Nagawara metro station: Difference between revisions
JJMC89 bot (talk | contribs) m Replace BSicon(s): STR+BSl→PSTR(L), STR+BSr→PSTR(R), cBS→cPLT |
Indigoball (talk | contribs) No edit summary Tags: Mobile edit Mobile web edit |
||
(16 intermediate revisions by 8 users not shown) | |||
Line 6: | Line 6: | ||
| type = {{Namma Metro Infobox station line|line=Pink|line2=Blue}} |
| type = {{Namma Metro Infobox station line|line=Pink|line2=Blue}} |
||
| style = Namma Metro |
| style = Namma Metro |
||
| image = |
| image = Nagawara metro station (Oct '24).jpg |
||
| image_size = |
| image_size = |
||
| image_caption = Under Construction of Nagawara metro station under [[Pink Line (Namma Metro)|Pink Line]] of [[Namma Metro]] as of October 2024 |
|||
| image_caption = |
|||
| address = 5th Block, Ashwath Nagar, HBR Layout, Bengaluru, Karnataka 560045 |
| address = 5th Block, Ashwath Nagar, HBR Layout, Bengaluru, Karnataka 560045 |
||
| coordinates = {{coord|13.04051|77.62466|display=inline,title}} |
| coordinates = {{coord|13.04051|77.62466|display=inline,title}} |
||
Line 14: | Line 14: | ||
| other = |
| other = |
||
| structure = Underground ([[Pink Line (Namma Metro)|Pink Line]]), [[Elevated]] ([[Blue Line (Namma Metro)|Blue Line]]) & [[Double track]] x2 |
| structure = Underground ([[Pink Line (Namma Metro)|Pink Line]]), [[Elevated]] ([[Blue Line (Namma Metro)|Blue Line]]) & [[Double track]] x2 |
||
| platform = [[Island platform]] <small>''(TBC)''</small><br |
| platform = [[Island platform]] <small>''(TBC)''</small><br>{{font color|#{{rail color|Namma Metro|Pink}}|Platform-1}} → {{stl|Namma Metro|Kalena Agrahara}}<br>{{font color|#{{rail color|Namma Metro|Pink}}|Platform-2}} → Train Terminates Here<br>[[Side platform]] <small>''(TBC)''</small><br>{{font color|blue|Platform-3}} → {{stl|Namma Metro|Krishnarajapura}} / {{stl|Namma Metro|Central Silk Board}}<br>{{font color|blue|Platform-4}} → {{stl|Namma Metro|KIAL Terminals}}<br><small>''Platform numbers (TBC)''</small> |
||
| operator = [[Namma Metro]] |
| operator = [[Namma Metro]] |
||
| depth = |
| depth = |
||
Line 24: | Line 24: | ||
| baggage_check = |
| baggage_check = |
||
| opened = |
| opened = |
||
| opening = {{color box|#{{rail color|Namma Metro|Pink}}}} {{start date and age| |
| opening = {{color box|#{{rail color|Namma Metro|Pink}}}} {{start date and age|December 2026|df=y}} <small>'''''(TBC)'''''</small><br>{{color box|#{{rail color|Namma Metro|Blue}}}} {{start date and age|June 2026|df=yes}} <small>'''''(TBC)'''''</small> |
||
| closed = |
| closed = |
||
| rebuilt = |
| rebuilt = |
||
| electrified = '''''(TBC)''''' |
| electrified = '''''(TBC)''''' |
||
| |
| accessible = '''''(TBC)''''' |
||
| status = Under Construction |
| status = Under Construction |
||
| code = '''''(TBC)''''' |
| code = '''''(TBC)''''' |
||
| owned = [[Bangalore Metro Rail Corporation Ltd]] (BMRCL) |
| owned = [[Bangalore Metro Rail Corporation Ltd]] (BMRCL) |
||
| architect = |
| architect = {{color box|#{{rail color|Namma Metro|Pink}}}} ITD Cementation India Ltd.<br> |
||
{{color box|#{{rail color|Namma Metro|Blue}}}} Nagarjuna Construction Company (NCC) |
|||
| architectural_style = |
| architectural_style = |
||
| wifi = |
| wifi = |
||
Line 45: | Line 46: | ||
| pass_system = |
| pass_system = |
||
| mpassengers = |
| mpassengers = |
||
| services = {{Adjacent stations|system=Namma Metro|line1=Pink|left1=|to-left1=Nagawara|note-mid1=''( |
| services = {{Adjacent stations|system=Namma Metro|line1=Pink|left1=|to-left1=Nagawara|note-mid1=''(Operational around December 2026)''|right1=Kadugundanahalli|to-right1=|line2=Blue|left2=HBR Layout|to-left2=Krishnarajapura or Central Silk Board|note-mid2=''(Operational around June 2026)''|right2=Veerannapalya|to-right2=KIAL Terminals}} |
||
| route_map = {{BMR Pink line}} {{BMR Blue Line}} |
| route_map = {{BMR Pink line}} {{BMR Blue Line}} |
||
| map_state = collapsed |
| map_state = collapsed |
||
Line 52: | Line 53: | ||
| mapframe-zoom = 14 |
| mapframe-zoom = 14 |
||
}} |
}} |
||
'''Nagawara''' is an upcoming important underground northern terminal metro station on the North-South corridor of the [[Pink Line (Namma Metro)|Pink Line]]<ref>{{Cite web |title=Bengaluru Metro Pink Line: Explore the City Like Never Before! - TimesProperty |url=https://timesproperty.com/news/post/all-about-bengaluru-metro-Pink-line-blid5532 |access-date=2023-12-14 |website=timesproperty.com}}</ref> and upcoming elevated metro station on the [[Blue Line (Namma Metro)|Blue Line]]<ref>{{Cite web |title=Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty |url=https://timesproperty.com/news/post/all-about-bengaluru-metro-blue-line-blid5532 |access-date=2023-12-14 |website=timesproperty.com}}</ref> of [[Namma Metro]] in [[ |
'''Nagawara''' is an upcoming important underground northern terminal metro station on the North-South corridor of the [[Pink Line (Namma Metro)|Pink Line]]<ref>{{Cite web |title=Bengaluru Metro Pink Line: Explore the City Like Never Before! - TimesProperty |url=https://timesproperty.com/news/post/all-about-bengaluru-metro-Pink-line-blid5532 |access-date=2023-12-14 |website=timesproperty.com}}</ref> and upcoming elevated metro station on the [[Blue Line (Namma Metro)|Blue Line]]<ref>{{Cite web |title=Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty |url=https://timesproperty.com/news/post/all-about-bengaluru-metro-blue-line-blid5532 |access-date=2023-12-14 |website=timesproperty.com}}</ref> of [[Namma Metro]] in [[Bengaluru]], India. This metro station will be an [[Interchange station|interchange]] metro station between [[Pink Line (Namma Metro)|Pink Line]] and [[Blue Line (Namma Metro)|Blue Line]]. |
||
This metro station will |
This metro station will consist of the main '''Nagawara Junction''' which leads to [[Thanisandra]], [[Yelahanka]] in the northside, [[Kalyan Nagar]], [[Krishnarajapuram]] in the eastside, [[Bangalore East railway station|Bangalore East]], [[Bangalore Cantonment railway station|Bangalore Cantonment]] in the southside and [[Hebbal, Bangalore|Hebbal]], [[Yeswanthpur]] in the westside. It will also include prime locations like MSR Elements Mall, Bhartiya City and [[Manyata Embassy Business Park]]. |
||
As per the latest updates, this metro station, under the second phase ('''Pink Line'''), covering the total distance of 13.8 km stretch ([[Dairy Circle metro station|Dairy Circle]] - '''Nagawara''') is expected to be operational around ''December 2026'' <ref>{{Cite web |title=Bengaluru: Namma Metro pushes Pink Line deadline to December 2026 |url=https://www.deccanherald.com/india/karnataka/bengaluru/bengaluru-namma-metro-pushes-pink-line-deadline-to-december-2026-3256417 |access-date=2024-11-04 |website=Deccan Herald |language=en}}</ref><ref>{{Cite news |last=Bureau |first=The Hindu |date=2024-08-04 |title=Namma Metro’s Pink line likely to open in phases |url=https://www.thehindu.com/news/national/karnataka/namma-metros-pink-line-likely-to-open-in-phases/article68484715.ece |access-date=2024-08-07 |work=The Hindu |language=en-IN |issn=0971-751X}}</ref><ref>{{Cite web |date=2023-06-25 |title=Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute |url=https://www.timesnownews.com/bengaluru/namma-metros-pink-line-this-upcoming-corridor-is-set-to-redefine-the-city-commute-article-101255989 |access-date=2023-12-15 |website=TimesNow |language=en}}</ref><ref>{{Cite web |date=2024-02-10 |title=Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM |url=https://www.timesnownews.com/bengaluru/namma-metro-phase-2-in-bengaluru-to-be-operational-by-2025-announces-karnataka-deputy-cm-dk-shivakumar-article-107571304 |access-date=2024-02-12 |website=TimesNow |language=en}}</ref><ref>{{Cite web |author=Staff Reporter |date=2023-09-27 |title=Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024 |url=https://www.metrorailnews.in/good-news-pink-line-of-bengaluru-metro-to-be-90-ready-by-second-half-of-2024/ |access-date=2023-12-15 |website=Metro Rail News |language=en-US}}</ref><ref>{{Cite web |date=2024-01-31 |title=Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week |url=https://www.timesnownews.com/bengaluru/namma-metro-bengalurus-under-construction-pink-line-slated-to-achieve-2-milestones-in-a-week-article-107286084 |access-date=2024-02-01 |website=TimesNow |language=en}}</ref> (under '''Blue Line''') around June 2026.<ref>{{Cite web |title=Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL |url=https://www.newindianexpress.com/cities/bengaluru/2023/sep/16/metros-orr-airport-line-to-be-ready-by-sept-2026-will-benefit-it-industry-hugely-bmrcl-2615489.html |access-date=2023-12-14 |website=The New Indian Express}}</ref><ref>{{Cite web |date=2023-06-07 |title=Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by Q2 of 2024 / March 2025 |url=https://www.timesnownews.com/bengaluru/bengaluru-airport-metro-line-from-kia-to-devanahalli-set-for-completion-by-june-2026-article-100827006 |access-date=2023-12-14 |website=TimesNow |language=en}}</ref><ref>{{Cite web |date=2023-06-06 |title=Metro line to Bengaluru Airport to be ready by Q2 of 2024 / March 2025: D K Shivakumar |url=https://indianexpress.com/article/cities/bangalore/metro-bengaluru-airport-june-2026-d-k-shivakumar8649143/ |access-date=2023-12-14 |website=The Indian Express |language=en}}</ref><ref>{{Cite web |title=L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B {{!}} Metro Rail Today |url=https://metrorailtoday.com/news/lt-bags-track-contracts-worth-501-crore-for-bangalore-metro-phase-2a-2b |access-date=2023-12-14 |website=Metro Rail Today: Gateway to Rail & Metro Industry}}</ref><ref>{{Cite web |date=2023-06-06 |title=Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar |url=https://indianexpress.com/article/cities/bangalore/metro-bengaluru-airport-june-2026-d-k-shivakumar8649143/ |access-date=2023-12-14 |website=The Indian Express |language=en}}</ref><ref>{{Cite web |date=2023-06-07 |title=Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026 |url=https://www.timesnownews.com/bengaluru/bengaluru-airport-metro-line-from-kia-to-devanahalli-set-for-completion-by-june-2026-article-100827006 |access-date=2023-12-14 |website=TimesNow |language=en}}</ref> |
|||
== History == |
== History == |
||
=== Pink Line === |
|||
In June 2017, Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for constructing the Nagawara metro station along the 4.59 |
In June 2017, Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for constructing the Nagawara metro station along the 4.59 km Shadi Mahal Ramp - North Ramp stretch of the 21.25 km [[Pink Line (Namma Metro)|Pink Line]] of Namma Metro. In November 2019, ITD Cementation India emerged as the lowest bidder for this stretch which aligned closely with the original estimate, thus leading to successful award for this company. They commenced the construction of this metro station as per the agreements. |
||
=== Blue Line === |
|||
On November 17, 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the metro station, part of the 11 km Reach 2B – Package 1 (Krishnarajapura - Kempapura) of the 37.692 km [[Blue Line (Namma Metro)|Blue Line]] of Namma Metro. On September 14, 2021, Nagarjuna Construction Company Ltd. '''(NCC Ltd.)''' was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates.<ref>{{Cite web |date=2021-09-14 |title=NCC Wins Bangalore Metro Airport Line’s Construction Work |url=https://themetrorailguy.com/2021/09/14/ncc-wins-bangalore-metro-airport-lines-construction-work/ |access-date=2024-10-24 |website=The Metro Rail Guy |language=en-US}}</ref> As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.<ref>{{Cite web |last=Service |first=Express News |date=2021-09-16 |title=Nagarjuna Construction Company wins bid to build Namma Metro’s Airport Line |url=https://www.newindianexpress.com/cities/bengaluru/2021/Sep/16/nagarjuna-construction-companywinsbid-to-build-namma-metros-airport-line-2359335.html |access-date=2024-10-24 |website=The New Indian Express |language=en}}</ref> |
|||
==Station layout== |
==Station layout== |
||
Line 70: | Line 74: | ||
| legend = track |
| legend = track |
||
| collapsible = no |
| collapsible = no |
||
| map = |
| map = ENDEa\ENDEa |
||
PSTR(L)\PSTR(R) ~~ ~~ ~~ to Train Terminates Here |
PSTR(L)\PSTR(R) ~~ ~~ ~~ to Train Terminates Here |
||
*'''P#'''\PSTR(L)\PSTR(R)\*'''P#''' |
*'''P#'''\PSTR(L)!~STRg\PSTR(R)!~STRf\*'''P#''' |
||
PSTR(L)\PSTR(R) ~~ ~~ ~~ to [[Kadugundanahalli metro station|Kadugundanahalli]] ** |
PSTR(L)\PSTR(R) ~~ ~~ ~~ to [[Kadugundanahalli metro station|Kadugundanahalli]] ** |
||
HSTg\HSTf |
HSTg\HSTf |
||
Line 78: | Line 82: | ||
}}}} |
}}}} |
||
{|table border=0 cellspacing=0 cellpadding=3 |
{|table border=0 cellspacing=0 cellpadding=3 |
||
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width= |
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=30 valign=top|'''G''' |
||
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width= |
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=85 valign=top|Street level |
||
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width= |
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=500 valign=top|Exit/ Entrance |
||
|- |
|- |
||
|style="border-bottom:solid 1px gray;"|'''M''' |
|style="border-bottom:solid 1px gray;"|'''M''' |
||
Line 86: | Line 90: | ||
|style="border-bottom:solid 1px gray;"|Fare control, station agent, Ticket/token, shops |
|style="border-bottom:solid 1px gray;"|Fare control, station agent, Ticket/token, shops |
||
|- |
|- |
||
|style="border-bottom:solid 1px gray;" width= |
|style="border-bottom:solid 1px gray;" width=30 rowspan=3 valign=top|'''P''' |
||
|style="border-bottom:solid 1px white;" width= |
|style="border-bottom:solid 1px white;" width=85|<span style=color:#{{rail color|Namma Metro|Pink}}>'''Platform #'''<br/>'''Southbound'''</span> |
||
|style="border-bottom:solid 1px white;" width= |
|style="border-bottom:solid 1px white;" width=500|Towards → {{stl|Namma Metro|Kalena Agrahara}}<br><small>'''Next Station:''' [[Kadugundanahalli metro station|Kadugundanahalli]]</small> |
||
|- |
|- |
||
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Island platform]] | Doors will open on the right {{access icon}}</small> |
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Island platform]] | Doors will open on the right {{access icon}}</small> |
||
|- |
|- |
||
|style="border-bottom:solid 1px gray;" width= |
|style="border-bottom:solid 1px gray;" width=85|<span style=color:#{{rail color|Namma Metro|Pink}}>'''Platform #'''<br/>'''Northbound'''</span> |
||
| style="border-bottom:solid 1px gray;" width=" |
| style="border-bottom:solid 1px gray;" width="500" |Towards ← Train Terminates Here |
||
|} |
|} |
||
'''''{{rcb|Namma Metro|Blue|croute}} Station Layout - To Be Confirmed''''' |
'''''{{rcb|Namma Metro|Blue|croute}} Station Layout - To Be Confirmed''''' |
||
Line 109: | Line 113: | ||
}}}} |
}}}} |
||
{|table border=0 cellspacing=0 cellpadding=3 |
{|table border=0 cellspacing=0 cellpadding=3 |
||
|style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width= |
|style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width=30 valign=top|'''G''' |
||
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width= |
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=85 valign=top|Street level |
||
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=500 valign=top|Exit/Entrance |
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=500 valign=top|Exit/Entrance |
||
|- |
|- |
||
Line 117: | Line 121: | ||
|valign=top|Fare control, station agent, Metro Card vending machines, crossover<br/> |
|valign=top|Fare control, station agent, Metro Card vending machines, crossover<br/> |
||
|- |
|- |
||
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width= |
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=30 rowspan=4 valign=top|'''L2''' |
||
|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small> |
|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small> |
||
|- |
|- |
||
|style="border-bottom:solid 1px gray;" width= |
|style="border-bottom:solid 1px gray;" width=85|<span style=color:#{{rail color|Namma Metro|Blue}}>'''Platform #'''<br/>'''Northbound'''</span> |
||
|style="border-bottom:solid 1px gray;" width=500|Towards → {{stl|Namma Metro| |
|style="border-bottom:solid 1px gray;" width=500|Towards → {{stl|Namma Metro|KIAL Terminals}}<br><small>'''Next Station:''' [[Veerannapalya metro station|Veerannapalya]]</small> |
||
|- |
|- |
||
|<span style=color:#{{rail color|Namma Metro|Blue}}>'''Platform #'''<br/>''' |
|<span style=color:#{{rail color|Namma Metro|Blue}}>'''Platform #'''<br/>'''Southbound'''</span> |
||
|Towards ← {{stl|Namma Metro| |
|Towards ← {{stl|Namma Metro|Krishnarajapura}} / {{stl|Namma Metro|Central Silk Board}}<br><small>'''Next Station:''' [[HBR Layout metro station|HBR Layout]]</small> |
||
|- |
|- |
||
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2 align=center|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small> |
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2 align=center|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small> |
||
|- |
|- |
||
|style="border-bottom:solid 1px gray;" width= |
|style="border-bottom:solid 1px gray;" width=30 rowspan=2 valign=top|'''L2''' |
||
|style="border-bottom:solid 1px gray;" width= |
|style="border-bottom:solid 1px gray;" width=85| |
||
|style="border-bottom:solid 1px gray;" width=500| |
|style="border-bottom:solid 1px gray;" width=500| |
||
|- |
|- |
Latest revision as of 13:58, 11 December 2024
Nagawara | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Namma Metro station | ||||||||||||||||
General information | ||||||||||||||||
Location | 5th Block, Ashwath Nagar, HBR Layout, Bengaluru, Karnataka 560045 | |||||||||||||||
Coordinates | 13°02′26″N 77°37′29″E / 13.04051°N 77.62466°E | |||||||||||||||
Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | |||||||||||||||
Operated by | Namma Metro | |||||||||||||||
Line(s) | Pink Line Blue Line | |||||||||||||||
Platforms | Island platform (TBC) Platform-1 → Kalena Agrahara Platform-2 → Train Terminates Here Side platform (TBC) Platform-3 → Krishnarajapura / Central Silk Board Platform-4 → KIAL Terminals Platform numbers (TBC) | |||||||||||||||
Tracks | 4 (TBC) | |||||||||||||||
Connections | Nagawara Junction Bus Stop | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground (Pink Line), Elevated (Blue Line) & Double track x2 | |||||||||||||||
Platform levels | 4 (TBC) | |||||||||||||||
Parking | (TBC) | |||||||||||||||
Accessible | (TBC) | |||||||||||||||
Architect | ITD Cementation India Ltd. Nagarjuna Construction Company (NCC) | |||||||||||||||
Other information | ||||||||||||||||
Status | Under Construction | |||||||||||||||
Station code | (TBC) | |||||||||||||||
History | ||||||||||||||||
Opening | December 2026 (TBC) June 2026 (TBC) | |||||||||||||||
Electrified | (TBC) | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Nagawara is an upcoming important underground northern terminal metro station on the North-South corridor of the Pink Line[1] and upcoming elevated metro station on the Blue Line[2] of Namma Metro in Bengaluru, India. This metro station will be an interchange metro station between Pink Line and Blue Line.
This metro station will consist of the main Nagawara Junction which leads to Thanisandra, Yelahanka in the northside, Kalyan Nagar, Krishnarajapuram in the eastside, Bangalore East, Bangalore Cantonment in the southside and Hebbal, Yeswanthpur in the westside. It will also include prime locations like MSR Elements Mall, Bhartiya City and Manyata Embassy Business Park.
As per the latest updates, this metro station, under the second phase (Pink Line), covering the total distance of 13.8 km stretch (Dairy Circle - Nagawara) is expected to be operational around December 2026 [3][4][5][6][7][8] (under Blue Line) around June 2026.[9][10][11][12][13][14]
History
[edit]Pink Line
[edit]In June 2017, Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for constructing the Nagawara metro station along the 4.59 km Shadi Mahal Ramp - North Ramp stretch of the 21.25 km Pink Line of Namma Metro. In November 2019, ITD Cementation India emerged as the lowest bidder for this stretch which aligned closely with the original estimate, thus leading to successful award for this company. They commenced the construction of this metro station as per the agreements.
Blue Line
[edit]On November 17, 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the metro station, part of the 11 km Reach 2B – Package 1 (Krishnarajapura - Kempapura) of the 37.692 km Blue Line of Namma Metro. On September 14, 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates.[15] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.[16]
Station layout
[edit]Pink Line Station Layout - To Be Confirmed [17]
Nagawara track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and one Island platform
** Under Construction |
G | Street level | Exit/ Entrance |
M | Mezzanine | Fare control, station agent, Ticket/token, shops |
P | Platform # Southbound |
Towards → Kalena Agrahara Next Station: Kadugundanahalli |
Island platform | Doors will open on the right | ||
Platform # Northbound |
Towards ← Train Terminates Here |
Blue Line Station Layout - To Be Confirmed
Nagawara track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform # Northbound |
Towards → KIAL Terminals Next Station: Veerannapalya | |
Platform # Southbound |
Towards ← Krishnarajapura / Central Silk Board Next Station: HBR Layout | |
Side platform | Doors will open on the left | ||
L2 |
Connections
[edit]This section is empty. You can help by adding to it. (December 2023) |
Entry/Exit
[edit]This section is empty. You can help by adding to it. (December 2023) |
See also
[edit]- Bangalore
- List of Namma Metro stations
- Transport in Karnataka
- List of metro systems
- List of rapid transit systems in India
- Bangalore Metropolitan Transport Corporation
References
[edit]- ^ "Bengaluru Metro Pink Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
- ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
- ^ "Bengaluru: Namma Metro pushes Pink Line deadline to December 2026". Deccan Herald. Retrieved 4 November 2024.
- ^ Bureau, The Hindu (4 August 2024). "Namma Metro's Pink line likely to open in phases". The Hindu. ISSN 0971-751X. Retrieved 7 August 2024.
{{cite news}}
:|last=
has generic name (help) - ^ "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
- ^ "Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM". TimesNow. 10 February 2024. Retrieved 12 February 2024.
- ^ Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
- ^ "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.
- ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.
- ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by Q2 of 2024 / March 2025". TimesNow. 7 June 2023. Retrieved 14 December 2023.
- ^ "Metro line to Bengaluru Airport to be ready by Q2 of 2024 / March 2025: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
- ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
- ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
- ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
- ^ "NCC Wins Bangalore Metro Airport Line's Construction Work". The Metro Rail Guy. 14 September 2021. Retrieved 24 October 2024.
- ^ Service, Express News (16 September 2021). "Nagarjuna Construction Company wins bid to build Namma Metro's Airport Line". The New Indian Express. Retrieved 24 October 2024.
- ^ "Bengaluru Metro: Track-Laying Work Is Expected To Complete By Second Half Of 2024". News18. 28 September 2023. Retrieved 15 December 2023.
External links
[edit]- BMRCL English Archived 30 June 2019 at the Wayback Machine - BMRCL Official Website
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.