Grand Central (train operating company): Difference between revisions
→Current fleet: GC only operates *one* class of train at present, so why have the Trainset column at all in that case? Removing it also means that the table isn't longer than most people's monitors, and so they don't have to scroll to see when the Adelantes were built |
→Current fleet: also, use of the word "Class" in the Class column is, IMO, rather superfluous (except, of course, in the heading) |
||
Line 181: | Line 181: | ||
! km/h |
! km/h |
||
|- |
|- |
||
| rowspan="2" |[[British Rail Class 180| |
| rowspan="2" |[[British Rail Class 180|180 ''Adelante'']] |
||
| rowspan="2" |[[File:Kings Cross station 2018 1.jpg|150px|]] |
| rowspan="2" |[[File:Kings Cross station 2018 1.jpg|150px|]] |
||
|[[Diesel multiple unit|DMU]] |
|[[Diesel multiple unit|DMU]] |
||
Line 188: | Line 188: | ||
|5 |
|5 |
||
|10 |
|10 |
||
|[[London King's Cross railway station|London King's Cross]] |
|[[London King's Cross railway station|London King's Cross]] – [[Sunderland railway station|Sunderland]] / [[Bradford Interchange]] |
||
|2000–01 |
|||
|2000-2001 |
|||
|- |
|- |
||
| colspan="7" |[[File:Grand Central Class 180.png| |
| colspan="7" |[[File:Grand Central Class 180.png|800px]] |
||
|} |
|} |
||
Revision as of 15:57, 12 August 2021
Franchise(s) | Open access operator Not subject to franchising 18 December 2007 – December 2026 | ||
---|---|---|---|
Main route(s) | Sunderland - London King's Cross Bradford Interchange - London King's Cross | ||
Fleet size | 10x Class 180 Adelantes | ||
Stations called at | 15 | ||
Stations operated | 0 | ||
Parent company | Arriva UK Trains | ||
Other | |||
Website | https://www.grandcentralrail.com/ | ||
|
Grand Central[1] is an open access train operating company in the United Kingdom, owned by Arriva UK Trains. It has operated passenger rail services on the East Coast Main Line from Sunderland to London King's Cross since December 2007, and from Bradford Interchange to London King's Cross since May 2010. A service from London Euston to Blackpool North via the West Coast Main Line was scheduled to begin in 2021, but was cancelled as a result of the COVID-19 pandemic.
History
The origins of Grand Central can be traced back to the privatisation of British Rail, when bids were lodged for the Midland Mainline and Regional Railways North East franchises by Ian Yeowart and a consortium of ex-British Rail managers under the Grand Central name.[2][3][4][5][6][7] The company was dissolved in March 1998.[2]
In April 2000 a new company, Grand Central Railway Company Ltd, was founded to pursue open-access opportunities.[8][9]
In 2003 Grand Central applied to the Office of Rail Regulation to operate a two-hourly open-access service from Newcastle via the Caldervale Line and Manchester Victoria to Bolton using ex Virgin CrossCountry InterCity 125 trains.[10][11] The application was rejected in June 2004.[12][13][14][15][16]
Coach operator Fraser Eagle Group purchased a 79% shareholding in Grand Central in 2004.[17]
In February 2005 Grand Central applied to the Office of Rail Regulation to operate four daily services from Sunderland to London King's Cross and four daily services from Bradford Interchange to London King's Cross using Class 67 locomotives hauling five Mark 3 carriages and a Driving Van Trailer.[18][19][20][21] In March 2006 the Office of Rail Regulation granted Grand Central access rights for three daily Sunderland to London King's Cross services.[22][23][24] After failing at an Office of Rail Regulation hearing to have the process reversed, GNER sought a judicial review of the decision to grant Grand Central access rights but was rejected by the High Court in July 2006.[25][26][27]
Fraser Eagle sold its 79% shareholding in Grand Central in March 2007 to two former managers of Prism Rail, backed by a private equity group.[28][29][30]
Operations were due to start in May 2007, but delays in procuring and then refurbishing rolling stock delayed this.[31][32][33]
Operations began on 18 December 2007 between Sunderland and London King's Cross. While awaiting delivery of all of the rolling stock, initially only one Sunderland - Kings Cross and one York - Kings Cross service operated in each direction.[34][35][36] The full timetable was introduced in March 2008.[37] Mechanical problems with the InterCity 125s led to services being regularly cancelled, resulting in a reduced service being operated from May until July 2008.[38][39]
In March 2008 Grand Central applied to the Office of Rail Regulation to operate three daily services from Bradford Interchange to London King's Cross.[40][41] In January 2009 Grand Central was granted access rights for three daily Bradford Interchange to London King's Cross services until December 2014 and a fourth Sunderland to London King's Cross service until May 2012.[42][43] In August 2009 the fourth daily Sunderland - London service started.[44][45]
The Office of Rail Regulation announced in February 2010 that all access rights had been extended until December 2016.[46]
On 23 May 2010 Grand Central services between Bradford Interchange and London King's Cross began.[47][48][49][50][51] It was hoped that the service would start in December 2009, but difficulties in securing rolling stock caused delay.[52]
In November 2011 Grand Central was bought out by Arriva UK Trains.[53][54][55] At the time of the takeover, Grand Central had 123 employees, a turnover of £18.9 million and debts of £44 million.[56]
From December 2011 Bradford services made an additional stop at Mirfield.[57] In December 2012, a fifth service was operated on the Sunderland to London route, however due to pathing difficulties it initially commenced at Hartlepool.[58] In December 2013, a fourth daily Bradford to London Kings Cross service commenced.[59]
In August 2014, Grand Central was granted an extension of its operating rights until December 2026.[60][61][62]
COVID-19 pandemic
From 3 April 2020, Grand Central temporarily suspended all services due to the COVID-19 pandemic.[63] A spokesperson for the company said "Grand Central has decided to suspend services and hibernate the company to protect their financial viability during this time of reduced passenger numbers." As Grand Central is not a franchised train operating company (TOC), it is not subject to the same government financial package as other franchised services.[64] The company resumed operations on 26 July 2020, initially operating a limited service of five return journeys per day, to increase over subsequent months.[65]
Following the second lockdown announced by the UK government, Grand Central announced on 3 November 2020 that it would once again suspend all services from 6 November 2020.[66] After the second lockdown ended, Grand Central resumed service on 3 December 2020 with a limited timetable and a reservation-only policy on all its services.[67]
Following the third lockdown announced by the government, Grand Central announced on 6 January 2021 that it would once again be suspending all services from 9 January 2021 until 1 March 2021.[68]
Routes and services
Current services
Grand Central (E) Services | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Grand Central connects Yorkshire and the North East to London with two routes.
Five daily services on the North East to London route run between Sunderland and London King's Cross calling at Hartlepool, Eaglescliffe, Northallerton, Thirsk and York. This route is known as the North Eastern service.[69] Grand Central has in the past given names to two trains on this route. Contrary to tradition in British named train services, these were individual one-way trips rather than pairs. In the 2008 timetable, the name The Zephyr was given to the early morning (06:41) departure from Sunderland, while the evening (16:50) train from London was called The 21st Century Limited. As of the 2012 timetable, these names are no longer used by the company.
Four daily services which run on the Yorkshire to London route operate between Bradford Interchange and London King's Cross calling at Low Moor, Halifax, Brighouse, Mirfield, Wakefield Kirkgate, and Doncaster. Some services also call at Pontefract Monkhill. This is known as the West Riding (or West Yorkshire) service.[69]
Service | Route | tpd | Calling at | |
---|---|---|---|---|
North Eastern | London King's Cross to Sunderland | 5 | York, Thirsk, Northallerton, Eaglescliffe, Hartlepool 4 trains per day on Sundays | |
West Riding | London King's Cross to Bradford Interchange | 4 | Doncaster, Pontefract Monkhill, Wakefield Kirkgate, Mirfield, Brighouse, Halifax, Low Moor Pontefract Monkhill is served by 3 trains southbound and 2 trains northbound on weekdays, 4 trains southbound and 1 train northbound on Saturdays, and no trains in either direction on Sundays. |
Proposed services
London Kings Cross to Cleethorpes
In December 2017, Grand Central announced plans to bid for a service from London Kings Cross to Cleethorpes in early 2018 for a date of 2020. It would involve the existing Bradford Interchange service extended to 10 coaches from London to Doncaster then dividing with five coaches going to Cleethorpes via Scunthorpe, Barnetby, Habrough and Grimsby.[70] The other five coaches would be the existing service to Bradford Interchange. This proposal would require permission for a split of trains as it has not been used on the East Coast Main Line before.[71] In February 2018, Grand Central announced plans for an additional call at Crowle.[72] It planned to operate 4 trains per day from 2020.[73] However in July 2018, the Office of Rail and Road announced new access charges which would affect the business case for the new service so Grand Central announced it would delay bidding until 2019.[73]
Extra Bradford and Sunderland Services
In March 2018, Grand Central announced that it had applied for six services from London to Sunderland, up from five now, and six services from London to Bradford Interchange, up from four now, which would use Adelante trains.[74]
York to London Kings Cross
In May 2018, Grand Central announced plans to add an additional evening service before 10pm between York to London. This service would be 10 carriages long.[75]
Wakefield Kirkgate to London Kings Cross
Grand Central applied for an additional early morning service and an evening services from London to Wakefield which was lodged to the Office of Rail & Road but was rejected because it did not meet the economic criteria.[76][77] However in May 2018, Grand Central reapplied for the service[78] This would see one train per day in each direction between London Kings Cross and Wakefield, one in the morning and one in the evening.
Peterborough
Grand Central also proposed an additional stop at Peterborough but this was rejected. This would see four services per day call here and Sunderland to London Kings Cross would provide this service.[76] In May 2018, Grand Central reapplied for the service.[78]
Formerly proposed services
Grand Central also previously expressed interest in operating other services.
York to Chester
In February 2005, Grand Central lodged an application with the Office of Rail Regulation to operate a three times a day York to Chester via the Caldervale Line service with Class 158s. This service would have called at Leeds, Wakefield Kirkgate, Brighouse, Rochdale, Manchester Victoria and Warrington Bank Quay.[18][79]
Bradford Interchange to London Euston
In September 2006 Grand Central announced a proposal to run services from Bradford Interchange via Huddersfield and the West Coast Main Line to London Euston. This service would have called at Halifax, Brighouse, Huddersfield, Stalybridge, Guide Bridge, Stockport, Crewe, Lichfield Trent Valley, Tamworth and Nuneaton.[80][81][82] The proposal was dropped due to Virgin Trains' Moderation of Competition protection preventing any other operators from operating on the West Coast Main Line.[83]
Lincoln to London King's Cross
In June 2010 following East Coast deciding not to proceed with plans for a proposed two hourly service between Lincoln and London King's Cross, Grand Central expressed an interest in running services, but was rejected. This service would have called at Newark North Gate and Grantham.[84]
Blackpool North to London Euston
In November 2010 Grand Central applied to the Office of Rail Regulation to operate a new service running four times a day in each direction between Blackpool North and London Euston via the West Coast Main Line, calling at Poulton-le-Fylde, Kirkham & Wesham, Preston, Hartford, Tamworth and Nuneaton. Grand Central sought to run these services from May 2012, using Class 67 locomotives hauling nine Mark 3 carriages and a Driving Van Trailer running at up to 110 miles per hour (177 km/h), until such time as the Blackpool North - Preston line was electrified.[85][86] In March 2011 the Office of Rail Regulation rejected the application on the basis the service would be primarily abstractive, meaning it would generate most of its revenue by drawing custom away from existing operators rather than bringing new custom to the rail network.[87]
Grand Central (W) Services | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Sister company Great North Western Railway originally re-applied for paths with former London North Eastern Railway InterCity 225 sets to begin a service between Blackpool North and London Euston from September 2019. As these are not able to tilt, their speed is restricted to 110 mph.[88][89]
In June 2018, the Office of Rail and Road approved the new application for a 7-year track-access agreement for five direct services from Blackpool North to London Euston, calling at Poulton-le-Fylde, Kirkham and Wesham, Preston, Nuneaton and Milton Keynes Central from September 2019.[90][91] An option for a sixth service in the future was available. The new service would have used the Mark 4 coaches as planned, but with Class 90 rather than Class 91 locomotives.[92]
In June 2019 the proposed services were transferred from GNWR owner Alliance Rail Holdings to Grand Central. The services were due to begin in spring 2020 but due to the coronavirus pandemic were postponed until spring 2021.[93] However, in September 2020 Grand Central announced that it had decided not to proceed with the introduction of the service following a collapse in projected patronage.[94]
Rolling stock
Grand Central's application to the Office of Rail Regulation in February 2005 had proposed using Class 67 locomotives hauling five Mark 3 carriages and a Driving Van Trailer.[18] As the paths were only granted on the basis of 125 mph stock being used, other stock had to be sourced. It was then proposed to use a fleet of Bombardier Transportation five-carriage Class 222s, similar to those already in use with Midland Mainline and Hull Trains.[23][95] Difficulty in securing these led to Grand Central deciding to use High Speed Trains.[96]
In October 2006 sister company Sovereign Trains purchased six Class 43 power cars and 18 Mark 3 carriages from Porterbrook.[97] The Class 43s, that all had buffers fitted when they were modified in the late 1980s for use with the Class 91 locomotives during the electrification of the East Coast Main Line, were sent for overhaul at Devonport Management Limited, Plymouth.[98][99] The Mark 3s were overhauled at Marcroft Engineering, Stoke-on-Trent. Eighteen of the Mark 3s were former Virgin Trains West Coast loco-hauled carriages that required rewiring in order to work with the power cars due to different electrical requirements.[100][101]
Due to delays encountered during the overhauls, Grand Central investigated leasing spare InterCity 125s from Midland Mainline.[102] However nothing came of this and it was not until December 2007 that enough stock had been delivered for operations to commence. The full fleet was in service by March 2008.[103][104][105]
Problems encountered with the rolling stock with at one stage all six power cars out of traffic, saw Grand Central hire Class 67s from English Welsh & Scottish, Class 47s from Riviera Trains and Class 57s from Virgin Trains to haul Riviera Trains Mark 2 carriages on shuttles from Sunderland to York in summer 2008 as well as InterCity power cars from Midland Mainline.[106][107][108][109]
In March 2010 the InterCity 125s were sold to Angel Trains which funded an overhaul including repowering the Class 43s at Brush Traction with MTU 16V4000R41 engines.[110][111][112][113]
To operate the fourth Sunderland service two Class 180s were leased from Angel Trains in 2009[114][115][116][117] followed in 2010 by another three to operate the Bradford services.[118][119] Before entering service, 180112 was named James Herriot in July 2009.[120] The remaining two units, 180105 and 180114, entered service later in 2009.[121] Grand Central secured two further Class 180s, 180101 and 180107, bringing the total number to five.[122] The Class 180 fleet operate both Sunderland and Bradford services, with the InterCity 125 trains usually only operating services to Sunderland, although they have operated to Bradford on occasions.[123]
Initially Grand Central adopted an all black livery with doors painted gold (first class) and silver (standard class). When the 180s were introduced an orange band was introduced.[124]
Grand Central withdrew its HST fleet at the end of 2017, with a transfer to East Midlands Trains for the three six-car sets. The company received five Class 180 Adelante sets from GWR, made available due to the rollout of the Intercity Express Programme.[125]
Current fleet
Class | Image | Type | Top speed | Carriages | Number | Routes operated | Built | |
---|---|---|---|---|---|---|---|---|
mph | km/h | |||||||
180 Adelante | DMU | 125 | 201 | 5 | 10 | London King's Cross – Sunderland / Bradford Interchange | 2000–01 | |
Cancelled fleet
Grand Central were to procure sets for services between Blackpool North and London Euston, made up of six Mark 4 Coaches hauled by a Class 90 Locomotive, and tailed by a Driving Van Trailer, however these were returned off-lease due to the cancellation of the route.[126] The rolling stock had already been overhauled and training runs had commenced before the service was cancelled in September 2020.[127]
Class | Image | Type | Top speed | Number | Carriages | |
---|---|---|---|---|---|---|
mph | km/h | |||||
Class 90 | Electric locomotive | 110 | 177 | 5[128] | 2 + 6 | |
Mark 4 | Passenger carriage | 140 | 225 | 30 | ||
Driving Van Trailer | Driving Van Trailer | 5 |
Past fleet
Trainset | Class | Image | Type | Top speed | Carriages | Number | Routes operated | Built | Withdrawn | |
---|---|---|---|---|---|---|---|---|---|---|
mph | km/h | |||||||||
InterCity 125 | Class 43 | Diesel locomotive | 125 | 201 | 6 | 6 | London King's Cross - Sunderland | 1976–82 | 2017 (Transferred to East Midlands Trains) | |
Mark 3 | Passenger carriage | 18 |
Depots
Grand Central's fleet is maintained at Heaton and Crofton depots. Between the 2011 Arriva takeover and the fleet's retirement in 2017, heavy maintenance on the InterCity 125 was performed at Arriva TrainCare, Crewe.[129]
References
- ^ Companies House extract company no 3979826 Grand Central Company Limited
- ^ a b Companies House extract company no 2867426 Grand Central Railway Company Limited (Mark 1)
- ^ "NYMR confirms RRNE bid plan" Rail Privatisation News issue 36 8 August 1996 page 6
- ^ "Grand Central to 'go it alone' with franchise bids as NYMR pulls out" Rail issue 289 9 October 1996 page 12
- ^ "RRNE franchise process revealed" Rail Privatisation News issue 45 9 January 1997 page 1
- ^ Grand Central & Marilyn GC Magazine Issue 1 Summer 2008
- ^ "Yeowart challenging the old guard" Archived 5 January 2010 at WebCite Rail issue 632 2 December 2009
- ^ Companies House extract company no 3979826 Grand Central Railway Company Limited (Mark 2)
- ^ "Grand Central Railway plans new use for HSTs" The Railway Magazine issue 1203 July 2001 page 15
- ^ Application to the Regulator for a Passenger Track Access Contract Under Section 17 of the Railways Act 1993 Archived 29 October 2007 at the Wayback Machine. Office of Rail Regulation.
- ^ "Grand Central announces Trans-Pennine plan" Entrain issue 24 December 2003 page 15
- ^ Application by Grand Central Railways Company Limited for a Track Access Contract Archived 29 October 2007 at the Wayback Machine Office of Rail Regulation June 2004
- ^ "Plans for new rail link hit the buffers". Huddersfield Daily Examiner. 23 June 2004. Retrieved 20 November 2011.
- ^ "Grand Central plans rejected as ORR says figures don't stack up" Rail issue 491 7 July 2004 page 10
- ^ "Grand Central's Trans-Pennine HST plan is axed by Regulator" Rail Express issue 99 August 2004 page 4
- ^ "Regulator gives thumbs down to Grand Central" The Railway Magazine issue 1240 August 2004 page 7
- ^ Fly like an eagle Archived 14 July 2014 at the Wayback Machine EN Magazine 2006
- ^ a b c Application to the Regulator for a Passenger Track Access Contract Under Section 17 of the Railways Act 1993 Archived 20 November 2008 at the Wayback Machine. Office of Rail Regulation.
- ^ [Class 67s and Mk 3s for Grand Central's London-Bradford plan Rail issue 505 19 January 2005 page 10
- ^ "Grand Central aims for Bradford service" The Railway Magazine issue 1246 February 2005 page 11
- ^ "GC asks ORR for London link" Rail issue 511 13 April 2005 page 17
- ^ Office of Rail Regulation decision on applications for the Track Access Rights necessary to operate additional passenger services on the East Coast Main Line Archived 1 December 2008 at the Wayback Machine Office of Rail Regulation March 2006
- ^ a b "Grand Central wins East Coast paths approval" Rail issue 533 15 February 2006 page 12
- ^ "Grand Central service approved as Hull Trains allowed to continue with fifth path" Today's Railways UK issue 53 May 2006 page 10
- ^ Allen, Katie (28 July 2006). "GNER fails to block rival's east coast line service". The Guardian. London.
- ^ "Decisions Decisions"[permanent dead link ]. Rail Professional. September 2006.
- ^ "GNER fury as Grand Central wins ECML paths" The Railway Magazine issue 1261 May 2006 page 4
- ^ Harrison, Michael (14 March 2007). "Former Prism bosses buy Grand Central in £10 million deal". The Independent. London. Archived from the original on 4 February 2009. Retrieved 9 June 2010.
- ^ "On track for a rail profit". Lancashire Telegraph. Archived from the original on 29 February 2020. Retrieved 24 June 2021.
- ^ "Grand Central sold but service unlikely to start on schedule" Rail Express issue 132 May 2007 page 6
- ^ Smith, Ross (7 October 2006). "London rail service winner has no trains". The Journal. Newcastle upon Tyne. Retrieved 9 June 2010.
- ^ "Second delay for new rail service". BBC News Online. 26 April 2007. Retrieved 27 April 2007.
- ^ "A message from Grand Central's new Managing Director Tom Clift" (Press release). Grand Central. 16 October 2007. Archived from the original on 14 November 2007. Retrieved 25 October 2007.
- ^ "Grand Central set for March launch". The Railway Centre. 22 February 2008. Archived from the original on 3 February 2009. Retrieved 25 February 2008.
- ^ "Latest news on Grand Central launch" (Press release). Grand Central. 19 November 2007. Retrieved 21 November 2007.[permanent dead link ]
- ^ "Right away at last for Grand Central" Today's Railways UK issue 74 February 2008 page 9
- ^ "Grand Central: worth the wait?" Rail issue 585 13 February 2008 page 41
- ^ "Train firm forced to cut services". BBC News. 20 May 2008.
- ^ "New delay for troubled rail firm". BBC News. 7 July 2008.
- ^ Track Access Rights on the East Coast Main Line Archived 25 June 2008 at the Wayback Machine Grand Union 28 March 2008
- ^ "Grand Union applies to run Bradford-London services" Rail issue 591 7 May 2008 page 14
- ^ ORR announces its proposed decision on East Coast Main Line track access applications Office of Rail Regulation 29 January 2009
- ^ "Grand Northern set for Bradford" Rail issue 611 11 February 2009 page 20
- ^ Clark, Kevin (17 August 2009). "Grand Central starts fourth train to King's Cross". Sunderland Echo. Retrieved 9 June 2010.
- ^ "Additional Grand Central service begins" The Railway Magazine issue 1302 October 2009 page 73
- ^ ORR approves East Coast Main Line track access applications Office of Rail Regulation 11 February 2010
- ^ "West Riding Timetable" (PDF). Grand Central. May 2010. Retrieved 20 November 2011.
- ^ "An historic journey to London with Grand Central West Riding Service". Huddersfield Daily Examiner. 20 May 2010. Retrieved 20 November 2011.
- ^ "May start for Grand Central Bradford services" Today's Railways UK issue 101 May 2010 page 11
- ^ "GC eyes further destinations as West Yorkshire trains start" Rail issue 645 2 June 2010 page 14
- ^ "Grand Central starts Bradford service" The Railway Magazine issue 1311 July 2010 page 6
- ^ Drury, Colin (19 August 2009). "London rail link blow: Service will be delayed until May". Halifax Evening Courier. Retrieved 21 August 2009.
- ^ "Arriva acquires open access operator Grand Central Railway" (Press release). Arriva. 4 November 2011.
- ^ Milner, Chris (5 November 2011). "Arriva acquires open access operator Grand Central Railway". The Railway Magazine. Horncastle. Archived from the original on 17 November 2011. Retrieved 12 February 2012.
- ^ "Germans buy open-access operator Grand Central". Railnews. Stevenage. 4 November 2011. Retrieved 12 February 2012.
- ^ Laing, Iain (5 November 2011). "Transport giant Arriva takeover (sic) Grand Central". The Journal. Newcastle upon Tyne. Retrieved 12 February 2012.
- ^ Mirfield gets direct rail services to and from London Grand Central 9 December 2011
- ^ Extra daily train service to and from London Kings Cross from December Grand Central 24 October 2012
- ^ "ORR approves Grand Central's fourth Bradford service" Rail issue 725 26 June 2013 page 15
- ^ Application to the Office of Rail Regulation for a track access agreement[permanent dead link ]. Grand Central. August 2013.
- ^ "Grand Central Sunderland to London rail service given 10 year extension" Archived 3 March 2016 at the Wayback Machine Sunderland Echo 7 August 2014
- ^ "GC green light to run until 2026" Rail issue 755 20 August 2014 page 13
- ^ Roden, Andrew (22 April 2020). "Grand Central suspends services for two months". Rail. No. 903. Peterborough. p. 8.
- ^ "Train firm suspends services over coronavirus". BBC News. 3 April 2020. Retrieved 5 April 2020.
- ^ "Grand Central relaunch rail services with more north east routes". ITV News. 26 July 2020. Retrieved 27 July 2020.
- ^ Laycock, Mike (3 November 2020). "York train company to suspend all services after lockdown starts". York Press. Retrieved 3 November 2020.
- ^ Farrell, Stephen (26 November 2020). "Grand Central to resume services in December". Insider Media. Retrieved 3 December 2020.
- ^ "Grand Central cancels ALL London to Bradford and Sunderland trains". RailAdvent. 6 January 2021. Retrieved 8 January 2021.
- ^ a b Timetable Grand Central
- ^ Grimsby and Cleethorpes could get direct trains to London by 2020 Grimsby Telegraph, 27 December 2017
- ^ Scunthorpe could get direct trains to London by 2020 Scunthorpe Telegraph, 27 December 2017
- ^ Scunthorpe to London rail link remains on track as plans move closer to becoming reality Scunthorpe Telegraph, 15 February 2018
- ^ a b "New rail charges could disrupt plan to run direct trains to Grimsby". GrimsbyLive. 12 July 2018. ISSN 0307-1235. Retrieved 24 June 2021.
- ^ Gerrard, Bradley (8 March 2018). "Virgin Trains rival Grand Central applies to run more services on East Coast mainline". The Telegraph. ISSN 0307-1235. Retrieved 24 June 2021.
- ^ "Plans for new evening train service between York and London". York Press. Retrieved 24 June 2021.
- ^ a b "Application To The Office Of Rail Regulation For A Passenger Track Access Agreement Or Amendment To A Passenger Track Access Agreement Under Sections 17-22A Of The Railways Act 1993" (PDF). Office Of Rail and Rail. Archived from the original (PDF) on 8 March 2018. Retrieved 24 June 2021.
- ^ "Train company blocked from running new services from Yorkshire to London". www.yorkshirepost.co.uk. Retrieved 24 June 2021.
- ^ a b "Application To The Office Of Rail Regulation For A Passenger Track Access Agreement Or Amendment To A Passenger Track Access Agreement Under Sections 17-22A Of The Railways Act 1993" (PDF). Office of Road and Rail. Archived from the original (PDF) on 17 May 2018. Retrieved 24 June 2021.
- ^ "Grand Central aims for Chester and Sunderland" Rail Express issue 103 December 2004 page 12
- ^ New rail routes planned The Telegraph 20 September 2006
- ^ Off to London from Huddersfield station The Huddersfield Daily Examiner 21 September 2006
- ^ "Grand Central plans for Huddersfield via WCML" Rail issue 549 27 September 2006 page 8
- ^ "Grand Northern drops Bradford-Euston bid" Rail issue 602 8 October 2008 page 18
- ^ "Lincoln to London rail service could be saved by another train operator". Lincolnshire Echo. Lincoln. 25 June 2010. Archived from the original on 27 June 2010. Retrieved 25 June 2010.
- ^ "Application to the Office of Rail Regulation for a passenger track access contract under section 17 of the Railways Act 1993" (PDF). Office of Rail Regulation. 2010. Archived from the original (PDF) on 11 November 2010.
- ^ Miles, Tony (December 2010). "Blackpool through service proposed in West Coast path frenzy". Modern Railways. London. p. 6.
- ^ "Regulator announces conclusions on future track access rights for the West Coast Main Line" (Press release). Office of Rail Regulation. 2 March 2011. Retrieved 27 October 2012.
refused Grand Central's application … failed our not primarily abstractive test
- ^ "Alliance drops Pendolino plan as Southampton paths identified". Railway Gazette International. London. 19 July 2017.
- ^ "Projects". Alliance Rail.
- ^ "Application for a new track access contract for services between London Euston and Blackpool North - Track access decision letter - 7 June 2018 | Office of Rail and Road". www.orr.gov.uk. Retrieved 24 June 2021.
- ^ "New Blackpool to London rail services approved" (Press release). York: Alliance Rail Holdings. 7 June 2018. Archived from the original on 10 September 2018. Retrieved 20 June 2018.
- ^ Clinnick, Richard (13 August 2019). "First Class 91 withdrawn from traffic by LNER". Rail. Peterborough.
- ^ "Grand Central follows Hull Trains in suspending open access services". Railway Gazette International. London. 6 April 2020. Retrieved 10 April 2020.
- ^ "Grand Central's planned Blackpool to London route falls victim to COVID-19" (Press release). Grand Central. 9 October 2020. Retrieved 5 April 2021.
- ^ "Grand Central wants Class 222s" The Railway Magazine issue 1252 August 2005 page 6
- ^ "GC in HST deal talks" Rail Issue 546 16 August 2006 page 14
- ^ Grand Central Railway to operate HST power cars and loco-hauled Mk3s TheRailwayCentre.com 5 October 2006
- ^ Sectorisation 125 Group
- ^ Privatisation October 2005 - Present 125 Group
- ^ "Grand Central buys HST and Mk 3s" The Railway Magazine issue 1268 December 2006 page 71
- ^ "Grand Central buys its own stock" Today's Railways UK issue 60 December 2006 page 6
- ^ "HST not ready for GC open access launch next month" Rail issue 564 25 April 2007 page 7
- ^ "More stock…Grand Central finally starts its full timetable" Rail issue 587 12 March 2008 page 13
- ^ "Full Grand Central service underway" Today's Railways UK issue 77 May 2008 page 15
- ^ "Grand Central's full service is up and running" The Railway Magazine" issue 1285 May 2008 page 78
- ^ Grand Central Class 47 Haulage, 2008 Archived 5 October 2012 at the Wayback Machine Sulzer Power
- ^ "Grand Central hires 67s as two of three HSTs fail" Rail issue 591 7 May 2008 page 16
- ^ "Grand Central turns to loco-hauled Mark 2s as HSTs struggle" Today's Railways UK issue 78 June 2008 page 11
- ^ "Grand Central ditches 47s in favour of 57s" Rail issue 595 2 July 2008 page 12
- ^ Angel Trains in HST Lease-Back Deal with Grand Central Angel Trains 2 March 2010
- ^ "Angel Trains buys Grand Central's High Speed Trains" Rail issue 639 10 March 2010 page 15
- ^ "Grand Central deal will see last six Valenta-engined HST power cars rebuilt" Rail Express issue 167 April 2010 page 5
- ^ "Angel acquires Grand Central HSTs: MTU engines on way" Today's Railways UK issue 101 May 2010 page 60
- ^ New Trains for the New Service Grand Central
- ^ "Two Adelantes on their way to Grand Central" Rail issue 613 11 March 2009 page 10
- ^ "Grand Central to get Adelantes" The Railway Magazine issue 1296 April 2009 page 83
- ^ "GC secures lease for two 180s" Today's Railways UK issue 89 May 2009 page 63
- ^ Grand Central signs up three additional trains for new 'West Riding' service Grand Central
- ^ Network Rail Acceptance of proposed vehicle change, 11 June 2008. [dead link ]
- ^ "Grand Central honours Yorkshire vet 'James Herriot'" (PDF). Railway Herald. No. 188. Scunthorpe. August 2009. p. 3. Retrieved 30 June 2011.
- ^ Miles, Tony (August 2009). "Third Adelante for Grand Union". Modern Railways. London. p. 92.
- ^ "GC sets out plan for five '180s' by 2010". Rail. No. 624. Peterborough. 12 August 2009. p. 15.
- ^ "Rare Bradford visit for Grand Central HST" Rail issue 766 21 January 2015 page 31
- ^ "New look GC HST" The Railway Magazine issue 1315 November 2010 page 76
- ^ "Grand Central to replace HSTs with cascaded Class 180s". Rail (UK). Retrieved 22 December 2017.
- ^ "Grand Central's planned Blackpool to London route falls victim to COVID-19 | Grand Central Rail". www.grandcentralrail.com. Retrieved 10 September 2020.
- ^ GC Blackpool training underway Railways Illustrated May 2020 page 8
- ^ "Twitter". mobile.twitter.com. Retrieved 20 February 2020.
- ^ Approval of the Twenty-sixth supplemental agreement to the track access contract between Network Rail Infrastructure Limited and Grand Central Railway Company Limited Office of Rail Regulation 17 April 2012
External links
Media related to Grand Central Railway at Wikimedia Commons