Jayadeva Hospital metro station

Coordinates: 12°55′00″N 77°36′00″E / 12.916744°N 77.600117°E / 12.916744; 77.600117
From Wikipedia, the free encyclopedia

Jayadeva Hospital
Namma Metro station
Side view of Under Construction of this metro station under Yellow Line and Pink Line of Namma Metro
General information
LocationJayadeva Junction, BHBCS Layout, BTM Layout Stage 2, Bengaluru, Karnataka 560076
Coordinates12°55′00″N 77°36′00″E / 12.916744°N 77.600117°E / 12.916744; 77.600117
Elevation29 m (95 ft) from Street Level (TBC)
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Yellow Line Pink Line
Platforms  Side platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics - Bommasandra

  Side platform
Platform-3 → Kalena Agrahara
Platform-4 → Nagawara
Platform numbers (TBC)
Tracks4
Construction
Structure typeElevated, Double track x2
Platform levels4
Accessible(TBC)
ArchitectHCC - URC Construction JV &
GR Infra Projects Ltd.
Other information
Status  Awaiting train sets
  Under Construction
History
Opening  January 2025 (January 2025) (TBC)
  December 2025 (December 2025) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Ragigudda Yellow Line
(Operational around January 2025)
BTM Layout
towards Bommasandra
Tavarekere
towards Nagawara
Pink Line
(Operational around December 2025)
JP Nagar 4th Phase
Location
Map

Jayadeva Hospital is an upcoming double-elevated interchange metro station on the North-South corridor of the Yellow Line and Pink Line[1] of Namma Metro in Bangalore, India. This metro station will be the first multi-elevated interchange metro station in the Namma Metro network. This metro station is named after the Sri Jayadeva Institute of Cardiovascular Sciences and Research which is located nearby and serves MICO Layout (BTM), Gurappanapalya, Jayanagar and JP Nagar 3rd Phase.

As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025[2] due to lack of train sets which are needed for commencement of commercial operations. Meanwhile, the elevated section of Pink Line covering a distance of 7.5km (Kalena Agrahara - Tavarekere), is expected to be operational around December 2025. [3][4][5]

History

[edit]

Yellow Line

[edit]

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Jayadeva Hospital metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[6] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

[edit]

This metro station will consist of five levels from underground to the top level as given below:

  • Level 1 → Underpass connecting Bilekahalli and Dairy Circle (Bannerghatta Road)
  • Level 2 → Street Level road (Marenahalli / Outer Ring Road)
  • Level 3 → Elevated Flyover from Ragigudda to Central Silk Board
  • Level 4 → Yellow Line Platforms
  • Level 5 → Concourse (Mezzanine)
  • Level 6 → Pink Line Platforms

Station layout (TBC)

[edit]
Jayadeva Hospital track layout (TBC)
P#
P#
Station with two tracks and two side platforms
Jayadeva Hospital track layout (TBC)
P#
P#
Station with two tracks and two side platforms
** Construction yet to begin
UG Underpass level Bilekahalli - Dairy Circle Underpass
G Street level Exit/Entrance
L1 Flyover Ragigudda - Silk Board Flyover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Eastbound
Towards → Delta Electronics - Bommasandra
Next Station: BTM Layout
Platform #
Westbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Ragigudda
Side platform | Doors will open on the left Disabled access
L3 Mezzanine Automatic Fare Collection gates, station agent, crossover
L4 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Kalena Agrahara
Next Station: JP Nagar 4th Phase
Change at the next station for Orange Line ** (Under Construction)
Platform #
Northbound
Towards ← Nagawara
Next Station: Tavarekere
Side platform | Doors will open on the left Disabled access
L4 Platform Numbers (TBC)

See also

[edit]

References

[edit]
  1. ^ "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. ^ "Bengaluru: Yellow Line safety clearance by December end, opening after second week of January". Deccan Herald. Retrieved 29 October 2024.
  3. ^ "Bengaluru: Namma Metro pushes Pink Line deadline to December 2026". Deccan Herald. Retrieved 4 November 2024.
  4. ^ "Namma Metro's Pink line likely to open in phases". The Hindu. 4 August 2024. ISSN 0971-751X. Retrieved 7 August 2024.
  5. ^ "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  6. ^ "HCC-URC JV Lowest Bidder for Bangalore Metro's RV Rd - HSR Layout". The Metro Rail Guy. 16 May 2017. Retrieved 23 October 2024.
[edit]