the line from Chellaston East Junction to the Smisby Road crossing, just north of Ashby, was handed over to the War Department. It was named the No. 2 Railway Training Centre (No. 1 being at Longmoor).[2]
The line was named the Melbourne Military Railway after its principal station. Immediately south of Chellaston East Junction[3] the railway established its headquarters, consisting of workshops, offices, and engine sheds for eight locomotives. After the war this area became a wagon repair depot. At Kings Newton miles of sidings were built.
Six locomotives of Midland Railway origin, by then LMS class 1F 0-6-0T, were requisitioned by the War Department from 1940 to the end of 1944 to work all traffic on this branch - one being replaced during the war - and others were taken on loan for periods of time including one diesel shunter.[4] One of the 1F locomotives, LMS 1708, has been preserved as the only survivor of its class.[5]
Initially the railway was to be used for individual training but later it was used for training complete railway operating companies who would work the line for a week at a time. Two such companies were Canadian. From July 1941 the Melbourne training regime was linked with that at Longmoor. Basic training took place in Hampshire before transfer to Melbourne where railway engineers undertook eight weeks training and construction engineers undertook 16 weeks training, which included eight weeks at the Kings Newton bridge building school. By the end of 1944 the additional facilities were no longer needed and the line was ready to hand back to the LMS.
On 11 July 1940 nine Royal Engineer sappers training on the railway were killed by a German bomb dropped on their billet in Church Street, Melbourne. Eight of them are buried in Melbourne Cemetery.[6] The ninth soldier, Lance-Corporal William Wild was cremated at Rochdale Cemetery [7]
Operations
[edit]Major traffic on the line consisted of moving military stores to and from Kings Newton and Tonge, coal from the New Lount Colliery and lime from Cloud Hill, Worthington.
Eight or more locomotives were in steam daily but most were in very poor condition. They used water mainly pumped from the River Trent.
Final years
[edit]The railway track was handed back to the LMS on 1 January 1945 who then submitted a bill of £25,265 to the War Department to restore the line but in 1954 the section through Ashby was closed. In 1958 steam power was replaced by diesel on many local lines and large numbers of redundant steam locomotives were stored at Chellaston quarry. In March 1966 British Railways closed Chellaston Quarry Signal Box and the sidings were lifted in 1967 when the line was returned to single track running. BR finally closed the line on 21 May 1980.[8] In 1988 the track was lifted and the section between Chellaston East Junction and Worthington was converted into part of National Cycle Route 6.[9]
See also
[edit]- Longmoor Military Railway – Hampshire
References
[edit]- ^ Geoff and Celia Swainson, Footpaths and Bridleways of Weston-on-Trent, 1990, at Derbyshire Records Office, Matlock, D3367/4/6.
- ^ Railway Magazine, March/April, 1947 - extract in David Birt materials in Melbourne Public library
- ^ Railway Signalling History in the Derby Area: Chellaston Junction
- ^ Railway Magazine, January/February, 1946, pp. 53-54 - ″The Melbourne Military Railway"
- ^ Preserved British Steam Locomotives: 41708 (MR 1418, LMS 1708 and BR 41708)
- ^ Commonwealth War Graves Commission: Melbourne Cemetery
- ^ Rochdale Observer, July 1940
- ^ "Focus on ... Chellaston Junction and surrounding area". Retrieved 18 July 2011.
- ^ Sustrans: Derbyshire Archived 2009-10-04 at the Wayback Machine
Print references
[edit]- Cooper, Alan; Leggott, Peter; Sprenger, Cyril (1990). The Melbourne Military Railway: A History of the Railway Training Centre at Melbourne and Kings Newton, 1939–1945. Oakwood Press. ISBN 0-85361-411-3.
- David Birt materials on the Melbourne Military Railway (1985–2002) at Melbourne Public Library, Assembly Rooms, Melbourne, Derbyshire.