Jump to content

PCMC Bhavan metro station

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by The Anomebot2 (talk | contribs) at 12:58, 21 March 2022 (Adding geodata: {{coord missing|India}}). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

PCMC Bhavan
Pune Metro station
General information
LocationPune
Owned byMaharashtra Metro Rail Corporation Limited (MAHA-METRO)
Line(s)  Purple Line
PlatformsSide platform
  • Platform-1 → Swargate
  • Platform-2 → Train terminates here
Tracks2
Construction
Structure typeElevated
Platform levels2
AccessibleYes Disabled access
History
Opened6 March 2022; 2 years ago (2022-03-06)
Services
Preceding station   Pune Metro   Following station
TerminusTemplate:Pune Metro lines
Route map
Bhakti Shakti Chowk Rainbow Bus Rapid Transit System
Tilak Chowk Rainbow Bus Rapid Transit System
Akurdi Rainbow Bus Rapid Transit SystemAkurdi railway station
Chinchwad Rainbow Bus Rapid Transit SystemChinchwad railway station
PCMC Bhavan Rainbow Bus Rapid Transit System
Sant Tukaram Nagar Rainbow Bus Rapid Transit System
Nashik Phata Rainbow Bus Rapid Transit System
Kasarwadi Rainbow Bus Rapid Transit SystemKasarwadi railway station
Phugewadi Rainbow Bus Rapid Transit System
Dapodi Rainbow Bus Rapid Transit SystemDapodi railway station
Bopodi
Khadki Khadki railway station
Range Hills
Mainline rail interchange Range Hills Depot
Shivaji Nagar Shivaji Nagar railway station
 Line 3 
Civil Court
Kasba Peth
Mandai
Swargate Rainbow Bus Rapid Transit System
Pushmangal Chowk
Shankar Maharaj Mutt
Rajiv Gandhi Zoological Park

PCMC Bhavan is a Pune Metro station in Pune, India and a terminal station of the Purple line. The station was opened on 6 March 2022 as an inauguration of Pune Metro.[1]Currently Purple Line is operational between PCMC Bhavan and Phugewadi.[2]

Station Layout

G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform No- 1, doors will open on the left Disabled access
Southbound Towards → Swargate next station is Sant Tukaram Nagar
Northbound Towards ← The train terminates here.
Side platform No- 2, doors will open on the left Disabled access
L2

An extension has been planned which will remove PCMC station's terminal status and extend the line to Nigdi.

References

  1. ^ "PM Modi inaugurates Pune Metro line; check routes and ticket prices here". Zee News. Retrieved 8 March 2022.
  2. ^ "Passenger operations on 12 km routes of Pune Metro launched know all about". Urban Transport News. Retrieved 8 March 2022.