Jump to content

King Mountain Wind Farm: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Replacing geodata: {{coord missing|Texas}}
To provide a category
Line 22: Line 22:
[[Category:Wind farms in the United States]]
[[Category:Wind farms in the United States]]
[[Category:Energy resource facilities in Texas]]
[[Category:Energy resource facilities in Texas]]
[[Category:Upton County, Texas]]

Revision as of 20:02, 22 June 2009

The King Mountain Wind Farm is a 278.2 megawatt (MW) wind farm in Upton County, Texas, United States. 214 Siemens 1.3 MW wind turbines are sited in rows along the south-eastern and north-western edges of a mesa surrounded by deep ravines. The project was completed in December 2001. Annual electricity production is more than 0.75 TW·h.[1] The wind farm is owned by FPL Energy and the customers for the electricity generated are Reliant Energy (198.9 MW), Austin Energy (76.7 MW) and Texas-New Mexico Power Company (2.6 MW).

Dust, sand and high temperatures place extraordinary demands on the wind turbines. Consequently, the design was modified for the desert-like conditions, providing additional cooling and protection against wind-blown sand.[1]

See also

Template:EnergyPortal

References