Jump to content

Huskur Road metro station: Difference between revisions

Coordinates: 12°50′20″N 77°40′39″E / 12.83901°N 77.67754°E / 12.83901; 77.67754
From Wikipedia, the free encyclopedia
Content deleted Content added
mNo edit summary
mNo edit summary
(14 intermediate revisions by 6 users not shown)
Line 7: Line 7:
| other_name = Veerasandra
| other_name = Veerasandra
| style = Namma Metro
| style = Namma Metro
| image =
| image = Huskur Road metro station (Apr '24).jpg
| image_size =
| image_size =
| image_caption =
| image_caption = Final stages of this metro station as of April 2024
| address = Veer Sandra, Electronic City, Bengaluru, Karnataka 560100
| address = Veerasandra, Electronic City, Bengaluru, Karnataka 560100
| coordinates = {{coord|12.83901|77.67754|display=inline,title}}
| coordinates = {{coord|12.83901|77.67754|display=inline,title}}
| line = {{rcb|Namma Metro|Yellow|croute}}
| line = {{rcb|Namma Metro|Yellow|croute}}
| other =
| other =
| structure = [[Elevated]], [[Double-track railway|Double track]]
| structure = [[Elevated]], [[Double-track railway|Double track]]
| platform = [[Side platform]]<br/>Platform-1 → {{stl|Namma Metro|Central Silk Board}} / [[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]]<br/>Platform-2 → [[Bommasandra metro station|Bommasandra]] <br/><small>''Platform numbers (TBC)''</small>
| platform = [[Side platform]]<br>Platform-1 → {{stl|Namma Metro|Rashtreeya Vidyalaya Road}}<br>Platform-2 → [[Bommasandra metro station|Delta Electronics - Bommasandra]]
| depth =
| depth =
| levels = '''''(TBC)'''''
| levels = '''''(TBC)'''''
| tracks = 2 '''''(TBC)'''''
| tracks = 2
| parking = '''''(TBC)'''''
| parking = '''''(TBC)'''''
| bicycle =
| bicycle =
| baggage_check =
| baggage_check =
| opening = {{start date and age|November 2024|df=y}} '''''(TBC)'''''
| opening = {{start date and age|25 January 2025|df=y}} '''''(TBC)'''''
| closed =
| closed =
| rebuilt =
| rebuilt =
| electrified = 750 [[Volt|V]] [[Direct current|DC]] [[third rail]] '''''(TBC)'''''
| electrified = 750 [[Volt|V]] [[Direct current|DC]] [[third rail]]
| ADA = '''''(TBC)'''''
| accessible = '''''(TBC)'''''
| status = Under Construction
| status = Final Stages before Operations
| code = '''''(TBC)'''''
| code = '''''(TBC)'''''
| owned = [[Bangalore Metro Rail Corporation Ltd]] (BMRCL)
| owned = [[Bangalore Metro Rail Corporation Ltd]] (BMRCL)
Line 44: Line 44:
| pass_system =
| pass_system =
| mpassengers =
| mpassengers =
| services = {{Adjacent stations|system=Namma Metro|line=Yellow|left=Electronic City|to-left=Central Silk Board or Rashtreeya Vidyalaya Road|note-mid=''(Operational around November 2024)''|right=Hebbagodi|to-right=Bommasandra}}
| services = {{Adjacent stations|system=Namma Metro|line=Yellow|left=Konappana Agrahara|to-left=Rashtreeya Vidyalaya Road|note-mid=''(Operational around January 2025)''|right=Hebbagodi|to-right=Bommasandra}}
| route_map = {{BMR Yellow Line}}
| route_map = {{BMR Yellow Line}}
| map_state = collapsed
| map_state = collapsed
Line 53: Line 53:
}}
}}


'''Huskur Road''' (also known as '''Veerasandra''') is an upcoming elevated metro station on the North-South corridor of the [[Yellow Line (Namma Metro)|Yellow Line]] of [[Namma Metro]] in [[Bangalore]], India. Around this metro station holds the M5 E-City Shopping Complex, [[DMart|D-Mart E-City]], E-City Toll Gate towards [[Attibele]] and Veerasandra Lake in South Bengaluru.
'''Huskur Road''' (also known as '''Veerasandra''') is an upcoming elevated metro station on the North-South corridor of the [[Yellow Line (Namma Metro)|Yellow Line]] of [[Namma Metro]] in [[Bangalore]], India.


As per latest reports, the [[Yellow Line (Namma Metro)|Yellow Line]] is stated to be operational around November 2024 due to the upcoming [[Next Indian general election|Indian general election]] which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations. <ref>{{Cite web |date=2024-03-09 |title=Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details |url=https://www.timesnownews.com/bengaluru/bengaluru-metros-yellow-line-to-open-in-november-2024-tejasvi-surya-shares-key-details-article-108351623 |access-date=2024-03-10 |website=TimesNow |language=en}}</ref><ref>{{Cite web |last=DHNS |title=Bengaluru metro's Yellow Line to start only after general elections |url=https://www.deccanherald.com/india/karnataka/bengaluru/metro-s-yellow-line-to-start-only-after-general-elections-2810119 |access-date=2023-12-14 |website=Deccan Herald |language=en}}</ref><ref>{{Cite web |title=RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah |url=https://www.newindianexpress.com/cities/bengaluru/2023/oct/21/rv-road-bommasandra-metro-stretch-to-open-by-april-cmsiddaramaiah-2625902.html |access-date=2023-11-11 |website=The New Indian Express}}</ref><ref>{{Cite news |date=2023-10-21 |title=Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah |url=https://timesofindia.indiatimes.com/city/bengaluru/metro-yellow-line-to-e-city-extended-green-line-to-open-by-april-2024-cm/articleshow/104596905.cms |access-date=2023-11-11 |work=The Times of India |issn=0971-8257}}</ref><ref>{{Cite web |date=2023-10-06 |title=Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya |url=https://www.hindustantimes.com/cities/bengaluru-news/bengaluru-metros-yellow-line-connecting-bommasandra-to-silk-board-to-open-by-february-2024-says-mp-tejasvi-surya-101696567296928.html |access-date=2023-11-11 |website=Hindustan Times |language=en}}</ref>
As per latest reports, the [[Yellow Line (Namma Metro)|Yellow Line]] is slated to be operational between '''2nd & 4th weeks of January 2025<ref name=":5">{{Cite web |title=Bengaluru: Yellow Line safety clearance by December end, opening after second week of January |url=https://www.deccanherald.com/india/karnataka/bengaluru/bengaluru-yellow-line-safety-clearance-by-december-end-opening-after-second-week-of-january-3252267 |access-date=2024-10-29 |website=Deccan Herald |language=en}}</ref>''' due to lack of train sets which are needed for commencement of commercial operations.<ref>{{Cite web |date=2024-03-09 |title=Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details |url=https://www.timesnownews.com/bengaluru/bengaluru-metros-yellow-line-to-open-in-november-2024-tejasvi-surya-shares-key-details-article-108351623 |access-date=2024-03-10 |website=TimesNow |language=en}}</ref><ref>{{Cite web |last=DHNS |title=Bengaluru metro's Yellow Line to start only after general elections |url=https://www.deccanherald.com/india/karnataka/bengaluru/metro-s-yellow-line-to-start-only-after-general-elections-2810119 |access-date=2023-12-14 |website=Deccan Herald |language=en}}</ref><ref>{{Cite web |title=RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah |url=https://www.newindianexpress.com/cities/bengaluru/2023/oct/21/rv-road-bommasandra-metro-stretch-to-open-by-april-cmsiddaramaiah-2625902.html |access-date=2023-11-11 |website=The New Indian Express}}</ref><ref>{{Cite news |date=2023-10-21 |title=Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah |url=https://timesofindia.indiatimes.com/city/bengaluru/metro-yellow-line-to-e-city-extended-green-line-to-open-by-april-2024-cm/articleshow/104596905.cms |access-date=2023-11-11 |work=The Times of India |issn=0971-8257}}</ref><ref>{{Cite web |date=2023-10-06 |title=Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya |url=https://www.hindustantimes.com/cities/bengaluru-news/bengaluru-metros-yellow-line-connecting-bommasandra-to-silk-board-to-open-by-february-2024-says-mp-tejasvi-surya-101696567296928.html |access-date=2023-11-11 |website=Hindustan Times |language=en}}</ref>

== History ==
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Huskur Road metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro. On 25 March 2017, ITD-ITD Cementation [[Joint venture|JV]] was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.<ref>{{Cite web |date=2017-03-25 |title=ITD-ITD Cem JV Lowest Bidder for B'lore Metro's Bomasandra-HosaRd |url=https://themetrorailguy.com/2017/03/25/itd-itd-cem-jv-lowest-bidder-for-blore-metros-bommasandra-hosard/ |access-date=2024-10-23 |website=The Metro Rail Guy |language=en-US}}</ref> Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.


== Station layout ==
== Station layout ==
Line 66: Line 69:
| collapsible = no
| collapsible = no
| map = vCONTgfa
| map = vCONTgfa
cBS\vSTR\cBS ~~ ~~ ~~ to {{stl|Namma Metro|Electronic City}}
cPLT\vSTR\cPLT ~~ ~~ ~~ to [[Konappana Agrahara metro station|Infosys Foundation Konappana Agrahara]]
*'''P1'''\cBS\vSTR\cBS\*'''P2'''
*'''P1'''\cPLT\vSTR\cPLT\*'''P2'''
cBS\vSTR\cBS ~~ ~~ ~~ to [[Hebbagodi metro station|Biocon Hebbagodi]]
cPLT\vSTR\cPLT ~~ ~~ ~~ to [[Hebbagodi metro station|Biocon Hebbagodi]]
vCONTgfe
vCONTgfe
| bottom = <div style="width:23.5em;text-align:center">Station with two tracks and two side platforms</div>
| bottom = <div style="width:23.5em;text-align:center">Station with two tracks and two side platforms</div>
}}}}
}}}}
{|table border=0 cellspacing=0 cellpadding=3
{|table border=0 cellspacing=0 cellpadding=3
|style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width=50 valign=top|'''G'''
|style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width=30 valign=top|'''G'''
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=100 valign=top|Street level
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=85 valign=top|Street level
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=500 valign=top|Exit/Entrance
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=500 valign=top|Exit/Entrance
|-
|-
|valign=top|'''L1'''
|valign=top|'''L1'''
|valign=top|Mezzanine
|valign=top|Mezzanine
|valign=top|Fare control, station agent, Metro Card vending machines, crossover<br/>
|valign=top|Fare control, station agent, Metro Card vending machines, crossover<br>
|-
|-
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=50 rowspan=4 valign=top|'''L2'''
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=30 rowspan=4 valign=top|'''L2'''
|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small>
|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small>
|-
|-
|style="border-bottom:solid 1px gray;" width=100|<span style=color:#{{rail color|Namma Metro|Yellow}}>'''Platform 2'''<br/>'''Southbound'''</span>
|style="border-bottom:solid 1px gray;" width=85|<span style=color:#{{rail color|Namma Metro|Yellow}}>'''Platform 2'''<br>'''Southbound'''</span>
|style="border-bottom:solid 1px gray;" width=500|Towards → [[Bommasandra metro station|Bommasandra]] <small>next station is [[Hebbagodi metro station|Biocon Hebbagodi]]</small>
|style="border-bottom:solid 1px gray;" width=500|Towards → [[Bommasandra metro station|Delta Electronics - Bommasandra]]<br><small>'''Next Station:''' [[Hebbagodi metro station|Biocon Hebbagodi]]</small>
|-
|-
|<span style=color:#{{rail color|Namma Metro|Yellow}}>'''Platform 1'''<br/>'''Northbound'''</span>
|<span style=color:#{{rail color|Namma Metro|Yellow}}>'''Platform 1'''<br>'''Northbound'''</span>
|Towards ← {{stl|Namma Metro|Central Silk Board}} / [[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]] <small>next station is [[Electronic City metro station|Electronic City]]</small>
|Towards ← {{stl|Namma Metro|Rashtreeya Vidyalaya Road}}<br><small>'''Next Station:''' [[Konappana Agrahara metro station|Infosys Foundation Konappana Agrahara]]</small>
|-
|-
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2 align=center|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small>
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2 align=center|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small>
|-
|-
|style="border-bottom:solid 1px gray;" width=50 rowspan=2 valign=top|'''L2'''
|style="border-bottom:solid 1px gray;" width=30 rowspan=2 valign=top|'''L2'''
|style="border-bottom:solid 1px gray;" width=100|
|style="border-bottom:solid 1px gray;" width=85|
|style="border-bottom:solid 1px gray;" width=500|
|style="border-bottom:solid 1px gray;" width=500|
|-
|-
Line 99: Line 102:


==Entry/Exits==
==Entry/Exits==
{{Empty section|date=August 2023}}
{{Empty section|date=December 2024}}


==See also==
==See also==

Revision as of 13:17, 11 December 2024

Huskur Road
Namma Metro station
Final stages of this metro station as of April 2024
General information
Other namesVeerasandra
LocationVeerasandra, Electronic City, Bengaluru, Karnataka 560100
Coordinates12°50′20″N 77°40′39″E / 12.83901°N 77.67754°E / 12.83901; 77.67754
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics - Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusFinal Stages before Operations
Station code(TBC)
History
Opening25 January 2025; 18 days' time (25 January 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Konappana Agrahara Yellow Line
(Operational around January 2025)
Hebbagodi
towards Bommasandra
Location
Map

Huskur Road (also known as Veerasandra) is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India.

As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025[1] due to lack of train sets which are needed for commencement of commercial operations.[2][3][4][5][6]

History

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Huskur Road metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro. On 25 March 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[7] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

Station Layout (TBC)

Huskur Road track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics - Bommasandra
Next Station: Biocon Hebbagodi
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Infosys Foundation Konappana Agrahara
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

See also

References

  1. ^ "Bengaluru: Yellow Line safety clearance by December end, opening after second week of January". Deccan Herald. Retrieved 29 October 2024.
  2. ^ "Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details". TimesNow. 9 March 2024. Retrieved 10 March 2024.
  3. ^ DHNS. "Bengaluru metro's Yellow Line to start only after general elections". Deccan Herald. Retrieved 14 December 2023.
  4. ^ "RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah". The New Indian Express. Retrieved 11 November 2023.
  5. ^ "Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah". The Times of India. 21 October 2023. ISSN 0971-8257. Retrieved 11 November 2023.
  6. ^ "Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya". Hindustan Times. 6 October 2023. Retrieved 11 November 2023.
  7. ^ "ITD-ITD Cem JV Lowest Bidder for B'lore Metro's Bomasandra-HosaRd". The Metro Rail Guy. 25 March 2017. Retrieved 23 October 2024.