Wildorado Wind Ranch: Difference between revisions
Appearance
Content deleted Content added
Replacing geodata: {{coord missing|Texas}} |
No edit summary |
||
Line 1: | Line 1: | ||
[http://photos-h.ak.fbcdn.net/hphotos-ak-snc1/hs260.snc1/10731_706511208969_25814379_41298719_3945888_n.jpg]The |
|||
[[Wildorado Wind Ranch]] is located on approximately {{convert|16000|acre|km2}} {{convert|25|mi|km}} west of [[Amarillo, Texas]] and consists of 161 MW of [[wind turbine]]s (70 Siemens Mk II turbines each capable of generating 2.3 MW at peak wind speeds). These turbines have the capacity to meet the electricity demand of more than 50,000 households. The Wildorado Wind Ranch was developed by [[Cielo Wind Power]], of [[Austin, Texas]], in conjunction with [[Edison Mission Group]] of [[Irvine, California]].<ref>[http://www.renewableenergyaccess.com/rea/news/story;jsessionid=F23262664B8EA1414B1AF4D8ABAC31C6?id=44414 Siemens Receives 70-Turbine Order for Texas Project] ''Renewable Energy Access'', 22 March 2006.</ref><ref>[http://www.renewableenergyaccess.com/rea/news/story?id=48512 EMG Completes 161 MW Wind Project in Texas]</ref> |
|||
==References== |
==References== |
Revision as of 20:26, 20 September 2009
[1]The Wildorado Wind Ranch is located on approximately 16,000 acres (65 km2) 25 miles (40 km) west of Amarillo, Texas and consists of 161 MW of wind turbines (70 Siemens Mk II turbines each capable of generating 2.3 MW at peak wind speeds). These turbines have the capacity to meet the electricity demand of more than 50,000 households. The Wildorado Wind Ranch was developed by Cielo Wind Power, of Austin, Texas, in conjunction with Edison Mission Group of Irvine, California.[1][2]
References
- ^ Siemens Receives 70-Turbine Order for Texas Project Renewable Energy Access, 22 March 2006.
- ^ EMG Completes 161 MW Wind Project in Texas