Jump to content

Langford Town metro station: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Restored revision 994776904 by Feroze Ahmad 2 (talk): Please don't blank redirects. If you think the redirect should be deleted, then you can take it to WP:RFD.
Tags: Twinkle New redirect Undo
Removed redirect to Pink Line (Namma Metro)
Tags: Removed redirect Mobile edit Mobile web edit
Line 1: Line 1:
{{Short description|Upcoming Namma Metro station under Pink Line}}
#REDIRECT [[Pink Line (Namma Metro)]]
{{Use dmy dates|date=August 2024}}
{{Use Indian English|date=August 2024}}

{{Infobox station
| name = Langford Town
| type = {{Namma Metro Infobox station line|line=Pink}}
| style = Namma Metro
| image =
| image_size =
| image_caption =
| address =
| coordinates =
| line = {{rcb|Namma Metro|Pink|croute}}
| other =
| structure = Underground, [[Double track]]
| platform = [[Island platform]] <small>''(TBC)''</small><br>
Platform-1 → {{stl|Namma Metro|Kalena Agrahara}} <br>Platform-2 → {{stl|Namma Metro|Nagawara}}<br><small>''Platform Numbers (TBC)''</small>
| operator = [[Namma Metro]]
| depth =
| levels = 2 '''''(TBC)'''''
| tracks = 2 '''''(TBC)'''''
| connections =
| parking = '''''(TBC)'''''
| bicycle =
| baggage_check =
| opened =
| opening = {{start date and age|December 2026|df=yes}} '''''(TBC)'''''
| closed =
| rebuilt =
| electrified = '''''(TBC)'''''
| accessible = '''''(TBC)'''''
| status = Under Construction
| code = '''''(TBC)'''''
| owned = [[Bangalore Metro Rail Corporation Ltd]] (BMRCL)
| architect = [[Afcons Infrastructure]]
| architectural_style =
| wifi =
| zone =
| smartcardname =
| smartcardstatus =
| former =
| passengers =
| pass_year =
| pass_rank =
| pass_percent =
| pass_system =
| mpassengers =
| services = {{Adjacent stations|system=Namma Metro|line1=Pink|left1=National Military School|to-left1=Nagawara|note-mid1=''(Operational around December 2026)''|right1=Lakkasandra|to-right1=Kalena Agrahara}}
| route_map = {{BMR Pink line}}
| map_state = collapsed
| mapframe = yes
| mapframe-marker = rail
| mapframe-marker-color = #{{rail color|Namma Metro|Pink}}
| mapframe-zoom = 14
}}
'''Langford Town''' is an upcoming underground metro station on the North-South corridor of the [[Pink Line (Namma Metro)|Pink Line]]<ref>{{Cite web |title=Namma Metro Pink Line: Route, Status, Completion Date & More |url=https://timesproperty.com/amp/webstories/namma-metro-pink-line-details-wid-913 |access-date=2023-12-15 |website=timesproperty}}</ref> of [[Namma Metro]] in [[Bengaluru]], India. This metro station serves the Langford Town area.

As per the latest updates, this metro station, under the second phase, covering the total underground distance of 13.8 km ([[Dairy Circle metro station|Dairy Circle]] - [[Nagawara metro station|Nagawara]]) is expected to be operational around ''December 2026.'' <ref>{{Cite web |title=Bengaluru: Namma Metro pushes Pink Line deadline to December 2026 |url=https://www.deccanherald.com/india/karnataka/bengaluru/bengaluru-namma-metro-pushes-pink-line-deadline-to-december-2026-3256417 |access-date=2024-11-04 |website=Deccan Herald |language=en}}</ref><ref>{{Cite news |date=2024-08-04 |title=Namma Metro's Pink line likely to open in phases |url=https://www.thehindu.com/news/national/karnataka/namma-metros-pink-line-likely-to-open-in-phases/article68484715.ece |access-date=2024-08-07 |work=The Hindu |language=en-IN |issn=0971-751X}}</ref><ref>{{Cite web |date=2023-06-25 |title=Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute |url=https://www.timesnownews.com/bengaluru/namma-metros-pink-line-this-upcoming-corridor-is-set-to-redefine-the-city-commute-article-101255989 |access-date=2023-12-15 |website=TimesNow |language=en}}</ref><ref>{{Cite web |date=2024-02-10 |title=Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM |url=https://www.timesnownews.com/bengaluru/namma-metro-phase-2-in-bengaluru-to-be-operational-by-2025-announces-karnataka-deputy-cm-dk-shivakumar-article-107571304 |access-date=2024-02-12 |website=TimesNow |language=en}}</ref><ref>{{Cite web |author=Staff Reporter |date=2023-09-27 |title=Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024 |url=https://www.metrorailnews.in/good-news-pink-line-of-bengaluru-metro-to-be-90-ready-by-second-half-of-2024/ |access-date=2023-12-15 |website=Metro Rail News |language=en-US}}</ref><ref>{{Cite web |date=2024-01-31 |title=Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week |url=https://www.timesnownews.com/bengaluru/namma-metro-bengalurus-under-construction-pink-line-slated-to-achieve-2-milestones-in-a-week-article-107286084 |access-date=2024-02-01 |website=TimesNow |language=en}}</ref>

==History==

In June 2017, Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for constructing the Dairy Circle metro station along the 3.66 km South Ramp - National Military School stretch of the 21.25 km Pink Line of Namma Metro. In November 2019, [[Afcons Infrastructure]] emerged as the lowest bidders for this stretch which aligned closely with the original estimate, thus leading to a successful award for this company. They commenced the construction of this metro station as per the agreements.

==Station Layout==
'''''Station Layout - To Be Confirmed'''''
{{stack|{{Routemap
| title = National Military School track layout '''''(TBC)'''''
| title-bg = #{{rail color|Namma Metro|Pink}}
| legend = track
| collapsible = no
| map = HSTg\HSTf
PSTR(L)\PSTR(R) ~~ ~~ ~~ to {{stl|Namma Metro|National Military School}} {{rcb|Namma Metro|Purple|croute}}
*'''P#'''\PSTR(L)\PSTR(R)\*'''P#'''
PSTR(L)\PSTR(R) ~~ ~~ ~~ to {{stl|Namma Metro|Lakkasandra}} **
HSTg\HSTf
| bottom = <div style="width:23.5em;text-align:center">Station with two tracks and one Island platform<br>** '''Under Construction'''</div>
}}}}
{|table border=0 cellspacing=0 cellpadding=3
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=30 valign=top|'''G'''
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=85 valign=top|Street level
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=500 valign=top|Exit/ Entrance
|-
|style="border-bottom:solid 1px gray;"|'''L1'''
|style="border-bottom:solid 1px gray;"|Mezzanine
|style="border-bottom:solid 1px gray;"|Fare control, station agent, Ticket/token, shops
|-
|style="border-bottom:solid 1px gray;" width=30 rowspan=3 valign=top|'''L2'''
|style="border-bottom:solid 1px white;" width=85|<span style=color:#{{rail color|Namma Metro|Pink}}>'''Platform #'''<br>'''Southbound'''</span>
|style="border-bottom:solid 1px white;" width=500|Towards → {{stl|Namma Metro|Kalena Agrahara}}<br><small>'''Next Station:''' {{stl|Namma Metro|Lakkasandra}}</small>
|-
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Island platform]] | Doors will open on the right {{access icon}}</small>
|-
|style="border-bottom:solid 1px gray;" width=85|<span style=color:#{{rail color|Namma Metro|Pink}}>'''Platform #'''<br>'''Northbound'''</span>
| style="border-bottom:solid 1px gray;" width="500" |Towards ← {{stl|Namma Metro|Nagawara}}<br><small>'''Next Station:''' {{stl|Namma Metro|National Military School}}</small>
|-
|style="border-bottom:solid 1px gray;" width=30 rowspan=2 valign=top|'''L2'''
|style="border-bottom:solid 1px gray;" width=85|
|style="border-bottom:solid 1px gray;" width=500|
|}

==Entry/Exit==
{{Empty section|date=December 2024}}

==See also==
*[[Bengaluru]]
*[[List of Namma Metro stations]]
*[[Transport in Karnataka]]
*[[List of metro systems]]
*[[Rapid transit in India|List of rapid transit systems in India]]
*[[Bengaluru Metropolitan Transport Corporation]]

==References==
{{reflist}}

==External links==
{{commons|Namma Metro}}
{{wikivoyage|Bengaluru}}
* [https://english.bmrc.co.in Bangalore Metro Rail Corporation Ltd. (Official site)]
* [http://www.urbanrail.net ''UrbanRail.Net''] – descriptions of all metro systems in the world, each with a schematic map showing all stations.
{{Portal bar|Bengaluru|Trains|Transport|Engineering}}
{{Namma Metro|pink line=yes}}


[[Category:Namma Metro stations]]
[[Category:Namma Metro stations]]

Revision as of 14:57, 11 December 2024

Langford Town
Namma Metro station
General information
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Pink Line
PlatformsIsland platform (TBC)
Platform-1 → Kalena Agrahara
Platform-2 → Nagawara
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeUnderground, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
ArchitectAfcons Infrastructure
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningDecember 2026; 23 months' time (December 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
National Military School
towards Nagawara
Pink Line
(Operational around December 2026)
Lakkasandra
Location

Langford Town is an upcoming underground metro station on the North-South corridor of the Pink Line[1] of Namma Metro in Bengaluru, India. This metro station serves the Langford Town area.

As per the latest updates, this metro station, under the second phase, covering the total underground distance of 13.8 km (Dairy Circle - Nagawara) is expected to be operational around December 2026. [2][3][4][5][6][7]

History

In June 2017, Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for constructing the Dairy Circle metro station along the 3.66 km South Ramp - National Military School stretch of the 21.25 km Pink Line of Namma Metro. In November 2019, Afcons Infrastructure emerged as the lowest bidders for this stretch which aligned closely with the original estimate, thus leading to a successful award for this company. They commenced the construction of this metro station as per the agreements.

Station Layout

Station Layout - To Be Confirmed

National Military School track layout (TBC)
P#
P#
Station with two tracks and one Island platform
** Under Construction
G Street level Exit/ Entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
L2 Platform #
Southbound
Towards → Kalena Agrahara
Next Station: Lakkasandra
Island platform | Doors will open on the right Disabled access
Platform #
Northbound
Towards ← Nagawara
Next Station: National Military School
L2

Entry/Exit

See also

References

  1. ^ "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. ^ "Bengaluru: Namma Metro pushes Pink Line deadline to December 2026". Deccan Herald. Retrieved 4 November 2024.
  3. ^ "Namma Metro's Pink line likely to open in phases". The Hindu. 4 August 2024. ISSN 0971-751X. Retrieved 7 August 2024.
  4. ^ "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  5. ^ "Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM". TimesNow. 10 February 2024. Retrieved 12 February 2024.
  6. ^ Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  7. ^ "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.