User contributions for Travelslow
Appearance
Results for Travelslow talk block log uploads logs global block log global account filter log
A user with 65 edits. Account created on 22 September 2010.
5 July 2024
- 03:5703:57, 5 July 2024 diff hist 0 m David G. Mugar Mugar died, not Sugar died
5 April 2024
- 05:3605:36, 5 April 2024 diff hist −31 Tibbitt to Contwoyto Winter Road →History: Closed on or before April 4 per notice view-source:https://jvtcwinterroad.ca/news/ retrieved 2024-04-04
26 March 2024
- 07:2107:21, 26 March 2024 diff hist −14 m Tibbitt to Contwoyto Winter Road →History: remove aligncenter last edit
- 07:1807:18, 26 March 2024 diff hist −20 Tibbitt to Contwoyto Winter Road →History: Full Weight Reached on March 2, 2024 from https://jvtcwinterroad.ca/jv-tcwr-road-update-march-07-2024/ retrieved 2024-04-26
18 March 2024
- 16:1616:16, 18 March 2024 diff hist −12 m Tibbitt to Contwoyto Winter Road →History: Removed align left from history table to avoid text wrapping around table
- 15:5615:56, 18 March 2024 diff hist +127 Tibbitt to Contwoyto Winter Road →History: Updated History Statistics from 2024 JVC Winter Road Poster retrieved 2024-03-18
11 February 2024
- 06:2006:20, 11 February 2024 diff hist +74 Tibbitt to Contwoyto Winter Road →History: Added 2024 schedule from TCWR Road Update – Feb 05, 2024 https://jvtcwinterroad.ca/news/
12 April 2023
- 04:5904:59, 12 April 2023 diff hist +42 Tibbitt to Contwoyto Winter Road →History: 2023 Closing Status from April 4 Wayback Machine, change log on JVCwinterroad.ca
11 February 2023
- 07:3507:35, 11 February 2023 diff hist +21 Tibbitt to Contwoyto Winter Road →History: Actual Opening Date from https://www.mytruenorthnow.com/61778/featured/tibbitt-to-contwoyto-winter-road-opening-on-february-6th/
6 January 2023
- 16:4816:48, 6 January 2023 diff hist +91 Tibbitt to Contwoyto Winter Road →History: 2003 planned operational dates/number (https://www.nnsl.com/news/tibbitt-to-contwoyto-winter-road-moving-ahead-despite-mild-weather/)
7 April 2022
- 23:5223:52, 7 April 2022 diff hist +15 Tibbitt to Contwoyto Winter Road →History: Inserted planned closure date as there was no announcement publicly on the closure. As of Apr 7, the jvtcwinterroad.ca indicated it was closed.
12 February 2022
- 06:5706:57, 12 February 2022 diff hist −16 m Howard Frankland Bridge →The Future of the Howard Frankland Bridge: fixed grammar Tag: Reverted
- 06:4806:48, 12 February 2022 diff hist −392 Howard Frankland Bridge →Pedestrian and bicycle friendly: Deleted last sentence which is opinion, not referenced, and has bad grammar Tag: Reverted
4 February 2022
- 21:5121:51, 4 February 2022 diff hist +62 Tibbitt to Contwoyto Winter Road Added 2022 opening date and expected 7,800 loads north from JVC website press release retrieved 2022-02-04
3 September 2021
- 05:5305:53, 3 September 2021 diff hist +770 User talk:Travelslow →Please expand list of largest CA wildfires to 50 fires: new section current
28 May 2021
- 05:0405:04, 28 May 2021 diff hist +162 Pinellas Bayway Corrected 679 toll ($.35) and added replacement of 679 drawbridge
1 April 2021
- 20:1220:12, 1 April 2021 diff hist −9 Tibbitt to Contwoyto Winter Road →History: Closing Date Now April 6 - storm closed road 4 day early March, Storm Closed Road March 31 - April 3 from https://jvtcwinterroad.ca/wp-content/uploads/2021/03/Mar-30-2021-RE-Notice-of-Winter-Storm-Winter-Road-Closure-002-1.pdf
28 March 2021
- 07:2707:27, 28 March 2021 diff hist −65 Diamonds as an investment →Mining companies: Deleted "Alrosa is government owned, so is not listed on the stock market."
- 07:0007:00, 28 March 2021 diff hist −421 Tahera (mining company) →External links: Removed External Links as all are dead
- 06:5306:53, 28 March 2021 diff hist +195 Tibbitt to Contwoyto Winter Road →Primary route: Noting that with the mine closures, the road ends at Etaki, Lac De Gras https://jvtcwinterroad.ca/wp-content/uploads/2020/02/2020-TCWR-Mapbook.pdf
27 February 2021
- 19:5719:57, 27 February 2021 diff hist 0 m Kathryn Farmer Change tense from future to past as it is now Feb. 2021, Change Title to President and CEO copied from BNSF website
9 February 2021
- 23:4223:42, 9 February 2021 diff hist +13 Tibbitt to Contwoyto Winter Road →History: 2021 Expected Close Date March 31 Same Ref as previous
- 23:4023:40, 9 February 2021 diff hist +8 Tibbitt to Contwoyto Winter Road →History: added 2021 expected load range ref:https://jvtcwinterroad.ca/wp-content/uploads/2021/01/TCWR-RCD-GEN-031-2021-Winter-Road-Ingraham-Trail-Opening-Notice.pdf
- 23:3323:33, 9 February 2021 diff hist +62 Tibbitt to Contwoyto Winter Road →History: Add 2021 to history table Ref: https://cabinradio.ca/55377/news/health/coronavirus/ice-road-to-nwt-diamond-mines-opens-with-covid-19-measures/
30 October 2020
- 05:1305:13, 30 October 2020 diff hist −4 Tibbitt to Contwoyto Winter Road →History: Add 2020 Total Tonnage from operating summary https://nnsl.com/wp-content/uploads/2020/10/2020-Winter-Road-Operating-Summary.pdf
9 April 2020
- 16:2816:28, 9 April 2020 diff hist −9 Tibbitt to Contwoyto Winter Road →History: Recorded 2020 Closing Date April 8 from https://cklbradio.com/2020/04/08/tibbitt-to-contwoyto-winter-road-closes-for-season/
17 February 2020
- 02:3302:33, 17 February 2020 diff hist +90 Tibbitt to Contwoyto Winter Road →History: Updated missing historical stats published in the 2020 winter road poster: https://jvtcwinterroad.ca/wp-content/uploads/2020/01/2020-Winter-Road-Poster-1.pdf
8 May 2019
- 01:0801:08, 8 May 2019 diff hist −12 Tibbitt to Contwoyto Winter Road →History: amounts shipped 2019,2018 from https://nnsl.com/nwtnewsnorth/winter-road-haul-amounts-to-257176-tonnes/
4 April 2019
- 04:5404:54, 4 April 2019 diff hist −9 m Tibbitt to Contwoyto Winter Road →History: The actual 2019 close date was March 31 ref cabinradio.ca/14707/news/four-adults-and-a-child-rescued-on-closed-winter-road
30 January 2019
- 23:2923:29, 30 January 2019 diff hist +76 Tibbitt to Contwoyto Winter Road Updated 2019 opening date and expected number of loads from https://www.myyellowknifenow.com/35759/tibbitt-to-contwoyto-winter-road-opening-to-public-february-1st/
20 April 2018
- 04:4804:48, 20 April 2018 diff hist +1,618 Talk:Tibbitt to Contwoyto Winter Road →comment: history of opening closing dates back to 1984
- 04:2104:21, 20 April 2018 diff hist +16 Tibbitt to Contwoyto Winter Road Updated open/close dates from NWT Gov Transportation Spread sheet (http://www.dot.gov.nt.ca/Highways/Winter-Roads) retrieved 20180420
2 February 2018
- 06:0306:03, 2 February 2018 diff hist +20 Tibbitt to Contwoyto Winter Road →History: Opening date and traffic expectation http://www.cbc.ca/news/canada/north/tibbitt-road-opens-2018-1.4515200
22 January 2018
- 17:1817:18, 22 January 2018 diff hist +14 Tibbitt to Contwoyto Winter Road →History: 2016 expected freight https://www.myyellowknifenow.com/11504/winter-road-expecting-very-busy-year-as-it-opens-late/
- 17:1217:12, 22 January 2018 diff hist +5 Tibbitt to Contwoyto Winter Road →History: 2017 Open https://www.myyellowknifenow.com/20464/tibbitt-to-contwoyto-winter-road-opens-for-the-season/
- 17:0717:07, 22 January 2018 diff hist +95 Tibbitt to Contwoyto Winter Road →History: Open/Close Dates https://www.myyellowknifenow.com/22531/tibbitt-contwoyto-winter-road-close-midnight/
10 August 2017
- 04:5404:54, 10 August 2017 diff hist −200 Lewiston, Idaho →Geography: Removed negative comments about Army Corps. of Engineers which is irelevant and inappropriate for this article.
5 January 2017
- 19:3319:33, 5 January 2017 diff hist −196 Great Train Robbery (1963) →Fate of the Robbers: Tommy Wisbey death cited in table above (I didn't know how to name and reuse citation link above)
- 19:2019:20, 5 January 2017 diff hist +216 Great Train Robbery (1963) →Fate of the Robbers
3 October 2016
- 21:2021:20, 3 October 2016 diff hist −65 m Littleton, Massachusetts →Historical, civic and cultural organizations: removed duplicate link to Indian Hill Music
13 February 2016
- 05:5405:54, 13 February 2016 diff hist +107 Tibbitt to Contwoyto Winter Road →History: 2016 Opening Date and expected traffic from http://www.cbc.ca/news/canada/north/tibbitt-to-contwoyto-winter-road-opens-1.3439908
21 August 2014
- 00:4700:47, 21 August 2014 diff hist +1 m American butterfish →References: typo changed buttefish to butterfish
3 April 2014
- 01:0801:08, 3 April 2014 diff hist +52 Lysimachia →Selected species
- 01:0401:04, 3 April 2014 diff hist +62 Lysimachia →Selected species
- 01:0001:00, 3 April 2014 diff hist +54 Lysimachia →Selected species
- 00:5500:55, 3 April 2014 diff hist +55 Lysimachia →Selected species: added common name and edemic to L. venosa
5 February 2014
- 05:5105:51, 5 February 2014 diff hist +51 Tibbitt to Contwoyto Winter Road →History: Added 2014 Opening Date : http://hqyellowknife.com/news/local/news/v/Local/341850/Tibbitt-to-Contwoyto-winter-road-now-open
8 April 2013
- 02:2102:21, 8 April 2013 diff hist +70 Tibbitt to Contwoyto Winter Road →History 2913 statistics from jvtcwinterroad.ca
22 March 2013
- 05:4305:43, 22 March 2013 diff hist +3 RIA (restaurant) No edit summary
- 05:4005:40, 22 March 2013 diff hist −108 RIA (restaurant) Restaurant closed July 27, 2012 links gone